Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Methodology for Geometallurgical Mapping and Orebody Modelling

    By L Keeney

    Geometallurgy is not a mechanism designed to replace current geological and metallurgical deposit characterisation but an added component required to understand orebody variability. Current geological

    Sep 5, 2011

  • AUSIMM
    Geology, Grade Control and Reconciliation at the Douglas Mineral Sands Deposit

    The Douglas mineral sands deposit is located 75 km north of Hamilton in western Victoria, Australia. The deposit was discovered in the late 1990s by Basin Minerals Limited and purchased by Iluka Resou

    Jan 1, 2009

  • AUSIMM
    A deep learning based approach for roof bolt recognition in 3D point cloud of underground mines

    By B P. Banerjee, D Patra, S Raval

    Roof bolts are an essential component of roof support systems in underground mines. They are used to provide structural support to the roof of the mine and prevent it from collapsing. Therefore, it is

    Sep 1, 2024

  • AUSIMM
    Analyses of pressure drop in high temperature zone during iron ore sintering

    By S Mitra, T Singh, D O’Dea, T Honeyands

    Permeability and air flow rate in the bed during iron ore sintering is crucial to controlling the sinter quality and productivity of a sinter plant due to its influence on the flame front speed. In th

    Nov 8, 2021

  • AUSIMM
    Risk-based approach for minimising tailings dam failures

    By M Barker, H Li

    The total number of tailings accidents has reduced from over 50/decade in the 1960s-1980s to less than 30/decade in the 2000s to 2010s. However, the rate of significant tailings dam failures has not

    Jul 23, 2018

  • AUSIMM
    Developments in Steel Recycling Technology

    By Y Pan

    The recycling of steel is a crucial aspect of the shift toward a sustainable metals industry. The emphasis on steel recycling through the introduction of the scrap based mini-mill concept is also matc

    Jan 1, 2004

  • AUSIMM
    Tube bundle analyser flow rate, why it is important

    By M Tsai

    Tube bundle gas monitoring systems have been used in the mining industry for over 50 years. The initial design was based on four individual gas analysers along with a series of solenoid valves, gas sa

    Oct 12, 2022

  • AUSIMM
    San Vicenter Zinc-Lead Rhythmite Deposit, Peru: A Mississippi Tejada Rospihloisi, Krouse H.B.

    By Rospigliosi RT, Krouse HR

    The San Vicente stratabound zinc-lead rhythmite deposit, Peru, is hosted in carbonates of the Late Triassic - Early Jurassic Pucara Group. These strata were deposited in a large, shallow water, carbon

    Jan 1, 1990

  • AUSIMM
    Stope Cleaning - Historical Methods

    In classical drill and blast underground mining methods, especially narrow vein operations economic quantities of broken ore can be left behind following normal mucking operations on the stope floors.

    Aug 1, 2010

  • AUSIMM
    Cut-and-Break, a 'New' Method of Rock Excavation

    By Seib W

    In cut-and-break rock excavation use is made of the fact that breaking rock in tension towards a free face requires a specific energy of excavation which is small in comparison with that required for

    Jan 1, 1992

  • AUSIMM
    Reducing Mining and Mineral Processing Plant Fatality Rates

    By N Cann

    In the 10 years from 1998 to 2008 the annual number of fatalities in the Australian mining industry has plateaued (MCA, 2007-08 and abc.net.au website). Despite significant efforts to eliminate fatali

    Aug 8, 2011

  • AUSIMM
    On-Line Cyanide Analysis and Control

    Cyanide is a significant contributor to the cost of producing gold. Any reduction in cyanide consumption that is achieved through more reliable measurement, and/or more efficient management of cyanide

    Jan 1, 1997

  • AUSIMM
    Risk and Accepted Practice in Open Pit Mining Geomechanics

    The paper examines the current status of risk and accepted practice in mining geomechanics. It explores some deficiencies in human capital, risk analysis and our future technical needs, and suggests w

    Jan 1, 2003

  • AUSIMM
    Computer Usage for Grade Control and Short Term Planning

    Computer applications are ideally suited to the day to day operations of grade control and short term planning on a mine site. By refining this part of the operation there is scope to increase prof

    Jan 1, 1989

  • AUSIMM
    Design and testing of high capacity surface support

    By T Roberts, S Talu

    Steel wire weld mesh is a common industry standard surface support used in underground mining, traditionally installed with mining drills during the bolting cycle. As underground mining depth and stre

    Nov 30, 2018

  • AUSIMM
    The Hunt for Hydrous Bedded Iron Deposits - An Investigation into Flinders MinesÆ Blacksmith Tenement

    By M F. Jennings, N J. Corlis, B J. Thomas, L N. Tylkowski, A E. Petts, G D. McDonald

    Flinders Mines is an iron ore explorer and developer with a tenement package located in the Hamersley Ranges region of Western Australia, approximately 70 km north of Tom Price. Exploration over the p

    Aug 12, 2013

  • AUSIMM
    When Organisations Fail: New Thinking on Disasters

    Disasters are often tragic outcomes of high-risk technologies such as mines. In Australia, more mines are being developed every day, and the risk of disasters is ever increasing. No matter how effecti

    Jan 1, 1999

  • AUSIMM
    The Geology of the Kidston Gold Mine

    By Lewis RW, Tullemans FJ, Gallo JB

    Gold mineralization at Kidston occurs in a semicontinuous zone near the margin of a large, late Palaeozoic breccia pipe. The pipe is ovoid in plan, funnel-shaped in cross section and straddles a c

    Jan 1, 1986

  • AUSIMM
    Spatial distribution of major, minor and trace elements in iron ores, using micro-XRF technology

    By N J. Potter, N W. Brand, J M. F Clout

    The increasing demand for iron ore with low concentrations of trace elements, puts increasing pressure on iron ore producers for high-quality material. Understanding the mineralogy, petrography, chemi

    Nov 8, 2021

  • AUSIMM
    Treatment Plant Innovation at Garden Well

    By W T. C Kendall, H D. Ngo

    Garden Well is a shear-hosted Archaean orogenic gold deposit located 100 km north of Laverton, Western Australia. The Garden Well processing plant is designed for a nominal 491 t/h milling rate and an

    Sep 26, 2013