Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Oxygenation System Upgrades and Leach Plant Performance Improvements at Morila Gold Mine - 2009 to 2012

    By D M. Verster, P L. Gillot, A Kone

    Randgold ResourcesÆ MorilaÆs gold leach plant is subjected to uncommon æoxygen stressesÆ. Feed ores exhibit very high oxygen demands, primarily caused by iron sulfides. In addition, ore oxygen demand

    Sep 26, 2013

  • AUSIMM
    The Geotechnical Input into the Mining Process at George Fisher South Mine

    Geotechnical input is interwoven into the mining process at George Fisher South Mine from the planning and design of working areas to the closure of worked out areas and maintenance of life of mine an

    Nov 25, 2010

  • AUSIMM
    Pilot Tests for Heavy Metals Removal in Mine Water

    By M Vendrup, T C. Christensen, C Dube

    The adsorptive and granulate forming MetClean™ process has been used at many locations in Northern Sweden, Norway, Denmark, France, Spain, Mongolia, Japan and Australia. It has been pilot tested and u

    Sep 7, 2015

  • AUSIMM
    Technical Challenges in the Flotation of Molybdenite from Porphyry Copper Ores

    Technical Challenges in the Flotation of Molybdenite from Porphyry Copper Ores

    Sep 13, 2010

  • AUSIMM
    Online elemental and mineral measurement of slurries in iron ore beneficiation

    By O Haavisto, N Khajehzadeh, L Koresaar

    Online analysis of metal content can be used to optimise the grade and recovery of a flotation circuit. Compared to conventional laboratory analyses, the benefit of an online analyser is the speed of

    Jul 24, 2017

  • AUSIMM
    Notes on Sampling

    This paper is intended partly as a summary of the conclusions that have been arrived at by various authorities on this matter, and also with a view to initiate some discussion on the subject, especial

    Jan 1, 1904

  • AUSIMM
    Notes on the Phillips River Gold and Copper Field

    THE Phillips River gold and 'copper field is situated on the south coast of Western Australia, about 200 miles east of Albany, 180 miles west of Esperance, and: 250 miles south of Southern Cross,

    Jan 1, 1917

  • AUSIMM
    Comparison of Rhyolite-Hosted Gold Deposits in the Coromandel (New Zealand), and Nevada (USA) Epithermal Gold Provinces

    Rhyolitic rocks are volumetrically significant in the eastern part of the Coromandel gold province, yet deposits hosted by rhyolite (Kapowai, Broken Hills, Neavesville, Wharekirauponga and Waihi Beach

    Jan 1, 1996

  • AUSIMM
    Chemical Additives As An Aid Reclamation Programmes

    Erosion of unprotected batters, spoil banks, slopes, and stockpiled material creates a multitude of environmental problems. Winds blowing across these denuded surfaces can generate dust clouds cap

    Jan 1, 1976

  • AUSIMM
    The Structural Evolution of the Hyde-Macraes Shear Zone at Round Hill, Otago, New Zealand

    The Hyde Macraes Shear Zone (HMSZ) is an extensive low angle semibrittle mineralised structure in the Otago Schist Belt, New Zealand. The shear zone is located on the lower limb of a late metamorphic

    Jan 1, 1992

  • AUSIMM
    Fissure Vein Structures and Brecciation in the Upper Levels of the Broken Hills Epithermal Au/Ag Deposit, Hauraki Goldfield, New Zealand

    By J L. Mauk

     Broken Hills is an adularia-sericite epithermal Au-Ag deposit, hosted in flow-banded rhyolites and overlying rhyolitic pyroclastic rocks in the eastern Hauraki Goldfield. The 7.1 Ma deposit was

    Jan 1, 2005

  • AUSIMM
    The Tectonics, Geology and Gold-copper Metallogeny of New Guinea

    By S L. Garwin

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Since the Eocene, New Guinea tectonics have been driven largely by the south-westerly-direc

    Mar 18, 2015

  • AUSIMM
    Slag-metal interfacial reactions in pyrometallurgical processing of industrial wastes for recovery of valuable metals

    By J H. Park, R R. Kim, H S. Park, H J. Kim

    This study focuses on the recovery of valuable metals, specifically silver (Ag) and palladium (Pd), from copper-containing sludge (with copper content less than 20 per cent) generated during PCB proce

    Jun 19, 2024

  • AUSIMM
    An Empirical Review of Extraction Bolting Design in Deep Ore Zone Mine PT Freeport Indonesia

    By F Sinaga, E Widijanto

    PT Freeport IndonesiaÆs Deep Ore Zone (DOZ) mine is the new underground block caving mine within the East Ertsberg Skarn System (EESS) which started production in mid-2000. The DOZ will produce 25 000

    Jan 1, 2002

  • AUSIMM
    Prediction of Burden at the Sungun Copper Mine by Artificial Neural Network

    By H Khoshrou, A Siamaki

    Blast designs can have productive and non-productive impacts on downstream stages, mine productivity and operating costs. On the other hand, ground vibration, fragmentation, and back break caused by b

    Sep 26, 2011

  • AUSIMM
    Selectively targeting hydrophobic gangue minerals at the Mount Isa Mines Copper Concentrator

    By M L. Muller, A R. O’Donnell

    The Mount Isa Mines (MIM) Copper Concentrator has an extensive history of reagent trials, with different reagents coming in and out of favour over the years. The research and use of carbon depressants

    Aug 29, 2018

  • AUSIMM
    Improving Pelletisation of Pyrite Cinder by High Pressure Roller Grinding

    Improving Pelletisation of Pyrite Cinder by High Pressure Roller Grinding As an important secondary resource for ironmaking, pyrite cinder is characterised by coarse particle size, low specific surfa

    Sep 13, 2010

  • AUSIMM
    Stabilisation of Pit Slopes, Waikaka Alluvial Gold Mine

    Wet mining of auriferous gravels at L & MÆs Waikaka operation in Southland creates spoil dumps derived from stripping of a clay rich overburden, tailings from past dredging and the processing of aurif

    Jan 1, 2002

  • AUSIMM
    An automatic sampling methodology to determine contractual particle size distribution in rapid train load out stations

    By S C. Labram, A Stabile

    "Modern train load out stations are becoming faster and have the ability to load a 100 wagon train in less than three hours. At 70 metric tonnes per wagon, that is an average fill rate of 2333 t/h and

    May 9, 2017

  • AUSIMM
    Removal of Arsenic in Enargite from Copper Ores by Flotation and Leaching in NaHS Media

    Removal of Arsenic in Enargite from Copper Ores by Flotation and Leaching in NaHS Media

    Sep 13, 2010