Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Effect on Metallurgical Recoveries of Inaccuracies in Assay Results

    It is the purpose of this paper to produce some evidence on the accuracy to be expected from normal assay procedure using the usual first class equipment, and to examine the effect that many assaying

    Jan 1, 1952

  • AUSIMM
    Gaseous products of weathered coal during the process of spontaneous combustion

    By Y Zhang, X Yi, J Deng, J Zhao, J Song

    To obtain the combustion process of a coal fire, a high-temperature programmed system is used to simulate the spontaneous combustion process of fresh and weathered coals. Both fresh coal and weathered

    Aug 28, 2017

  • AUSIMM
    Opening Address

    Mining is a global industry. The conference is a good example of this, as itÆs jointly organised by professional associations from Canada, Australia and South Africa, and has attracted speakers and de

    Jan 1, 2006

  • AUSIMM
    Effects of Ventilation Leakage in Deep, Hot Room and Pillar Operations

    By S Bluhm, R Funnell

    Creative mine-designs are constantly being applied in the deep platinum mining industry in South Africa. Recently, this has resulted in deep hot mine-designs including room and pillar, bord and pillar

    Jan 1, 2005

  • AUSIMM
    A higher standard of ‘safety’

    By A Turns

    In a survey conducted by symplexi with underground miners in Australia; 78 per cent of participants believed that ‘safety’ is all about people. If ‘safety’ is about people, then is the mining industry

    May 5, 2022

  • AUSIMM
    A Multi-year Assessment of Landform Evolution Model Predictions for a Trial Rehabilitated Landform

    By G Hancock, J Lowry, T Coulthard, W Erskine, M Saynor

    An important part of planning for the rehabilitation of uranium mine sites is the ability to assess the geomorphic stability of the final landform, over time frames ranging from decades to millenia. D

    Jul 16, 2014

  • AUSIMM
    Estimation of bubble size distribution and local turbulence in a bubbly flow system

    By P Ireland, S Mitra, G Evans, A Wang, M M. Hoque

    This work presents an experimental study of flow dynamics in a bubble column system (crosssection: 100 mm × 100 mm) using a non-intrusive optical technique with targeted application in a novel REFLUX™

    Aug 24, 2022

  • AUSIMM
    Caterpillar 3500 Series Engines for Off Highway Trucks

    A new engine family has been developed by Caterpillar Tractor Co. for application in off-highway trucks. This family, the 3500 Series is available in three configurations, covering a 600-1200 kilow

    Jan 1, 1982

  • AUSIMM
    Operation of deep mill level zone mixed flow fans after the first fan upgrade – a parallel fans case study

    By K Lownie, R Sani, A Sianturi

    Part of the PT Freeport Indonesia (PTFI) mine production is in the process of transitioning from the deep ore zone (DOZ) mine to the deep mill level zone (DMLZ) mine. The DMLZ mine is the next lift in

    Aug 28, 2017

  • AUSIMM
    Ranger - The 5 Star Mine

    By Resta S. A

    Energy Resources of Australia Ltd - Ranger Mine is located about 255 kilometres east of Darwin in the Alligator Rivers Region of the Northern Territory. The Ranger project is surrounded by Kakadu Na

    Jan 1, 1994

  • AUSIMM
    Spodumene: A Mineral Source of Lithium

    By Elliott A, Kingsnorth D. J

    The development of a large high grade spodumene orebody, in excess of 30M tonnes containing at least 7M tonnes at 4.0% Li20, by Lithium Australia Ltd at Greenbushes, Western Australia is significan

    Jan 1, 1989

  • AUSIMM
    Heat load assessment and mine cooling strategies for a longwall coalmine

    By M Olsen, L van den Berg

    Bowen Basin coalmines suffer from hot and humid ambient conditions during the summer period. The ambient conditions combined with high VRTs, increasing depth of working and significant equipment heat

    Aug 28, 2017

  • AUSIMM
    Bituminous Geomembranes in Mine Construction

    By R McIlwraith, B Breul

    "This paper discusses the successful use of bituminous geomembranes (BGMs) in mining applications since their development in 1974. It explains and illustrates the structure of a BGM composite, which i

    Jul 27, 2015

  • AUSIMM
    Developments in the Design of Quarry Crushing Plants and Storage Bins at the Broken Hill Proprietary Co. Ltd.

    The changes in layout and design over 48 years, from the first crushing and shiploading plant installed at Whyalla in 1915, up to the present plant being built at Koolan Island, Yampi Sound may be sum

    Jan 1, 1963

  • AUSIMM
    Measured Resources and Proven Reserves – Are they still Relevant?

    By S Juras

    The terms measured resources and proven reserves denote the highest level of estimation confidence in all of the major classification schemes. But what do they really bring to today’s project or mine

    Aug 22, 2011

  • AUSIMM
    Pollution Burden Around Road Tunnels

    By J Meinhart, J Rodler, I Katolicky

    The ever increasing number of vehicles is leading to slow-moving and even stationary traffic sitting longer in traffic jams over extensive city areas. This traffic situation causes a sharp increase in

    Jan 1, 1999

  • AUSIMM
    Design of a Leaching Strategy to Extract Gold from Eleonore Mine Ultra-Fine Sulfide Concentrate

    By G DeschOnes, M Fulton

    The Eleonore property (James Bay district of Northern QuTbec), owned by Goldcorp, hosts gold within stockworks of quartz-tourmaline-arsenopyrite veins and veinlets contained within microcline (potassi

    Sep 26, 2013

  • AUSIMM
    Data Metallogenica ù Around the Pacific Rim and Across the World

    By A D. T Goode

    Data Metallogenica (DM) is unique as a global mineral sample collection and deposit database with over 70 000 rock samples and a wide range of descriptive, photographic and measurement data. Subscribe

    Jan 1, 2004

  • AUSIMM
    A Cost Comparison between Empirical and Engineered Support and Reinforcement Designs for Tunnels in a Low Stress Environment

    By L Nienaber

    Mines, after becoming operational, often retain the same support and reinforcement designs developed in the feasibility study. These designs are conceived from limited drilling data and regional exper

    Mar 8, 2011

  • AUSIMM
    Mine Planning and Risk Management Associated with the Breakthrough of the Telfer Sublevel Cave into the Active Telfer Open Pit

    The Telfer main dome open pit is operated by Newcrest Mining Limited at a current production rate of 50 Mt/a from a pit dimension compromising 2 km strike length, 1 km width and 250 m depth. As part o

    May 1, 2010