Bioleaching of Nickel-Cobalt Oxide OresBy P Tzeferis
An exploratory laboratory work was carried out on microbial leaching of poor non-sulphide nickel ores, not amenable to conventional mineral processing operations. The results have shown that domestic
Jan 1, 1997
-
Cleaner Production in AlcoaBy S Sandover, D Glenister
Alcoa World Alumina Australia is committed to sustainability principles as a basis of business success into the future. In March 2001, Alcoa Inc chairman Alain Belda announced a set of far-reaching en
Jan 1, 2002
-
Further investigations into the relationship between the non-ideal behaviour of a particle-collector aggregate as determined using partial molar excess Gibbs energy and its hydrophobicityBy K C. Corin, C T. O’Connor
In recent years it has been shown that the concept of using partial molar excess Gibbs energy (G̅ex) to explain the behaviour of collectors in the recovery of minerals can be usefully applied to expla
Aug 24, 2022
-
Technical Note - Rapid Production of High Quality Polished Sections for Automated Image Analysis of MineralsBy Wittenberg J. C, Reid A. F
A method is described for the rapid and effective production of polished section mounts of ore and mineral particulates to the standards required for automated image analysis. This requires mounting w
Jan 1, 1984
-
A New Source of Gallium - Geothermal MudsThe demand for gallium has increased significantly over the last few decades due to the expanding use of Ga compounds in the electronics industry. Because it is widely dispersed and rarely found natur
Jan 1, 1994
-
Didipio Flash Flotation and Gravity Recovery CircuitBy M McGrory, A Rodolfo, J Paredes, L E. Manguba, K A Villaspir, G Webb, R Setiagani, H Cardenas
"OceanaGold’s Didipio operation has been in operation for three years. Integral to the flow sheet design is a flash flotation circuit treating a portion of cyclone underflow, consisting of an Outotec
Oct 10, 2016
-
An Integrated Optimisation Study of the Barrick Osborne Concentrator: Part A - Crushing and GrindingBy M Korte, J McMaster, C Brent
The Barrick Osborne concentrator has gone through a number of upgrades since commissioning and has increased production from the original 119 t/h design capacity to a milling throughput of 265 t/h in
Jan 1, 2009
-
Impact testing of raise bore protection meshBy M Doran
The Olympic Dam mine utilises 1.1 m to 1.4 m diameter raise bores for generating the initial slot void for most production stopes. Slot raise bores generally span two development levels ranging from 3
Mar 29, 2023
-
Characterising the Reasons for the Difference in Performance of Two Ore Blends in Early Processing at OZáMinerals Prominent Hill OperationBy D J. Bradshaw, E M. Wightman, C L. Evans, B Triffett
During the commissioning phase of Prominent Hill, periods of reduced recovery were experienced with higher-grade ore blends. This was unexpected and as part of the process to identify the cause, surve
Oct 29, 2012
-
Environmental Management of a Traditional Coal Mining SiteBy R Byrnes, P Hensley
The outstanding environmental management initiatives undertaken by Novacoal at its Western Main Site near Lithgow in
Jan 1, 1995
-
Reducing the Cost of Tunnel Design in AustraliaBy B Rouvray, R Bertuzzi
The development of a design-and-construct tunnelling project in Australia from its concept to its construction requires designs to be prepared and reviewed at several distinct stages prior to document
Sep 17, 2014
-
Processing/Development/Technology AdvancesDeclining metal prices over the last few years have reduced the number of new metallurgical plants being built and limited opportunities for introducing new processes. However, technological advances
Jan 1, 2000
-
Determining ventilation system model inputs from field test work in the oil shale mineBy S Sabanov
Determining ventilation system model inputs from the field test work has been produced in the working oil shale mine which has been in production since the early 1970s. At this mine room-and-pillar wi
Aug 28, 2017
-
Late Cainozoic Uplift of the Ediacara Range, South AustraliaDrilling has disclosed a sequence of Cainozoic sediments immediately to the west of the Ediacara mineral field containing little or no dolomitic debris in the lower and middle sections, but with grave
Jan 1, 1972
-
Property Rights and Mineral Law ReformIn understanding the consequence of existing law, and the likely implications of its reform, it is necessary to comprehend the logic of the situation that the law provides individual decision makers a
Jan 1, 1988
-
Design and Construction of the Yarra River CrossingBy R Blair
The Domain and Burnley Tunnels, which are major features of the Melbourne City Link Project, are MelbourneÆs first road tunnels. They are 1.6 km and 3.5 km in length respectively and are being constru
Jan 1, 1999
-
The Python - An Underground Processing Plant for Narrow Vein MiningBy N J. Grigg
Gekko Systems has developed an underground pre-concentration plant (Python) to reduce mine operating costs. Many ores liberate favourably using either high pressure grinding rolls (HPGR) or vertical
Jan 1, 2008
-
Benchmarking and cross validation of the multivariate conditional simulation model of the Olympic Dam depositBy D Clarke, I Minniakhmetov
The Olympic Dam deposit is truly a world-class IOCG-Ag deposit, the world’s fourth largest deposit of copper and the world’s largest known single uranium deposit. Traditional and non-traditional metho
May 24, 2023
-
Paper No. 182. Modern Methods in Mine Surveying.THE art of mine surveying has made very great progress in recent years, and is still advancing, perhaps faster than any other branch of surveying. The scope of the mine surveyor's duties has grea
Jan 1, 1909
-
Coal Drying of Greenvale Nickel Lateritic OreNickel laterite approximately 40% of the remainder caning deposits. ores are the source of the world's nickel with from sulphide ore Although laterite ores are near the surface and cheap to
Jan 1, 1987