Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Design Procedure and Results from a Field Test of Soil Freezing as Stabilisation of Bottom Slice FillBy P Andersson, P Marklund
Evaluation of different techniques for bottom fill stabilisation showed that frozen fill was the most economical method. In order to test the method a full-scale field test was performed in the Rehnst
Jan 1, 1998
-
The Barmac Autogenous Crushing Mill - The New Development in Autogenous Crushing and MillingThe Barmac autogenous crushing mill is one of the most successful new comminution technologies to become available to the mining and industrial minerals industries in this decade. The Barmac au
Jan 1, 1990
-
Triassic to Early Cretaceous Tectonic Evolution of New Zealand Terranes: A Summary of Recent Data and an Integrated ModelRecent data contributions to New Zealand Mesozoic terrane geology confirm the consensus interpretation thatNew Zealand grew by the progressive addition of material by plutonic and accretionary process
Jan 1, 1995
-
Tube Making in AustraliaThe title of this paper suggests rather a comprehensive survey of the industry, but since it is not possible to do justice to this in a short paper, and, as the bulk of the Australian trade consists o
Jan 1, 1935
-
Lessons from the S11D Truckless Mining ProjectBy T Atchison
The Vale Ferro Carajßs S11D project in northern Brazil is based on the movement of unprecedented volumes of waste and ore for mobile in-pit crushing and conveying or ætrucklessÆ systems. In peak years
Aug 12, 2013
-
Mining Methods at Mount Morgan Limited, Mount Morgan, QueenslandBy Patterson B. G
The small party of mining men who formed the original Mount Morgan Syndicate in 1882, commenced operations on the top of the mountain with what were practically nothing more than small hillside quarri
Jan 1, 1939
-
Mechanised Tunnelling Technologies for Mining ApplicationsThe increasing global demand for rough materials forces almost every mine to look at the mechanisation in their processes. This will not onlyimprove performance but with safety issues becoming more an
Jan 1, 2008
-
The Research on Refined Gold Bullions Surface UpgradingThe Research on Refined Gold Bullions Surface Upgrading
Sep 13, 2010
-
Recovery of Sulphur from Smelter Gases at KalgoorlieSome design and feasibility studies have been made into possible methods of economic recovery of sulphur from smelter gases emitted at Western Mining Corporation's Nickel smelter at KalgoorIie in
Jan 1, 1983
-
Geochemical Prospecting of the Bureau of Mineral ResourcesGeochemical projects in progress or recently completed in the Bureau of Mineral Resources, Geology, and Geophysics (BMR) cover a wide range of topics and include research projects, regional studies, a
Jan 1, 1970
-
Some New Ideas on the Age and Origin of the Etheridge Goldfield, Queensland, and their Exploration Implications (495c9435-8309-4f05-8133-4703aafde3c7)Close spatial relationships between the deposits of the Etheridge Goldfield (23 000 kg of bullion) and various regional geological and geophysical features suggest that genesis of the ore deposits was
Jan 1, 1981
-
Upgrading of a Flow Sheet Selection PC Algorithm for Refractory Concentrates TreatmentUpgrading of a Flow Sheet Selection PC Algorithm for Refractory Concentrates Treatment
Sep 13, 2010
-
Energy Efficiency Assessments in Design – Seminal Decisions and Effective ProcessesBy M Allen
Energetics has been in the business of climate change for more than twenty years. This experience has only served to cement the understanding that decisions taken during design define the environmenta
Aug 8, 2011
-
The Direct and Indirect Effects of the Reagent Suite on Froth Stability in Laboratory Scale Batch Flotation TestsThe Direct and Indirect Effects of the Reagent Suite on Froth Stability in Laboratory Scale Batch Flotation Tests
Sep 13, 2010
-
An Assessment of Radioactivity Hazards at a Proposed Heavy Mineral Sand Mining SiteBy N E. Whitehead
An application to mine an ilmenite-rich sand deposit in Westland led to public concern about potential radioactive hazards should the ore be further processed to recover zircon or monazite. A review r
Jan 1, 1993
-
The Challenges of SuccessMining in the twenty-first century brings with it a new range of challenges, some unfamiliar to our industry. Skilled staff recruitment and retention is a significant issue. Equipment supply lead time
Jan 1, 2007
-
Project Development and Construction ManagementSuccessfully managing project development and construction has often been a challenge in the mining industry. This is reflected in the number of projects that have taken longer to build, exceeded thei
Jan 1, 2006
-
In-Pit Crushing and Conveying System and Dexin Pit Copper Haulage Optimisation for Ore TransportThe output of Dexin Pit Copper is up to 33 million tonnes a year and the final depth is more than 500 m. As a cost reduction measure, the in-pit crushing and conveying system has was introduced to del
Jan 1, 2003
-
Recent Consenting of Mining and Quarry Developments Under the Resource Management Act: Case ExamplesIncreasing attention is being focussed worldwide on the strategic environmental assessment of mining projects, including consideration of cumulative environmental effects. In New Zealand there is now
Jan 1, 2005
-
Coal Mining MethodsThe selection of an appropriate mining method should take into account the geometry of the deposit and its physical properties. Other factors which assist in the determination are the requirements
Jan 1, 1997