Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Compatibility of Major Economic Criteria for Project Evaluation

    The most frequently applied project evaluation criteria are the Net Present Value, the Internal Rate of Return, and the Pay Back Period. Unfortunately, the Internal Rate of Return and the Pay Back Per

    Jan 1, 1991

  • AUSIMM
    The Influence of Mining on Sediment Geochemistry of the Waitekauri Catchment, Waihi, New Zealand

    By J G. Webster-Brown, K L. Brown

    The Waihi Region is host to many low sulphidation epithermal Au-Ag deposits. The Golden Cross mine located at the head of the Waitekauri River, eight kilometres NW of Waihi, was a gold mining operatio

    Jan 1, 2003

  • AUSIMM
    The Fan Installation at Laleham Colliery

    Underground mine ventilation is now com monly simulated on a digital computer. Such a programme, incorporating natural ventilation has been modified by others to account for methane emission and el

    Jan 1, 1983

  • AUSIMM
    The Methodology Behind the Development of the Vera/Nancy Mine

    Within ten months of the first significant intersection on the Vera deposit, approval was given to proceed with a $28.3 M underground development of the Vera-Nancy gold mine. Contrary to what the time

    Jan 1, 1998

  • AUSIMM
    Redevelopment of the Morning Star Gold Mine - ABSTRACT ONLY

    Morning Star Gold aims to enter the ranks of Australia's gold producers, revitalising the Eastern Victorian Goldfi elds in the second half of 2010 - the fi rst gold production in around 50 years

    Aug 1, 2010

  • AUSIMM
    The Changing Role of Representative Bodies and Institutes

    Change is inevitable but learning from change is an option. Willingness to learn is one of the first lessons that a leader must learn. Get comfortable and get left behind. I propose to outline the mai

    Jan 1, 2000

  • AUSIMM
    The Mercury Content of Gold in Mesozoic Vein Deposits, Otago, New Zealand

    By D Craw

    Previous studies of alluvial gold in Otago and Southland placer deposits have suggested a gold-mercury association for some deposits derived from Caples Terrane schist, whereas alluvial deposits on To

    Jan 1, 2003

  • AUSIMM
    The New Southern Railway - Underground Construction in an Urban Environment

    The Airport Link Railway utilises innovative solutions to a number of issues associated with underground development and transport infrastructure planning. It is typical of the major change underway i

    Jan 1, 1999

  • AUSIMM
    The Use of Seismic Methods for the Detection of Dykes

    By Cocker J, Urosevic M

    Seismic methods have become common for the detection of low-throw faults ahead of underground coal mining. Surface seismic methods cannot theoretically be used where dykes occur, because seismic waves

    Jan 1, 1998

  • AUSIMM
    The Handling of Materials at the Risdon Works of the Electrolytic Zinc Co. of Australasia Ltd.

    THIS paper deals with the handling of the various materials used in the 100-ton zinc plant at Risdon, and, in view of the magnitude of the works, the configuration of the ground covered by these works

    Jan 1, 1923

  • AUSIMM
    Presidential Address, 1971 The Future of the Australasian Mineral Industry

    One would anticipate that after 40 years in the mineral industry it would be simple to project the trends at least 5 or 10 years into the future. However the last 20 years, 1950-1970, have been so dif

    Jan 1, 1971

  • AUSIMM
    Geometallurgical Challenges of Namakwa Sands û A South African Titanium-Zirconium Heavy Minerals Mine

    By A Rozendaal

    Namakwa Sands, a heavy minerals beneficiation business situated along the west coast of South Africa, is a major producer of titanium slag, pig iron, ceramics quality zircon and rutile concentrate to

    Jan 1, 2008

  • AUSIMM
    Fundamentals Research on the Port Pirie Lead Blast Furnace Slags

    The great problem at Port Pirie and many other lead smelters has always been to keep the lead content of the slags down to a low level. This has been done in the past largely by empirical methods, the

    Jan 1, 1956

  • AUSIMM
    Particle Mechanics and the Design of Cyclone Tribochargers

    Particle Mechanics and the Design of Cyclone Tribochargers Triboelectric separation is a dry electrostatic technique that has shown promise in several particle processing applications. A tribocharger

    Sep 13, 2010

  • AUSIMM
    Comminution Kinetics for Multi-Mineral Ores

    Comminution Kinetics equations are developed to take into account difference of grindability of mineral components. The equations describing both batch and closed circuit grinding or crushing processe

    Jan 1, 1985

  • AUSIMM
    Condition Monitoring and Maintenance of Underground Load-Haul-Dump Machines

    At the LKAB, Iron Ore Mine, Kiruna, Sweden a preliminary investigation into the reliability characteristics of a fleet of load-haul-dump machines has shown that the hydraulic system is one of the most

    Jan 1, 1991

  • AUSIMM
    The On-Going Rehabilitation Of The Anglesea Brown Coal Mine

    Alcoa of Australia Limited owns and operates a 150 MW power station adjacent to the coastal township of Anglesea in south western Victoria.The power station was constructed in the mid 1960s to supply

    Jan 1, 1992

  • AUSIMM
    Integrated Approach to Mine Groundwater Assessment

    By B Mil, D P. Adhikary, M S. Craig, P Rutzou

    As shallow coal reserves with easier mining conditions are exhausted, future deep coal mining with difficult mining conditions may face significant economic, technical and environmental challenges. Mo

    Jan 1, 2006

  • AUSIMM
    Environmental Impact of the Imperial Smelting Process

    By Bishop D. J

    The Imperial Smelting Process for the simultaneous production of zinc and lead is probably regarded by the ecologist as a necessary evil with the benefits of its products marginally outweighing the

    Jan 1, 1993

  • AUSIMM
    The Application Of Ditch Witch Sampling In Oxidised Open Cut Gold Mines

    The current boom conditions in the Gold Mining Industry, open cut low grade gold mines have become the initial cash flow source for most companies. To achieve the required cash flow the head grade

    Jan 1, 1987