Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Development and Implementation of Spin-to-stall Resin at Anglo American’s Australian Underground Coal OperationsBy P Craig, I Canbulat, J Naylor, J Emery, A Sykes
Longwall mining is by far the most common method of underground coal extraction in Australia. Industry trends and expectations are placing increasing emphasis on the reliability and productivity of th
Nov 5, 2014
-
Characteristics and Sintering Performance of Iron Ore SinterBy T Raynlyn, A Edenton, M Adam, R J. Holmes, J R. Manuel, N Ware, R Smyth
Due to ongoing demand and increasing depletion of high-grade iron ore resources from large deposits, Australian iron ore producers are developing smaller size deposits to maintain current export level
Jan 1, 2009
-
Working in Metallurgy ResearchWhen studying minerals degrees at university, all the emphasis is towards sending the graduates into the bush to work at a remote mine; however, that is not the only option available to new graduates.
Jan 1, 2006
-
New Methods for Mapping the Structure of Rock MassesRemote sensing techniques can be used to map joint sets in a rock mass for the estimation of in situ block size distribution and improved optimisation of blasting. This paper reviews remote sensing us
Jan 1, 2001
-
Implementation of the BIOX® process at the Runruno Gold projectBy J A. van Niekerk, J G. Jardine, J W. Olivier
The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-
Sep 11, 2017
-
Improved Technology – Selection of a Suitable Underground Concrete Transport VehicleBy S Mitchell
Jetcrete Australia Pty Ltd, shotcrete contractor took the initiative in 2008 to discontinue the use of ‘road registerable’ concrete trucks for all underground works in Australia and internationally.Th
Mar 21, 2011
-
The Superpit Schedule Model – A Time-efficient Data-driven Estimation for Short- and Medium-term PlanningBy T Berryman, C Adams, L Griesel, C Buxton
The Kalgoorlie Consolidated Gold Mines (KCGM) schedule model is used for short- to medium-term planning and scheduling at the Fimiston Open Pit Mine (the Superpit). The model bridges the gap between g
Aug 18, 2014
-
Recent Developments in Shaft Sinking and Tunnelling in Melbourne's Sewerage SystemOne of the responsibilities of the Melbourne and Metropolitan Board of Works is to provide a sewerage system for the metropolis of Melbourne which now contains over 2.5 million people. In providing
Jan 1, 1976
-
Measuring and Taking Notice of Orebody Variability – An Essential Ingredient for Reliable Plant DesignBy D David
The majority of SAG and ball mill design methodologies are applied using a single design value for mill selection, such as the 80th percentile ball mill work index or SMC value. Inherent in the select
Sep 7, 2015
-
Delineate Three-Dimensional Iron Ore Geology and Resource Models Using the Potential Field MethodBy A Guillen, J-P ChilFs
Most 3D geological modelling tools were designed for the needs of the oil industry or detailed mine planning and are not suited to the variety of situations encountered in other application domains. M
Jan 1, 2009
-
Concept and Operation of the New Conventional Cell House of Asturiana de Zinc at San Juan de Nieva, SpainBy LefTvre Y
In May 1991, AZSA commissioned a new conventional Cell House. This paper focuses on the major improvements introduced in the design and the construction of the equipment, machinery and control. An e
Jan 1, 1993
-
JORC and Mineral Resource Classification SystemsThe JORC Code contains a mandatory classification system for Mineral Resource and Ore Reserve estimates for public reporting. The classification is a statement of the Competent PersonÆs confidence in
Sep 26, 2011
-
Rock Bolts for Permanent Tunnel LiningBy J de Witte
When used in suitable ground conditions, rock bolts can have advantages over other permanent tunnel lining solutions. Permanent rock bolts offer flexibility in tunnelling profile and rapid rock bolt i
Mar 8, 2011
-
Developing flotation circuit control and automation for the Phu Kham Copper-Gold Operation concentratorBy L Mikhael Gurieff, D Baas
The Phu Kham Copper-Gold Operation (Phu Kham Operation) is located in the Lao People's Democratic Republic and is owned and operated by the Lao-registered company, Phu Bia Mining Limited (PBM). Au
Aug 29, 2018
-
Magnesium Alloy Production in China ù The Quay Magnesium ExperienceQuay Magnesium Limited (QMG) listed on the Australian Stock Exchange in late September 2004 having raised approximately A$30 million with the object of designing, constructing, commissioning and opera
Jan 1, 2006
-
Cooling on demand – the next step in ventilation automationBy F C. D Michelin
As mines get deeper, the critical underground temperature limits will be exceeded, and an increasing number of mines will need to implement, expand or modify cooling systems. Surface cooling plants ha
Oct 12, 2022
-
The Automation of Western Mining Corporation's Olympic Dam Underground Rail Haulage SystemBy D Mee
The Western Mining site at Olympic Dam, near the community of Roxby Downs in South Australia is one of the largest orebodies of its type in the world. It contains known reserves of over 10.6 M tonne o
Jan 1, 2000
-
Incorporation of ore sorting into a proposed greenfields tin mining and processing project in MoroccoBy A N. Parry
In May 2018 Kasbah Resources Limited (“Kasbah”) completed an ore sorting test work program which was a precursor to releasing in July 2018 an updated Definitive Feasibility Study (“DFS”) for the Achmm
Nov 10, 2020
-
Modelling of an Integrated Waste Storage FacilityBy P Edmondson, S Narendranathan, S Setchell
The complexities of mining in current economic conditions, where ore extraction schedules are varied on a weekly basis so as to ensure constant supply to the process plant, can result in a number of s
Jul 27, 2015
-
Wireless System for Monitoring Cave-back PropagationBy S Steffen, S Talu, J Poulsen, G Watt, A van As, J S. Ooi
The economic success of cave mining projects is significantly influenced by the secondary fragmentation size distribution of the caved orebody and making the fragmented ore available for extraction. I
May 9, 2016