Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Grinding ù The Primary Conditioner

    By P Steinier

    Most operations, when considering their comminution circuit, are primarily concerned with achieving the desired particle size distribution to obtain adequate liberation for the separation process, at

    Jan 1, 2004

  • AUSIMM
    Pressure Leaching of Thackaringa Cobalt-bearing Pyrite

    A massive cobalt-containing pyrite orebody occurs in banded albite-quartz-biotite rocks at Thackaringa, some 30 km SW of Broken Hill. Because of the world-wide shortage of cobalt during the late 1970s

    Jan 1, 1983

  • AUSIMM
    Investigations and Improvements to Ground Control Systems Used at Xstrata Copper ù Mount Isa Copper Operations

    By B Andrew, L Krois

    Ground control systems, including ground control management, play an integral role in the effective and efficient extraction of copper ore at the Xstrata Copper û Mount Isa Copper Operations (MICO). R

    Jan 1, 2005

  • AUSIMM
    Is Australia Producing Sufficient Numbers of Earth Science Graduates?

    By Robinson KJ

    There has been much debate in recent years regarding the number of Geology (Earth Science) graduates produced in Australia. The key variable has commonly been assumed to be the placement of graduat

    Jan 1, 1989

  • AUSIMM
    Atomic Absorption Analysis for Nickel Using a Resonance Detector

    Resonance re-emission from nickel vapour affords a convenient method for isolating the resonance lines at 3415A, 3515A, and 3524A. The vapour is generated by cathodic sputtering and is illuminated by

    Jan 1, 1968

  • AUSIMM
    Oxygen in Matte and Oxidic Nickel in Slag (761da7cb-f038-4aa0-94ae-a2b08821817f)

    Based on the examination of thirty sets of contiguous matte and slag samples taken from industrial nickel smelters a relationship is predicted between oxidic nickel in slag, oxygen in matte and the Ni

    Jan 1, 1980

  • AUSIMM
    Ultimate Pit Limit of Iron Ore Mines using Maximum Flow Algorithms

    A major problem in open pit mine planning is to determine the optimum pit limit of the mine. The optimum pit limit is the one with maximum discounted net profit and satisfies technical conditions. A n

    Dec 6, 2010

  • AUSIMM
    Tailings Management at Macraes Gold Mine

    An important consideration in any mining operation is waste disposal management. Tailings management at Macraes gold mine allows for the disposal of tailings into fully engineered embankment dams and

    Jan 1, 1992

  • AUSIMM
    Field-Based Alteration Mapping Using the PIMA

    By N Merry, T Cocks

    The mineral exploration industry is increasingly aware of the importance of the relationship between mineralogical data and geochemical assay results. However, until recently, the cost and time constr

    Jan 1, 1995

  • AUSIMM
    Crushing and Screening Operations at Mount Tom Price

    Mine ore, reduced to minus 71/2 in. by primary crushers, is stockpiled. Size reduction of the reclaimed material by secondary and tertiary crushers is achieved in a closed circuit crushing and screeni

    Jan 1, 1970

  • AUSIMM
    The Drainage of the New Chum Line of Reef

    One of the chief drawbacks to Bendigo mining always has been the difficulty of draining the mines in an equitable manner, so that each company or mine owner bears the properly share. The trouble seems

    Jan 1, 1902

  • AUSIMM
    Study on a Novel Polymer/Bentonite Compound Adsorbent for Removal of Cu(II) from Aqueous Solution

    Study on a Novel Polymer/Bentonite Compound Adsorbent for Removal of Cu(II) from Aqueous Solution

    Sep 13, 2010

  • AUSIMM
    Flotation Circuit Analysis at WMC Ltd Olympic Dam Operation

    By P Wigley

    New methods of analysing and modelling flotation circuits have been developed as part of the AMIRA P9 mineral processing research project. A study using these techniques was conducted on the Olympic D

    Jan 1, 2003

  • AUSIMM
    Rail Haulage Transportation

    On a worldwide basis trackbound transportation is on the decline. As mining operations progress from open cast operations to underground operations, most utilise mechanised equipment. However, in Sout

    Jan 1, 2005

  • AUSIMM
    The Heavy Media Separation Coal Washing Plant at Lidsdale, New South Wales

    The Heavy Media Separation plant operated at Lidsdale siding, eight miles from Lithgow, by the N.S.W. Mining Co. is a product of the Western Machinery Company, of D.S.A.This mill, designed to use fine

    Jan 1, 1954

  • AUSIMM
    Coal Ash Disposal at Rotowaro Minesite: A Reference Condition Approach to Setting Boron Criteria and Assessing Environmental Effects

    By S Speed, N Corlis, A Goldstone, G N. Browne, M Fitzpatrick

    In 2005, Solid Energy New Zealand Limited obtained non-notified consent for the disposal of 1Mt of coal ash at the Rotowaro minesite, forming part of a coal supply agreement with the Huntly Power Stat

    Jan 1, 2006

  • AUSIMM
    Improving Pentlandite Selectivity Over Pyrrhotite Using Reagents

    Improving Pentlandite Selectivity Over Pyrrhotite Using Reagents

    Sep 13, 2010

  • AUSIMM
    Outlook for Oil Demand in the Pacific Basin Region

    Large GDP increases in the Pacific Rim countries have been accompanied by similarly large increases in demand for oil products. In the case of residual fuels, this demand has been tempered by the subs

    Jan 1, 1990

  • AUSIMM
    Indicator and Quartz Reefs

    During the past Two years in reef gold mining, "indicators" have received great attention at the hands at the Victorian gold seekers. Many years ago, what was caned the" indicator lode,

  • AUSIMM
    The Thames-Hauraki Pumping Plant at Thames, New Zealand

    THIS paper proposes to give a general description of the pumping and other machinery in use at the Thames Hauraki Pumping Station, situated on the Thames goldfields of the North Island, New Zealand. A

    Jan 1, 1912