Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Alternative Access, Mining and Hoisting for Underground Deposits

    It is proposed to consider a new access, mining and hoisting system for underground deposits, as an alternative to the commonly used decline or vertical shaft access. The proposed system offers fundam

    Jan 1, 2000

  • AUSIMM
    Total Energy

    The phrase "Total-Energy" has, during the past few years, become widely used to describe a wide range of very different operations. However, if accurately described they all have one basic factor in

    Jan 1, 1970

  • AUSIMM
    Optimisation Improvements in Whittle using Stope Optimisation Software

    Mining One (M1) is often challenged with the task of evaluating deposits considering open cut and/or underground (UG) mining methods. In many near surface deposits a combination of both methods result

    Dec 6, 2010

  • AUSIMM
    The Mineral Industry - What Next? - 1

    The theme of my address to your Institute, indeed its name, is "The Mineral Industry - What Next?" Knowing that I was required to make four appearances, and not wanting to be too repetitious

    Jan 1, 1984

  • AUSIMM
    Ore Type – Everything to Someone but Nothing to Anyone

    By J Jackson, M F. Young

    "Ore is the economic portion of a mineral deposit that can be extracted economically. Hence an ore type is a classification of the ore based on one or more dominant characteristics in order to enable

    Jun 15, 2016

  • AUSIMM
    The Future of the Victorian Brown Coal Industry

    The phrase "Total-Energy" has, during the past few years, become widely used to describe a wide range of very different operations. However, if accurately described they all have one basic factor in

    Jan 1, 1970

  • AUSIMM
    The Development of Colloidal Mixer Base CRF Systems

    By A E Reschke

    The high-shear colloidal mixer is generally recognised as the most efficient method of mixing cement based grouts. Only recently however has this technology been applied to the production of cemente

    Jan 1, 1998

  • AUSIMM
    Testing new estimation techniques – rank and replace: a stockwork case study

    By D Finn, D Kentwell

    Experience has shown that the E-Type multiple indicator kriging (MIK) estimation technique often works well for resource estimation in stockwork mineralisation that contains a mixture of high and low-

    Sep 20, 2017

  • AUSIMM
    Tasmania's Mining Heritage

    The region we call the West Coast is acknowledged as one of the richest and most diverse mineral provinces in the world. It's the most rugged part of Tasmania and our island is one of the most ru

    Jan 1, 1993

  • AUSIMM
    Recent Advances in the Simulation of Mineral Processing Circuits Using Artificial Intelligence

    By van der Walt TJ, van Deventer JSJ, Reuter MA

    Owing to their complexity, many metallurgical processes are difficult to model fundamentally, and as a result more attention has been focused on the use of artificial intelligence techniques to simu

    Jan 1, 1993

  • AUSIMM
    Productivity Improvement Without Capital Expenditure - Optimising Machine and Labour Utilisation

    The history of mining is rightly proud of its achievements in improving productivity and cost improvements over the years. No matter what measure is used, tonnes per manhour, cost per tonne, etc vast

    Jan 1, 1999

  • AUSIMM
    Reliability Analysis of Semi-Continuous Coal Haulage System

    By Daxian Z, Youdi Z, Shucai Y

    The Huolinhe surface mine is a very large-scale surface coal mine, located in the north-east area of China with a production rate of 1.2 Mtpa. Its coal haulage system has a large capacity, long tran

    Jan 1, 1995

  • AUSIMM
    Mount Isa Mines - 1100 Orebody, 35 Years On

    By S DeKruijff

    The Mount Isa Mines Copper Mine in Mount Isa started producing copper in 1966. The Copper Mine gradually increased production rates to nearly six million tonnes per year. Over the last three years the

    Jan 1, 2000

  • AUSIMM
    Cost Effective Concentrator Design

    By G Lane

    This paper discusses the factors that contribute to the cost effective design of a concentrator. Concentrator design and layout outcomes are functions of the team (engineer’s and owner’s) participati

    Aug 8, 2011

  • AUSIMM
    Modelling Intact Rock Strength of Clay-Rich Rocks with Geochemistry at the Simandou Iron Ore Deposit, Guinea, West Africa

    By M Campbell, A Jeffcoate, J-C Vannay, B Perriaux

    Phyllite waste rock at the Simandou Pic de Fon and Oueleba Iron Ore deposits (Guinea, West Africa) variably weather to form clay-rich rocks. This weathering modifies the mineralogical, geochemical and

    Aug 12, 2013

  • AUSIMM
    Selection of Hoisting Wire Ropes Used in Indian Mines - An Economical Approach

    By M K. Singh

    Mining is nothing but an art - besides being a science - of extracting valuable minerals from the womb of the mother earth. In this gigantic task, a large number of machinery and equipment are employe

    Jan 1, 2000

  • AUSIMM
    Distinguishing Carbon Fractions in Coalmine Rehabilitated Soils

    By J Chan, T Baumgartl, A Plante, C Peltre, P D. Erskine

    Mine soils are often organic matter and carbon poor due to disturbance, topsoil stockpiling and mixing with spoil. They present an opportunity to observe the accumulation of soil carbon arising from r

    Jul 16, 2014

  • AUSIMM
    Developing an evaluation method for bulk ore sorting

    By S Dykes, R J. McCarthy, B Klein

    There is growing interest in the mining industry on the application of ore sorting. While many are familiar with particle sorting, including the limitations that technology presents (e.g. throughput),

    Nov 10, 2020

  • AUSIMM
    Reliability and Coal Exporting

    Reliability is not only important in coal mine planning, production and control. Reliability is also most important, and indeed is fundamental, to successful coal exporting.Coal preparation, blending,

    Jan 1, 1991

  • AUSIMM
    Study of the Geodynamic Regime of the Region Under Large-Scale Mining in the Apatite-Nepheline Deposits in the Kola Peninsula, Russia

    By V A. Maltsev, V I. Panin

    The question of prediction and prevention of dynamic events û rock bursts (RB), tectonic rock burst (TRB) and mining-induced earthquakes (MIE), induced by large-scale mining, are discussed. The mine i

    Jan 1, 2000