Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Setting new standards at Kanmantoo – effective grade control proceduresBy M Reid, H Arbon
Hillgrove Resources (HGO) commenced open pit mining in 2011 and from 2011 to 2016 the geology team experienced a consistent negative reconciliation between grade control estimated copper (Cu) grade an
Sep 20, 2017
-
Case study – an analysis of reliability and efficiency: ultrasonic versus annubar technologiesBy M J. Shearer
An investigation into the reliability of the data being collected at the Mount Isa Mines site operated by Glencore in Queensland allowed on-site ventilation personnel to scrutinise pressure and volume
Aug 28, 2017
-
Re-defining Compliance Planning through data integration and ultra-short-term schedulingBy C Fong
Compliance Planning is an active approach to ensure mining operations align more closely to their longer-term plans. Through Compliance Planning, operations can not only measure their performance on i
Jun 22, 2022
-
Inline analysis of washability parameters for process controlBy M P. Cipold, J F. Bachmann, C C. Bachmann, J Ha, H B. Wurst
In washability, the objective is to establish the set of maximum possible separation performance criteria for a given mineral feed. The method of choice for this has been the conventional sink–?float
May 9, 2017
-
Are our closure planning and regulatory processes adequate to identify, quantify and appropriately transfer residual risks after successful mine rehabilitation?By P B. Swart, P D. Erskine
Despite an increasing focus by media, communities and activists driving an elevated regulatory focus in Australia and indeed some other mining jurisdictions, the mining industry globally has had limit
Jul 25, 2018
-
Blasting at the Mt Wellington Quarry - 1997-1999By M Lentz
This paper will discuss the issues associated with blasting in an urban mining environment that have been addressed by Winstone Aggregates at the Mt Wellington Quarry. These issues include - control o
Jan 1, 1999
-
Wide area mapping of ground instabilities from space: InSAR for geotechnical risk assessment and hazard monitoringBy J Morgan
Regular monitoring of surface deformation over mine sites is important for providing updated information to managers regarding geotechnical risks related to ground instabilities. This is particularly
Nov 30, 2018
-
High Resolution Seismic Reflection and its Implications for Mine Risk Management: a Case Study from the Huntly Coalfield, New ZealandGeological hazards such as faulting, basement ridges, and zones of "thin" (< 6 m) coal have a major impact on mining economics of underground operations in Huntly Coalfield. Experience has shown th
Jan 1, 1997
-
Treatment of Mixed Sulphides by the ôHorwoodö ProcessALTHOUGH the development of the various flotation processes during the last 8 years has been so revolutionary, this development has been, until recently, entirely confined to the separation of the gan
Jan 1, 1912
-
Recognising and Integrating Stakeholder Landform Expectations into Life-of-mine PlanningBy P D. Erskine, A Hine
The current Queensland Government’s rehabilitation guidelines for post-mining landforms present a hierarchy of preferred outcomes for different areas within the mine site (see Figure 1). Within all ar
Jun 28, 2016
-
Risk Analysis in Open Pit Mine PlanningSophisticated pit optimisation software has allowed mine planning engineers to generate mining outlines that consider the numerous factors that have a major effect on the success or otherwise of a min
Jan 1, 1998
-
Geology, Alteration and Mineralisation of the Tampakan Copper DepositBy A Madera, R Watt
The Tampakan deposit is a strongly telescoped high-sulphidation-epithermal/ porphyry deposit pair which is hosted by a sequence of probable Pliocene age subaerial andesite flows. These host units lie
Jan 1, 1999
-
The Need for Specification Development in Australian Road TunnelsBy T Brown
Australia is now committed to the most significant period of infrastructure investment since the 1960s and the current climate of project finance and public private partnership (PPP) model uncertainty
Mar 8, 2011
-
Size by Size Analysis of Operating Characteristics of Jameson Cell Cleaners at the Bajo De Alumbrera Copper/Gold ConcentratorBy A Murphy, D Lauder, J Miranda
Minera Alumbrera Limited operates the Alumbrera concentrator, treating a nominal 80 000 tpd of porphyry gold/copper ore. It is located in Argentina, 1200 km north-west of Buenos Aires in Catamarca Pro
Jan 1, 2000
-
Characterising the Reasons for the Difference in Performance of Two Ore Blends in Early Processing at OZáMinerals Prominent Hill OperationBy D J. Bradshaw, E M. Wightman, C L. Evans, B Triffett
During the commissioning phase of Prominent Hill, periods of reduced recovery were experienced with higher-grade ore blends. This was unexpected and as part of the process to identify the cause, surve
Oct 29, 2012
-
Investigation of Shield Face Stability by Transparent Soil ModelsBy M Ahmed
Reliable face support pressure is necessary for shield driven tunnels in cohesionless soils to prevent excessive ground movements. This paper presents experimental work on stability of a tunnel face u
Mar 8, 2011
-
Development of a Goaf Pipe Gas Sampling Technique in Detecting Spontaneous Combustion in CollieriesA recently developed technique for use in collieries is described in which samples of gas of relatively high vitiation value are obtained from points deep within a developing goaf by means of pipes. T
Jan 1, 1961
-
Soil Air Carbon Dioxide and Oxygen Measurements as an Aid to Exploration for Concealed Sulphide Mineralisation in South Australia - a Practical AssessmentBy Morris B. J
Soil air samples taken from the top one metre of the soil profile, were measured for C02 and 02 using portable field analysers at a number of sites of known sulphide mineralisation in South Australia.
Jan 1, 1993
-
The integration of mine-to-mill and grade engineering at Anglo American’s Los Bronces Mine using IESBy J Rutter, E Amini, D La Rosa, N Beaton, M Scott, F Faramarz, L Keeney
Anglo American’s Los Bronces copper mine in Chile has been conducting detailed assessments investigating value adding options for their asset. The mine has conducted several detailed Mine-to- Mill and
Nov 10, 2020
-
The Exploration FuturePredicting the future is a task that should always be delegated. If that is not possible, then stating your views confidently, but retrospectively, is preferable. Hindsight encourages clarity of thoug
Jan 1, 1997