Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Water Quality Standards with Reference to the Mining Industry in New Zealand

    Water quality standards for some of the substances likely to be discharged to natural waters by the mining industry are discussed. After briefly examining how uses of water can be affected by discharg

    Jan 1, 1986

  • AUSIMM
    Carbothermic Reduction of Iron Oxide and Coal Composite in Packed Bed Combustion Process

    By T Kitajima, T Kawaguchi, T Nakamura

    Carbothermic reduction of iron oxide is an attractive mechanism to produce metallic iron, since it can directly utilise coal as both reductant and fuel. To improve energy efficiency and productivity o

    Jan 1, 2000

  • AUSIMM
    Standardising the Reconciliation Factors Required in Governance Reporting

    By J Centofanti, D Conti, R Riske, C Morley, A Cook

    Why is it so difficult? Why are there differences throughout the resources industry in how reconciliation factors are reported and calculated? Why is there no standard formula to use? These are common

    Jan 1, 2009

  • AUSIMM
    The Application of Table Flotation to the Removal of Arsenopyrite from Galena Concentrates and Silica from Lime Sands

    This paper deals with the application of table flotation to two unusual mineral dressing problems. Both problems involved the removal of interfering minerals at sizes too coarse to normal froth flotat

    Jan 1, 1954

  • AUSIMM
    Proximity Cameras and Global Positioning Systems - An Integrated Approach

    Safe, efficient production is a common objective for all large open pit mines. Despite comprehensive policies, procedures and regulations aimed at protecting workers, several people die each year in m

    May 1, 2010

  • AUSIMM
    Incorporating economic variability into a strategic planning framework

    By E Holloway

    The optimisation of an open pit mine can be broadly split into two stages, the first being the ultimate pit optimisation (and subsequent stage designs), and the second being schedule optimisation. Mac

    Nov 21, 2018

  • AUSIMM
    Reducing the Energy Required in Grinding Clinker to Cement – Some Case Studies

    By H Benzer

    Grinding clinker to finished cement consumes more energy than any other comminution process. World production of cement in 2009 was 2840 million tonnes and the energy required for comminution was 40-6

    Aug 8, 2011

  • AUSIMM
    Reproduction of inequality constraint between iron and silica for accurate production scheduling

    By N Madani, S Abulkhair, N Morales

    Conventional geostatistical algorithms cannot reproduce bivariate complexities such as inequality constraint, nonlinearity and heteroscedasticity. Poor reproduction of these features may decrease the

    Nov 8, 2021

  • AUSIMM
    Concentration of Igneous Phosphate Ores via Froth Flotation - Challenges and Developments

    Igneous phosphate deposits located in tropical and subtropical regions of the world are characterised by low P2O5 grades, very diversified mineralogy and intensive lateral plus vertical variations in

    Sep 13, 2010

  • AUSIMM
    New Empirical Equations to Estimate the Hydraulic Aperture of Rock Discontinuities at Different Depths

    By M Zoorabadi, B Hebblewhite, S Saydam, W Timms

    Based on the cubic law, the hydraulic aperture of rock discontinuities has the most significant effect on the hydraulic conductivity of jointed rocks. The hydraulic aperture of rock discontinuities is

    Nov 5, 2014

  • AUSIMM
    Development of a Turbulent Flotation Model

    By R-H Yoon

    A turbulent flotation model has been developed by considering the subprocesses of collision, attachment, detachment, and froth recovery. AbrahamsonÆs model (1975) of infinite Stokes number is used to

    Jan 1, 2005

  • AUSIMM
    Optimum Dig Lines for Open Pit Grade Control

    By I Treloar, T Elenbaas, E Isaaks

    Critical reviews of grade control generally focus on blasthole sampling and the estimation of ore control block model (OCM) grades, with little or no attention given to dig-line design. For example, t

    Aug 18, 2014

  • AUSIMM
    Sulfidisation of Ilmenite Concentrates Contaminated with Chrome Spinels – A New Approach to Impurity Separation

    By M I. Pownceby

    High temperature roasting studies on chrome-spinel contaminated ilmenite concentrates showed that sulfur, introduced through a sulfidising roast treatment, selectively reacted with the chromium in the

    Oct 5, 2011

  • AUSIMM
    Hudson Bay Mining and Smelting ù æA Turnaround SuccessÆ

    By D W. Nisbet

    Today Hudson Bay Mining and SmeltingÆs 777 Project is the largest mining construction project under way in Canada. The project comprises six components: construction of the new 777 zinc-copper mine; c

    Jan 1, 2000

  • AUSIMM
    Drill Steel Sharpening Practice at Lake View and Star Gold Mine

    The drill steel' sharpening shop, which stands adjacent to the Chaffers shaft, is built to the dimensions of 110 ft. 9 in. by 58 ft. wide, and is air conditioned in order to maintain reasonable w

    Jan 1, 1941

  • AUSIMM
    Alteration Associated with Volcanic-Hosted Massive Sulfide Deposits, and its Exploration Significance

    By W Herrmann, R R. Large

    Volcanic-hosted massive sulfide (VHMS) deposits in ancient, submarine volcanic belts of Australia include mound, lens and sheet-style Zn-rich polymetallic deposits, massive and disseminated pyritic Cu

    Jan 1, 2002

  • AUSIMM
    Contract Commissioning and Operation of Western Areas’ Cosmic Boy Concentrator

    By C Dick

    Over the past three decades, mining operations have seen a significant increase in the use of contractors for mining, camp management and catering, recruitment, maintenance, power management, and comm

    Aug 8, 2011

  • AUSIMM
    Stratigraphy of the Thomson Orogen – New Insights from Mount McLaren, North-east Australia

    By C Verdel, M Lee, A Oorloff, K Welsh

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Thomson Orogen is a large but poorly understood element of Queensland geology. Extensiv

    Mar 18, 2015

  • AUSIMM
    The Merlin Molybdenum Rhenium Deposit, Mt Isa Inlier – Two Years from Discovery to Development

    By G Phillips

    The Merlin project is situated 130 km south of Cloncurry in North West Queensland, Australia. It is located within the Pre-Cambrian Mt Isa Inlier and is grouped within the Eastern Fold Belt. The host

    Aug 22, 2011

  • AUSIMM
    Total Deposit Knowledge – Geology, Underground Mass Mining and the Future – A Mining Engineer’s Perspective

    By G Chitombo

    Mass mining methods have become the mining industry’s preferred way of extracting most of the world’s most important metal and mineral commodities. Given the rapidly increasing global demand for commo

    Aug 22, 2011