Coal Utilisation at the Kalgoorlie Nickel SmelterTo counter depressed world nickel prices, a continuing effort is being made at Kalgoorlie Nickel Smelter to reduce unit production costs. One major area in which production costs can be reduced is
Jan 1, 1987
-
Bioleaching Metals from Waste Printed Circuit Boards and the Shapes of MicroorganismsBioleaching Metals from Waste Printed Circuit Boards and the Shapes of Microorganisms
Sep 13, 2010
-
Design, Construction and Commissioning of A 4 Tonne/Hour Matte Fuming Pilot PlantBy Lightfoot BW, Foo KA, Conochie DS
Aberfoyle Limited operated a matte fuming pilot plant, incorporating a SIROSMELT furnace in 1980/81. This plant was a significant advance in both smelting and tin extraction technology. Important
Jan 1, 1984
-
Discovery of the High-Grade Gold Link Zone at Wafi, PNGBy A Vigar
Siliceous float sampled in the Wafi River by CRA Exploration in 1977 assayed 22 g/t Au and 89 g/t Ag. Follow up in 1979 led to the discovery of outcropping mineralisation now known as Zone A. Soil sam
Jan 1, 1999
-
Recent Development in Coal Mine Inertisation in AustraliaBy Cliff D, Harrison P. Hester C
During 1997 two different types of coal mine inertisation equipment were trialed in separate underground coal mines in Queensland.In April 1997 tests of the Polish developed GAG-3A inert gas generator
Jan 1, 1998
-
Improved Process Control with On-Stream Analysis at Pasminco Metals - EZ, Hobbart RefineryThe development of reliable and accurate solution sampling systems plus on-line atomic absorption spectrophotometers and voltammetric analysers at Pasminco Metals - EZ's (PMEZ) zinc refinery at
Jan 1, 1993
-
The Artificial Ventilation of the Broken Hill Proprietary Mine, N.S.W.UNLIKE coal mines, in which some form of artificial ventilation is rendered necessary by gases given off by the material mined and is also enforced by the mining laws of all countries, metalliferous m
Jan 1, 1921
-
Ore Dilution Versus Mine to Mill Optimisation at KCGMBy M Spiteri, S Woth, J Caratti, K Henley
Blasting is an essentially violent process aimed to disrupt and loosen rock for productive excavation and downstream processing. Dilution of the orebody to some extent is the inevitable result, partic
Jan 1, 2001
-
The Production of Cement in AustraliaBy Benkendorff P. N
Cement production in Australia approximates 6.5 million tonnes per year. Cement clinker is sourced from 15 plants which operate 28 kilns. Cement grinding is conducted at 14 of the clinker plants
Jan 1, 1989
-
Optimisation of the Drill Grid at the Weipa Bauxite Deposit Using Conditional SimulationBy J Bower
The JORC Code does not specify a definition for ælevel of confidenceÆ. The common approach in the mining industry is to use a certain drill spacing or number of data samples to classify resources by t
Jan 1, 2009
-
Obtaining a Representative RCSample ù The Cone Splitter Versus the Tiered Riffle SplitterBy P Church
What is the best method of splitting a sample from a reverse circulation drill rig? How important is it to obtain a correctly split sample? What is the impact of an incorrectly split sample? These are
Jan 1, 2003
-
The Rapid Determination of Silicon in Low-Alloy IronsBy Belcher C. B
A procedure was required for the rapid determination of silicon in low-alloy irons and a suitable method used the formation and reduction of silicomolybdic acid at 50°C. The procedure gives resul
Jan 1, 1965
-
Three-Dimensional Combined Gravity and Magnetics Inversion Modelling as a Guide to Target Haematitic Iron Ores û An Example from the Koolanooka South (Western Australia) ProspectBy J Finlay, P Betts, D Milton, H Williams
The aim of this paper is to present an innovative method to help delineate potential target volumes for haematite-goethite mineralisation as opposed to more magnetic ores. This is achieved through int
Jan 1, 2009
-
The Impact on Communities and Sustainable Development Through Furthering Investment in Extractive IndustriesThe Regional Development Council has initiated a project that aims to find better ways for further investment by extractive industry companies in sustainable regional and community futures. It will be
Jun 1, 2010
-
The Metallurgical Development of an Enargite-Bearing DepositThe Metallurgical Development of an Enargite-Bearing Deposit
Sep 13, 2010
-
Parameters Affecting the Shield Support Efficiency in Longwall MiningBy Hsiung SM, Jiang YM
The orientation and location of the hydraulic legs are two very important parameters for the design of shield supports in longwall mining. Studies have shown that leg orientations and locations of
Jan 1, 1988
-
Application of Mine Records to Reduce Project Risk During the Evaluation of Historical GoldfieldsBy W B. Edgar, I M. Platten, C A. J Towsey, B W. Cuffley
The evaluation of historical goldfields has been common over the past 15 years, reflecting changing economic conditions, improvements in knowledge and technology and lack of greenfield sites. Many gol
Jan 1, 2009
-
Challenges within the minerals industry R&D landscape in AustraliaBy P Revell, A Jenkin
This paper presents an analysis of significant Australian-based R&D programs focussed on the minerals industry, which was commissioned by CRC ORE. The landscape analysis may assist organisations with
Nov 10, 2020
-
Developing a æNew and InnovativeÆ Process Flow Sheet - Traps for all Players of all AgesBy J Canterford
There is an apparent push to develop and commercialise "new and innovative" process flow sheets. A not-too-difficult reality check clearly demonstrates that the success rate of this push is not partic
Jul 15, 2013
-
Roadway and Pillar Design Considerations for Development and Longwall Extraction at Central Colliery, QueenslandBy Ward B
Central Colliery was developed to exploit large underground reserves in the German Creek lease. It was planned from the outset as a retreating longwall operation and is the first longwall mine in
Jan 1, 1986