Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Sensor-based particle sorting: technical and economic evaluation of the applicability in a zinc ore mineBy P Esteves, J L. Bechir, R Galery, C Senna, V Souto
The current moment experienced by the mineral industry is marked by a series of economic, social and environmental challenges. Among the main challenges, it is important to highlight the decreasing in
Nov 10, 2020
-
REGCHEM Database Developments and Analysis of Stream Sediment Geochemical Data for OtagoBy R L. Brathwaite, R Carver
The REGCHEM (Regional Exploration Geochemistry) database of open file mining company data, managed by GNS Science, has recently been upgraded with the compilation of additional data, especially for th
Jan 1, 2007
-
Into the Belly of the Flash à Insights into the Mechanisms at Work Within a Flash Flotation CellBy D J. Bradshaw, E M. Wightman, B Newcombe
Flash flotation plays an integral role in many of the gold and sulfide mineral concentrators around the world, and yet despite this widespread use, very little information on this unit process is avai
Oct 29, 2012
-
Maximising the Output of a Surface Bulk Air Cooling Installation on a South African MineBy T Baard, A Pieters
This paper deals with the design and implementation of a 17 MW (nominal) surface cooling installation at Impala Platinum No 14 shaft located in Rustenburg, North West Province, South Africa.The coolin
Jan 1, 2005
-
Signals of Mine Closure - A Strategic Approach for Retrenchment - A Case Study of Porgera Gold Mine, Papua New GuineaThe issue of retrenchment is a topic of considerable relevance for the Papua New Guinea (PNG) mining, petroleum and gas industries. The unique environments in which Porgera Joint Venture (PJV) and oth
Jan 1, 2009
-
Thermodynamics of Non-Cyanide Gold SolventsThermodynamics of Non-Cyanide Gold Solvents The present status of the raw material base in the gold industry requires specific ways to recover gold and silver from ores. Most gold is closely associat
Sep 13, 2010
-
The Application of Rock Engineering Systems to Block Caving to Identify the Effective ParametersBy M Mohammad Khani
An economic block cave is dependent to the characteristics of the rock mass at stages of caving. These are cave initiation, propagation and ore flow. In this research, the rock engineering system (RES
May 9, 2016
-
Characterisation of Glassy and Heterogeneous Cementing Phases of Municipal Solid Waste of Incineration (MSWI) Bottom AshBy R Badreddine, J Rose, L De Windt, P Chaurand, L Raimbault
Municipal solid waste of incineration (MSWI) bottom ashes are recycled as aggregates in civil engineering. These heterogeneous materials are composed of crystalline and glassy solid phases which conta
Jan 1, 2008
-
Application of normative ore mineralogy to geological and metallurgical data sets at the Hera Au-Pb-Zn-Ag mine, New South Wales, AustraliaBy A R. McKinnon
The recently opened Hera Au-Pb-Zn-Ag mine in central New South Wales has provided an ideal opportunity to demonstrate the calculation of sulfide ore mineralogy using normative methods. Normative miner
Sep 20, 2017
-
Construction of the Molineux Facility Underground LPG Storage CavernThe underground storage of LPG and other hydrocarbons is in current commercial use in Northern Hemisphere countries in Europe, Asia and the USA.Elgas Pty Ltd, a 50 per cent joint venture between AGL a
Jan 1, 1999
-
The Froth Stability Column ù Measuring Froth Stability at an Industrial ScaleBy J J. Cilliers, K Hadler
Froth structure and stability are known to play important roles in determining mineral flotation recovery and selectivity. However, measuring froth stability in a consistent manner remains a significa
Jan 1, 2005
-
What Would Sustainability in the Mining Industry Look Like and How Do We Get There?æSustainabilityÆ is one of those words that has gained more usage in popular discourse than in the dictionary. In fact it is not in many dictionaries at all. Typically, given this, it also seems to me
Jan 1, 2002
-
Measurement of Blast Vibrations: Compliance under the RMAWith the change in legislation under the Resource Management Act 1991 (RMA), the responsibility for administering the effects of blasting on the environment, has transferred from an essentially centra
Jan 1, 1996
-
An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut ProjectBy D J. Thobaven
Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu
Nov 24, 2014
-
The Importance of Evaluating Grinding PerformanceBy R L. Koenig
Previous papers at Metplant conferences have covered the options for crushing and grinding circuit selection. High Pressure Grinding Rolls (HPGR) may have considerable advantages over autogenous mill
Aug 8, 2011
-
In-pit In Situ Recovery – a New Approach That May Allow for Increased Value Extraction before Pit ClosureBy D J. Robinson, L L. Kuhar
"Regardless of orebody value, at some stage, the pit will reach a depth where the reward for mining wider and/or deeper is not justified by the anticipated returns. ‘Last-blast’ strategies may help to
Nov 15, 2016
-
Comparison of dry VRM or HPGR circuits to wet milling circuitsBy G R. Ballantyne, G Lane
Dry milling circuits that include high pressure grinding rolls (HPGR) or vertical roller mills (VRM) and air classification have replaced dry ball milling in cement production, but how do they compare
Aug 24, 2022
-
Resource and Reserve category inflation – known rewards, hidden risksBy M Bond, R R. Hargreaves, G W. Booth
There are numerous causes of speculative mineral resource and reserve inflation. Traditionally, these are linked to issues of data accuracy or misinterpretation, the use of overly optimistic estimatio
May 24, 2023
-
Thermal Coal Industry – Is Longwall Mining Currently a Life-of-mine Option in Australia?By T W. C Stambolie
Longwall mining is a form of underground mining and the principal extraction method for underground coal mining in Australia. The method is used in the mining of both thermal and metallurgical coal. T
Jun 28, 2016
-
Integrating Native Title Agreement Implementation with the Culture and Operation of a Business to Deliver Social Licence and Commercial Licence to OperateRio Tinto Iron Ore is currently working towards finalising comprehensive Native Title land access agreements, which cover all of the current eleven mines and infrastructure owned and operated by the c
Jun 1, 2010