Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Review of Prediction Methods for Ground-Borne Noise Due to Tunnel Construction Activities

    By D Davis

    The prediction of ground-borne noise levels from tunnel construction activities requires knowledge of the input vibration forces from the vibration source(s) into the cutting face, knowledge of the vi

    Mar 8, 2011

  • AUSIMM
    Empirical mill throughput modelling and linear programming for blend optimisation at the Phu Kham copper-gold operation, Laos

    By B Saunders, J Carpenter

    PanAust’s Phu Kham copper-gold operation (Phu Kham) in Laos is currently limited by throughput in the Semi Autogenous Grinding (SAG) mill. The ability to accurately predict SAG mill throughput (throug

    Sep 20, 2017

  • AUSIMM
    KEYNOTE: Using Metallurgical Data to Drive Continuous Improvement

    By R Dunne

    "Continuous improvement on metallurgical treatment plants is possible only when good data and analysis of the data are available. Good data implies appropriate and accurate mass measurement coupled wi

    Oct 10, 2016

  • AUSIMM
    Total Integrated System Simulation for Master Planning of the Dalrymple Bay Coal Chain

    By B Olsson, R Norman, M Volz

    Australia has seen unprecedented demand for coal exports in the last ten years and this demand is set to expand further still according to many analysts. This rapid increase in demand has placed press

    Sep 26, 2011

  • AUSIMM
    Exploring two approaches for real-time measurement of frother concentration

    By H Park, D J. Holland, L Wang, Y Matviychuk, Y Lee

    Reuse of process water in mineral and coal flotation plants is widespread to effectively reduce freshwater consumption. However, the accumulation of the frother in the recycled process water is a grow

    Aug 24, 2022

  • AUSIMM
    The New Development of Continuous Mass Mining Technology Research in China

    By Y, Li Jianxiong, Hu Hua, Gu Desheng

    After having briefed the technical and economical advantages of continuous mass mining in underground metal mines, the authors discuss the four stages of research and development of continuous mass mi

    Jan 1, 2000

  • AUSIMM
    Rock Mass Characterisation and Analysis for Excavation Design – A Discrete Fracture Network Approach

    By F M. Weir, M Fowler

    The design of excavations in rock must, implicitly or explicitly take into consideration the influence of small- and large-scale geological structures. For most sites the complexity of a fractured roc

    Nov 5, 2014

  • AUSIMM
    Field Characterisation of Two Full-Scale Waste Rock Piles

    By D J. Williams, G W. Wilson, S, A B. Tran

    A comprehensive field program was implemented to evaluate the internal structure and hydrology of two full-scale waste rock piles. The excavation of waste rock dumps for in-pit disposal at the two min

    Jan 1, 2003

  • AUSIMM
    Simulation Optimisation of Mine Operational Plans

    By H Askari-Nasab, E Torkamani, M M. Badiozamani, S P. Upadhyay, M Tabesh

    "Decision-making in mining is a challenging task. Optimal decisions regarding shovel and truck allocations, aligned with the optimal short-term production schedules, are crucial in keeping the operati

    Nov 24, 2014

  • AUSIMM
    Changing Trends in Column Flotation Use – Their Impact for Australian Mill Operators

    By D Frost, G Harbort, T Lipiec, N Deonarain

    "The use of flotation columns has remained a contentious issue among mill operators. There are those who consider them an essential part of any mineral processing operation, while others consider them

    Oct 10, 2016

  • AUSIMM
    The Case for an International Mining Law

    State ownership of minerals results in domestic legislation regulating mining operations. The mining industry today is dominated by a number of transnational companies, each subject to internal and ex

    Jan 1, 2004

  • AUSIMM
    Feasibility Studies, EPCM and the Environment ù Case Studies in Integrated Mine Development

    By R Aseervatham

    The fast tracked mine development strategy attempts to blend feasibility studies and engineering/commissioning functions into a streamlined process. In this compressed process, environmental issues ar

    Jan 1, 1999

  • AUSIMM
    The Future of Australia’s Mineral Wealth – Leasing to Support an Ageing Population

    By K Morrison

    Australia’s ageing population means that by 2050 there will be 2.7 people of working age to support each Australian aged 65 years and over compared with five working people per retiree today and compa

    Nov 22, 2011

  • AUSIMM
    Innovative Use of Screw Press Filtration in Tailings Dewatering Plant Design

    By D Nieuwkerk, V J. Absolon

    "Screw press technology is an innovative approach to tackling the growing pressure to conserve water and minimise the environmental impact of mineral tailings disposal. The principles of the technolog

    Sep 1, 2014

  • AUSIMM
    Integrating Sustainability Principles into Mineral Processing Plant Design

    By G Corder

    Even though most major operating companies in the minerals industry have Board-level endorsed sustainability principles and objectives, design engineers typically have no mechanism that allows them to

    Aug 8, 2011

  • AUSIMM
    Scoping of Feasibility Studies

    How often does one hear that a recent feasibility study was not a success? Alternatively, when scope of the feasibility study was sent out to tender there was a large discrepancy in tendered prices. I

    Jan 1, 1998

  • AUSIMM
    Assessment of Robertson (2010a) CPTu state parameter inversion method within Been et al. (1987) CPTu inversion parameter framework

    By K Smith

    This paper presents an assessment of the Robertson (2010a) method within the CPTu inversion parameter framework of Been et al. (1987), using CPTu calibration chamber data presented by Jefferies and Be

    Jul 1, 2021

  • AUSIMM
    Blast Monitoring and Blast Translation – Case Study of a Grade Improvement Project at the Fimiston Pit, Kalgoorlie, Western Australia

    By M Fitzgerald

    Fimiston Open Pit is operated by Kalgoorlie Consolidated Gold Mines (KCGM) as a joint venture between Barrick Gold and Newmont Mining. Over 110 years of underground mining resulted in the development

    Aug 22, 2011

  • AUSIMM
    An Approach to High Solids Slurry Pipeline Design

    By M Griffiths

    This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she

    Aug 8, 2011

  • AUSIMM
    Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning Scheduler

    By D R. Seaman, R P. Tooher, B A. Seaman

    "Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove

    Oct 10, 2016