Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Adjusted Real Option Valuation to Maximise Mining Project Value - A Case Study Using Century Mine

    By M Nehring, E Topal

    Nowadays mining projects are seeking new versions of evaluation that are based on the flexibility in the project. Real option valuation (ROV) is one of the modern evaluation methods that provides a to

    Jan 1, 2009

  • AUSIMM
    Developing a æNew and InnovativeÆ Process Flow Sheet - Traps for all Players of all Ages

    By J Canterford

    There is an apparent push to develop and commercialise "new and innovative" process flow sheets. A not-too-difficult reality check clearly demonstrates that the success rate of this push is not partic

    Jul 15, 2013

  • AUSIMM
    Developing Assessment Methods and Remediation Protocols for New Zealand Sites Impacted by Acid Mine Drainage

    By A Black, A de Jo, J Cavanagh, J Harding

    Acidic and metal-rich waters have been discharging from Sullivan Mine, West Coast, New Zealand since the closure of the mine during the early- 1990s. This has resulted in a decrease in pH from a backg

    Jan 1, 2003

  • AUSIMM
    The Influence of Energy Policy and Security Energy Supply Policy of Indonesia to Asia-Pacific Coal Distribution in 2025

    By A P. Wibowo

    Indonesia holds a significant role in the utilisation of coal resources in the world. Although the number of Indonesian coal resources and reserves do not fall into the world’s top ten, according to 2

    Nov 22, 2011

  • AUSIMM
    Shifting the comminution workload from the primary ball mill to TowerMill circuit

    By H Ishikawa, R Halomoan, S Palaniandy

    The Karara iron ore project is a magnetite operation consist of open pit mining and concentrator to produce high-grade magnetite concentrate. The concentrator has adopted three stages of comminution,

    Aug 29, 2018

  • AUSIMM
    Geology, Alteration and Mineralisation of the Tampakan Copper Deposit

    By A Madera, R Watt

    The Tampakan deposit is a strongly telescoped high-sulphidation-epithermal/ porphyry deposit pair which is hosted by a sequence of probable Pliocene age subaerial andesite flows. These host units lie

    Jan 1, 1999

  • AUSIMM
    Grade control and deleterious materials in polymetallic deposits

    By R J. Goldie

    The Monty Copper Gold Deposit is an ultra-high grade mine in Sandfire Resource’s Doolgunna region which was completely drilled out and developed within two years of commencing mine development. During

    Mar 22, 2022

  • AUSIMM
    The Resource Management Act 1991: Its Implementation in Otago

    The Resource Management Act has been in force now for approximately ten months. This Act, and the Crown Minerals Act which accompanied it, have substantially changed the manner by which mining operati

    Jan 1, 1992

  • AUSIMM
    Economics of Mine Planning and Equipment Selection

    This paper examines some of the fundamental economics of mining - in particular, for optimisation studies, for production rate determination and for reserve estimates.It includes introductory discussi

    Dec 6, 2010

  • AUSIMM
    Development of the Maui Gas Field

    The offshore Maui gas/condensate field was discovered by Shell BP and Todd on Services Limited in 1969. Subsequent appraisal drilling and negotiatio

    Jan 1, 1994

  • AUSIMM
    Evaluating the Effects of Non-coaxial Charges for Contour Blasting

    By J Seccatore, F Golin, E Munaretti, M Cardu, J C. Koppe, J Bettencourt

    Contour blasting is commonly performed by employing linear charges decoupled from the boreholes. This method is common in surface and underground excavations, either for civil or mining purposes. To a

    Aug 24, 2015

  • AUSIMM
    Scenario Thinking - A Powerful Tool for Strategic Planning and Evaluation of Mining Projects and Operations

    By G Nicholas, S Coward, J Vann, R Wolff, S Jackson, S Moayer, A Bye

    "A new approach to mineral project evaluation is described called Scenario-Based Project Evaluation (SBPE). SBPE incorporates well established æscenario planningÆ and æscenario thinkingÆ approaches, w

    May 24, 2012

  • AUSIMM
    Open Pit Production Scheduling Optimisation - Why the Mining Industry Needs a New Phase Design Approach

    The long-term production schedule of open pit mines that maximises the net present value (NPV) of a given project relies on the proper design of phases (pushbacks) within the ultimate pit limits. Ther

    Dec 6, 2010

  • AUSIMM
    Joint Ventures - Taxation Risks and Advantages

    Both here and in Australia, the unique commercial and tax features of joint venture are finding favour in forestry, fishing, technology and infrastructure projects. For New Zealand mining companies, j

    Jan 1, 2005

  • AUSIMM
    Reverse Sensitivity - A Two-Way Street, Not a Dead End

    Reverse sensitivity is a critical issue for all extractive activities. Extractive industries can only establish in the location of the particular resource sought to be extracted. Avoiding a location n

    Jan 1, 2006

  • AUSIMM
    The influence of charge density and solution ionic strength on polymer flocculant performance

    By JOHN G. RAYNER

    An examination was made of the filtration characteristics of a haematite slurry using a range of polyacrylamide based flocculants in solutions containing up to 3 per cent sodium chloride. The polymers

    Jan 1, 1987

  • AUSIMM
    A National Code for Reporting Coal Resources and Reserves

    In November 1986 the Australian Minerals and Energy Council (AMEC) endorsed an "Australian Code for Reporting Identified Coal Resources and Reserves" for use by the Federal and all State Governments

    Jan 1, 1987

  • AUSIMM
    Lithospheric Footprints of Giant Orogenic Gold Systems

    By R J. Goldfarb, A B. Christie, D I. Groves

    Small orogenic gold deposits have the same deposit-scale geological and geochemical features as those that characterise giant orogenic gold systems (>16 Moz Au). Therefore, a broader-scale approach

    Jan 1, 2005

  • AUSIMM
    Geology, Geochemistry and Exploration Implications of Hydrothermal Alteration Associated with Epithermal Au-Ag Deposits

    By AMIRA P588 Research Team

    This contribution summarises new knowledge and data, obtained during a three year ARCAMIRA funded research project, on the mineralogical and geochemical characteristics of hydrothermal alteration asso

    Jan 1, 2005

  • AUSIMM
    Update on Precious Metals in Deep Geothermal Waters of the Taupo Volcanic Zone (TVZ)

    By K L. Brown

    Sampling and analyses of deep waters from Wairakei and Rotokawa geothermal systems indicate a wide range of precious metal concentrations (<0.1 to 23 ppb Au; 6 to 2400 ppb Ag), suggesting that east

    Jan 1, 2006