Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The MTM copper process

    By R W. Shaw

    The MTM Process targets treating lower grade and/or problem concentrates that are not attractive to smelters. The process has been developed at laboratory scale for copper and is based on a related de

    Aug 24, 2022

  • AUSIMM
    Removal of Horizontal Level Pillar by Means of Blast Hole Diamond Drilling at New Occidental Gold Mine, Cobar, N.S.W.

    By Creelman C. A

    The removal of a horizontal piIlar between Nos. 9 and 11 levels (1,116 feet from the collar of main shaft) was successfully carried out by blast hole drilling, and, to the best of the authors' kn

    Jan 1, 1944

  • AUSIMM
    Reliability of Predictive Methods for Control of Roof Strata in Longwall Faces

    In a state-of-the-an review of predictive methods for longwall support load calculation, special respect is paid to those techniques which enable actual roof conditions and local lithology of strata t

    Jan 1, 1991

  • AUSIMM
    Enhanced Risk Reduction Using Early Warning Technologies Embedded in Active Explosion Suppression Systems

    By J J. L du Plessis, A Spaeth

    The objective of this paper is to demonstrate the efficiency of machine-mounted active explosion suppression systems (AESS). Their proven effectiveness against methane explosions is highlighted, as we

    Aug 31, 2015

  • AUSIMM
    Implementation of Blasting to Replace Free Digging in a Fume Prone Environment at Lemington Mine

    By D Stow, M Edmondson

    Lemington coal mine is operating in an environmentally sensitive area in the Hunter Valley, NSW, Australia. Late in 1999 the southern pit was developed using a series of box cut blasts. After the init

    Jan 1, 2001

  • AUSIMM
    Ground support design of Northparkes E26 Lift 1 North block cave mine

    By Z Li, A Fleming, S Webster, L Snyman

    Northparkes Mines is developing the E26 Lift 1 North block cave mine, which is adjoined to the existing E26 cave. This paper presents the challenges and methods used to design the ground support syste

    Mar 15, 2021

  • AUSIMM
    Fingerprinting and Signatures - Tracing Mine Impacts in Complex Aquatic Systems

    By C Bonini, A Markham, P Whittle, B Pearson

    "Mine-derived sedimentation in rivers can have significant impacts on the processes and features of the receiving environment and impact on communities reliant on this environment. However, identifyin

    Nov 26, 2013

  • AUSIMM
    Problems of the Slurry Shield Method and Their Counter Measures

    This paper first describes the essentials of the slurry shield method and its achievements, then problems encountered during driving tunnels and their countermeasures, and finally shows problems t

    Jan 1, 1976

  • AUSIMM
    Suitability of Leached Ash as an Alternative Landfill Cover Material

    By A Bouazza, J Kodikara

    In this study, 23 samples of leached ash (LA) were collected from an ash pond at Loy Yang Power Station and geotechnically characterised. The samples were collected at various depths and locations wit

    Jan 1, 2003

  • AUSIMM
    The Crushing and Conveying Operation at the Martha Mine

    In November 1999 Waihi Gold Mining Company commissioned its new crushing and conveying plant used to transport both ore and waste from the Martha Mine to its ore processing plant and also its tailings

    Jan 1, 2001

  • AUSIMM
    Geology of the Chatree Epithermal Gold Deposit, Thailand

    By V A. Diemar

    The Chatree Gold Project represents a greenfields discovery of metallurgically clean shallow gold mineralisation in a logistically simple terrain. Total Measured, Indicated and Inferred Resources are

    Jan 1, 1999

  • AUSIMM
    Tunnelling in the Snowy Mountains Area

    Some 50 miles of tunnel have been driven in the Snowy Mountains Area since tunnelling commenced in 1951. Hates have improved progressively due to the know-how of American supervision and use of large

    Jan 1, 1963

  • AUSIMM
    Underground Space and Urban Planning in Australia - Are They Compatible?

    This paper discusses the potential role of underground space and tunnelling in urban planning in Australia. The paper gives examples of the infrastructure and commercial applications of underground sp

    Jan 1, 1999

  • AUSIMM
    29th Annual Conference 1996 - Field Notes

    Greymouth River Dredge û Birchfield Minerals Ltd Blackwater Gold Mine û Macraes Mining Company Ltd Globe Progress Gold Mine û Macraes Mining Company Ltd

    Jan 1, 1996

  • AUSIMM
    Accurately estimating heat load from conveyed rock

    By M A. Tuck

    The dominant heat loads in a deep underground mine are the surrounding rock mass, autocompression and machinery. In addition heat can be contributed to by other sources. Many block cave, sublevel cave

    Aug 28, 2017

  • AUSIMM
    Dartbrook Mine- Greenfield Opportunities in the Upper Hunter Valley

    Dartbrook mine is a new greenfields thermal coal longwall mine located n the Upper Hunter Valley ten kilometres north of Muswellbrook Figure 1). Construction began in April 1993 with coal extraction

    Jan 1, 1995

  • AUSIMM
    Susceptibility and Gamma-Gamma Probe Measurements in Boreholes for Ore Boundary Determinations in LKAB's Iron Ore Mine in Malmberget, Northern Sweden

    LKAB operates two underground mines in Kiruna and Malmberget, Sweden. Blast furnace pellet is the main product and makes up 70 per cent of total production. The orebodies are hosted by 1910 - 1860 Ma

    Jan 1, 2006

  • AUSIMM
    Some Modern Methods of Coal Investigation as Applied to Queensland Coals

    The greater part of this paper comprises the material used in a lecture delivered to the South Queensland Branch of the Australasian Institute of Mining and Metallurgy in September, 1949. It contains

    Jan 1, 1950

  • AUSIMM
    Using a Sustainability Assessment Framework to Achieve Enhanced Legacy Outcomes

    By S R. Green, G D. Corder

    The legacy issues from mining can, and have often, extended well beyond the closure of operations. However, conventional cost-benefit analysis provides little incentive to implement initiatives at the

    Jul 10, 2012

  • AUSIMM
    Ore Selection to Maximise Value

    By J E. Everett

    Ore selection is generally a highly subjective task, with emphasis on producing product with a consistent target grade matching a perceived market requirement. A composite selection criterion ‘Comp’ (

    Jul 13, 2015