Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Thermodynamics of Non-Cyanide Gold Solvents

    Thermodynamics of Non-Cyanide Gold Solvents The present status of the raw material base in the gold industry requires specific ways to recover gold and silver from ores. Most gold is closely associat

    Sep 13, 2010

  • AUSIMM
    The Use of Risk Analysis in the Selection of a Mining Method

    It is very rare in the underground hard rock environment to find a deposit that is ideally suited to a specific mining method. Usually the irregular shape of the orebody will allow the deposit to be e

    Jan 1, 1998

  • AUSIMM
    Current Mining Practice At Cleveland Mine Of Abminco N. L.

    The Cleveland Mine has an annual ore production of 400,000 tonnes at a grade of 0.79 per cent tin and 0.30 per cent copper. It is achieved by an open stoping method, mechanised overhead sub-level b

    Jan 1, 1977

  • AUSIMM
    Managements' Changing Emphasis on Health and Safety in the 1990s

    The 1990s present many challenges, not the least of which is in the area of health and safety. Integrating of safety and health into the management process to suit the overall needs of a company will

    Jan 1, 1993

  • AUSIMM
    Comparison of Ore Dressing Methods Used by Ilmenite Producers in Western Australia

    Ilmenite production in Western Australia commenced in 1956. There are now five producers, all in the Bunbury-Capel district, and current total production capacity is about 450,000 t.p.a.The deposits o

    Jan 1, 1965

  • AUSIMM
    Peer Review at Golden Cross Mine, Coromandel

    By D Crequer

    A Peer Review Panel for the Golden Cross Mine in the upperWaitekauri Valley, Coromandel was initiated in December 1989, before mining, as a requirement of the conditions of the Mining Licence and Wate

    Jan 1, 1998

  • AUSIMM
    The Nature and Utilization of Iron Blast Furnace Slags

    The term slag has been used to define a wide variety of material including mine spoil and slag produced at steel plants. The present paper is concerned only with the non-metallic alumino-silicates dev

    Jan 1, 1964

  • AUSIMM
    Accelerated Cyanidation Assays Using LeachWELLÖ 60X - The Bannockburn Experience

    By Revy T

    A testwork program aimed to improve the assaying of underground face samples established that for an Accelerated Cyanidation Extraction using the LeachWELLTM 60X catalyst, followed by an Aqua Regia

    Jan 1, 1994

  • AUSIMM
    New reagents for beneficiation of lithium ores

    By T Walsh, S R. Mudnuru

    The development of lithium-ion batteries, coupled with the global trend towards electrification of transportation, has led to a dramatic increase in the demand for lithium. The production of lithium f

    Aug 24, 2022

  • AUSIMM
    The AusIMM's Place in the Australasian Mineral Industry

    The Australasian Institute of Mining and Metallurgy (AusIMM) is a professional society for all those associated with the activities of the mineral industry. Differences of opinion exist within the mem

    Jan 1, 1997

  • AUSIMM
    Material handling testing and control system requirements for dry stack tailings

    By R Stefansen, T Wisdom, A Nicholson, K Rahal

    The challenges of increasingly scarce water resources and the risk of dam failures has seen the mining industry turn to sustainable tailings management solutions such as dewatering and dry stacking. F

    Jul 23, 2018

  • AUSIMM
    Developing Minerals Industry Leaders by Encouraging Metallurgical Excellence

    By N Bianco, D Drinkwater

    The professional skills shortage is intensifying, and commentators are predicting a shortfall in supply of qualified professionals for the mining industry, ranging from thousands to tens-of-thousands

    Oct 29, 2012

  • AUSIMM
    Brief Outline of Mount Isa Copper Smelter

    The equipment and general smelter layout for the Mount Isa Copper Smelter were designed by engineers associated with the American Smelting and Refining Company and by Mount Isa staff engineers. The fi

    Jan 1, 1953

  • AUSIMM
    Practical and Strategic Technology Choices for Advanced Mining

    By I Gipps

    The mining industry has come through a period of major change in community expectations regarding safety and environmental impact and these changes can be expected to continue in the future. These cha

    Jan 1, 2003

  • AUSIMM
    Quantitative Clay Mineralogy for a Calcrete-Hosted Uranium Deposit – Innovative Application of Existing Technology on an Unprecedented Scale

    By C Lower

    An unprecedented, quantitative, deposit-scale understanding of major clay mineral distribution throughout the Yeelirrie uranium deposit has been achieved by adapting the existing HyLogger™/HyChips™ an

    Sep 5, 2011

  • AUSIMM
    The 250 million ton per annum spatial digital twin

    By M Pomery

    BHP’s Western Australian Iron Ore Operations (WAIO) move approximately 250 million tons of ore per annum. The magnitude of the constant changes to the terrain models along with the diverse output and

    Sep 18, 2023

  • AUSIMM
    Optimisation of Operating Parameters for Cyanidation of Sulfide-Bearing Gold Flotation Tailings in order to Prevent the Impact of Cyanicides

    By B Levasseur, C Olsen, E Ghasemian Langeroudi, F Larachi, F Safizadeh, C Gagnon

    Gold recovery by the cyanidation process is often accompanied by the leaching of other species. This leads to the depletion of the level of free cyanide and oxygen available for gold cyanidation. The

    Sep 26, 2013

  • AUSIMM
    Sources of Alluvial Gold, Nokomai Catchment, Northern Southland

    By P Wopereis

    The Nokomai valley is located within the pumpellyite/actinolite facies of the Otago Schist, a regional scale metamorphic belt in Southern New Zealand. The Otago Schist is dominated by psammitic and pe

    Jan 1, 1996

  • AUSIMM
    Monitoring Equipment Productivity Improvements in Coal Mines

    By Sengstock G. W, Spathis A. T

    Benchmarks of mine equipment involved in the excavation process of coal mines would suggest that such equipment is not always operating at an optimum level. Dragline operations and truck/shovel oper

    Jan 1, 1995

  • AUSIMM
    Through Seam Blasting – Leighton Wahana Experience

    By S Agdaca

    Leightons is the sole contractor at the Wahana Coal Mine Project (part of the Bayan Group), a multi-seam thermal deposit consisting of 13 coal seams with thicknesses ranging from 20 cm to 500&#16

    Nov 8, 2011