Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Review of Prediction Methods for Ground-Borne Noise Due to Tunnel Construction ActivitiesBy D Davis
The prediction of ground-borne noise levels from tunnel construction activities requires knowledge of the input vibration forces from the vibration source(s) into the cutting face, knowledge of the vi
Mar 8, 2011
-
Empirical mill throughput modelling and linear programming for blend optimisation at the Phu Kham copper-gold operation, LaosBy B Saunders, J Carpenter
PanAust’s Phu Kham copper-gold operation (Phu Kham) in Laos is currently limited by throughput in the Semi Autogenous Grinding (SAG) mill. The ability to accurately predict SAG mill throughput (throug
Sep 20, 2017
-
KEYNOTE: Using Metallurgical Data to Drive Continuous ImprovementBy R Dunne
"Continuous improvement on metallurgical treatment plants is possible only when good data and analysis of the data are available. Good data implies appropriate and accurate mass measurement coupled wi
Oct 10, 2016
-
Total Integrated System Simulation for Master Planning of the Dalrymple Bay Coal ChainBy B Olsson, R Norman, M Volz
Australia has seen unprecedented demand for coal exports in the last ten years and this demand is set to expand further still according to many analysts. This rapid increase in demand has placed press
Sep 26, 2011
-
Exploring two approaches for real-time measurement of frother concentrationBy H Park, D J. Holland, L Wang, Y Matviychuk, Y Lee
Reuse of process water in mineral and coal flotation plants is widespread to effectively reduce freshwater consumption. However, the accumulation of the frother in the recycled process water is a grow
Aug 24, 2022
-
The New Development of Continuous Mass Mining Technology Research in ChinaBy Y, Li Jianxiong, Hu Hua, Gu Desheng
After having briefed the technical and economical advantages of continuous mass mining in underground metal mines, the authors discuss the four stages of research and development of continuous mass mi
Jan 1, 2000
-
Rock Mass Characterisation and Analysis for Excavation Design – A Discrete Fracture Network ApproachBy F M. Weir, M Fowler
The design of excavations in rock must, implicitly or explicitly take into consideration the influence of small- and large-scale geological structures. For most sites the complexity of a fractured roc
Nov 5, 2014
-
Field Characterisation of Two Full-Scale Waste Rock PilesBy D J. Williams, G W. Wilson, S, A B. Tran
A comprehensive field program was implemented to evaluate the internal structure and hydrology of two full-scale waste rock piles. The excavation of waste rock dumps for in-pit disposal at the two min
Jan 1, 2003
-
Simulation Optimisation of Mine Operational PlansBy H Askari-Nasab, E Torkamani, M M. Badiozamani, S P. Upadhyay, M Tabesh
"Decision-making in mining is a challenging task. Optimal decisions regarding shovel and truck allocations, aligned with the optimal short-term production schedules, are crucial in keeping the operati
Nov 24, 2014
-
Changing Trends in Column Flotation Use – Their Impact for Australian Mill OperatorsBy D Frost, G Harbort, T Lipiec, N Deonarain
"The use of flotation columns has remained a contentious issue among mill operators. There are those who consider them an essential part of any mineral processing operation, while others consider them
Oct 10, 2016
-
The Case for an International Mining LawState ownership of minerals results in domestic legislation regulating mining operations. The mining industry today is dominated by a number of transnational companies, each subject to internal and ex
Jan 1, 2004
-
Feasibility Studies, EPCM and the Environment ù Case Studies in Integrated Mine DevelopmentBy R Aseervatham
The fast tracked mine development strategy attempts to blend feasibility studies and engineering/commissioning functions into a streamlined process. In this compressed process, environmental issues ar
Jan 1, 1999
-
The Future of Australia’s Mineral Wealth – Leasing to Support an Ageing PopulationBy K Morrison
Australia’s ageing population means that by 2050 there will be 2.7 people of working age to support each Australian aged 65 years and over compared with five working people per retiree today and compa
Nov 22, 2011
-
Innovative Use of Screw Press Filtration in Tailings Dewatering Plant DesignBy D Nieuwkerk, V J. Absolon
"Screw press technology is an innovative approach to tackling the growing pressure to conserve water and minimise the environmental impact of mineral tailings disposal. The principles of the technolog
Sep 1, 2014
-
Integrating Sustainability Principles into Mineral Processing Plant DesignBy G Corder
Even though most major operating companies in the minerals industry have Board-level endorsed sustainability principles and objectives, design engineers typically have no mechanism that allows them to
Aug 8, 2011
-
Scoping of Feasibility StudiesHow often does one hear that a recent feasibility study was not a success? Alternatively, when scope of the feasibility study was sent out to tender there was a large discrepancy in tendered prices. I
Jan 1, 1998
-
Assessment of Robertson (2010a) CPTu state parameter inversion method within Been et al. (1987) CPTu inversion parameter frameworkBy K Smith
This paper presents an assessment of the Robertson (2010a) method within the CPTu inversion parameter framework of Been et al. (1987), using CPTu calibration chamber data presented by Jefferies and Be
Jul 1, 2021
-
Blast Monitoring and Blast Translation – Case Study of a Grade Improvement Project at the Fimiston Pit, Kalgoorlie, Western AustraliaBy M Fitzgerald
Fimiston Open Pit is operated by Kalgoorlie Consolidated Gold Mines (KCGM) as a joint venture between Barrick Gold and Newmont Mining. Over 110 years of underground mining resulted in the development
Aug 22, 2011
-
An Approach to High Solids Slurry Pipeline DesignBy M Griffiths
This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she
Aug 8, 2011
-
Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning SchedulerBy D R. Seaman, R P. Tooher, B A. Seaman
"Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove
Oct 10, 2016