Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Important Advances in the Development of High Pressure Rolls Communication for the Minerals Industry

    By Kellerwessel H, Oberheuser

    Since its invention by Professor Klaus Schonert of the University of Clausthal, Germany, high pressure rolls comminution has attained near total acceptance as the preferred method of size reduction

    Jan 1, 1992

  • AUSIMM
    The Measurement and Control of Dilution in an Underground Coal Operation

    Dilution in underground coal operations can be underestimated by up to five times during feasibility studies, with disastrous economic consequences. Every one per cent of stone waste introduced can re

    Jan 1, 2003

  • AUSIMM
    Infrastructure Development for the Ulan Project

    Extensive infrastructure construction works were required for the development of the underground and open-cut coal mine at Ulan to a production capacity of 5 million tonnes of steaming coal per an

    Jan 1, 1983

  • AUSIMM
    Hourly Ownership and Operating Cost Projection - Rubber Tyred Loaders

    Underground equipment owners and users in order to compete and succeed in being viable business propositions must continually balance costs with productivity. By reducing their hourly ownership, ope

    Jan 1, 1990

  • AUSIMM
    Long Rockbolt Support at New Broken Hill Consolidated Limited

    Stope back conditions in the cut-and-fill stopes at New Broken Hill Consolidated Limited often deteriorate to such an extent that, because conventional rockbolts are not able to maintain safe working

    Jan 1, 1974

  • AUSIMM
    The Development of a Zinc-Based Touch-Up Solder for General Galvanised Products

    By Zervoudis J

    Limitations of current touch-up solders for galvanised steel include coating thickness control problems and poor corrosion and abrasion resistance as well as health and environmental concerns due to

    Jan 1, 1993

  • AUSIMM
    Stockpiles and Their Role in International Resource Management

    Proposals designed to use stockpiles and buffer stocks to achieve price stabilization and better resource use have a long history. They are super- ficially simple to understand. The benefits seem c

    Jan 1, 1978

  • AUSIMM
    CABS-A User-Oriented Costs and Budget System with Particular Emphasis on Responsibility Accounting

    CABS - Costs and Budget System - is being developed to provide more appropriate tools to assist cost control. The most important of these tools is responsibility accounting, that is to ensure the r

    Jan 1, 1977

  • AUSIMM
    Mount Isa Mines Limited Extensions to Plant

    Many mining companies, by their remoteness of location from source of power, have to generate their own power and must experience the same problem that had to be met when deciding to increase the capa

    Jan 1, 1953

  • AUSIMM
    The VIMP Program and Major Advances in Geological Mapping in Victoria

    By OÆShea P. J, Dickson T. W

    In April 1994 the Victorian Premier announced new State initiatives, collectively termed the Victorian Initiative for Minerals and Petroleum (VIMP), for exploration totalling $16.5 m over three yea

    Jan 1, 1997

  • AUSIMM
    Design Parameters for the Central Thickened Discharge Method for Tailings Disposal

    The central thickened discharge system of tailings disposal takes advantage of the natural beach slope formed by sub-aerially discharged tailings, and the non-segregating properties of thickened tai

    Jan 1, 1991

  • AUSIMM
    Management Education - The Need for Change

    After the last world war, management tended to change from an acquired skill more associated with experience than formal training, to a specific widely-recognised specialism requiring an involved form

    Jan 1, 1985

  • AUSIMM
    Breccias and Biofacies in Pliocene Sinter at Plumduff, Northland

    By K A. Campbell, K A. Rodgers

    The Plumduff sinter occurs at Whenuaroa, near Puhipuhi, approximately 30 km north of Whangarei. It is one of three residual sinters in the southern portion of a mid- to late-Pliocene geothermal system

    Jan 1, 2001

  • AUSIMM
    Mettalurgical evaluation of iron ore drum separators using density tracers

    By Lyman G. J

    Dense medium drum separator efficiency was analysed at two Western Australian iron ore concentrators. Efficiency data had hitherto been difficult to accumulate due to the high cost of analysing repres

    Jan 1, 1987

  • AUSIMM
    Geometallurgical Modelling – A Mineral Processor's Perspective

    By A Stradling

    For a geometallurgical program to be successful, linkage must be made between the geologists and geostaticians who understand and model the orebody, the metallurgists who determine the value that can

    Sep 5, 2011

  • AUSIMM
    Triboelectric Charge and Separation Characteristics of Industrial Minerals

    Triboelectric Charge and Separation Characteristics of Industrial Minerals The basic principles of triboelectric charge and separation of minerals and the factors affecting the entity of the charges

    Sep 13, 2010

  • AUSIMM
    Diatreme Breccia-hosted Epithermal Gold Deposit at Ridge Mountain, Eastern Mindanao, Philippines

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation.Low-sulfidation epithermal gold mineralisation at Ridge Mountain occurs within the Oligocene

    Mar 18, 2015

  • AUSIMM
    Recent Developments in Stress Analysis and Live Reclaim Prediction within Iron Ore Stockpiles

    By K C. Williams, A W. Roberts, J D. Prigge

    For stockpile design, the flowability and structural interfaces are critically dependant on the stress conditions throughout the pile. Historically, the predictive methodologies for stress determinati

    Aug 12, 2013

  • AUSIMM
    Analysing and Rehabilitating Rock Mass Failure in Critical Mine Infrastructure

    To optimise the haulage of the large tonnages produced from stopes in this high production gold mine, an ore pass and feeder system was introduced. This ore pass was designed and developed in 2006 and

    Nov 25, 2010

  • AUSIMM
    Pre-Strip-Mining by Bucket Wheel Excavators

    Dragline performance drops considerably when chop-down and double handling of material is needed due to increasing overburden thick- ness or total pit depth. Beyond a certain pit depth the dragline

    Jan 1, 1981