Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Development of Boomtype Tunnelling Machine for Hard RockBy Itoh K, Sakai K, Tsuji K
In Japan there exists a strong demand for mechanical excavation for tunnelling bacause the blasting method which produces much vibra- tions and noises is restricted in its applica- tion due to the f
Jan 1, 1987
-
Beneficiation of Nickel Lateritic Ore from Montes Claros de Goißs, BrazilBeneficiation of Nickel Lateritic Ore from Montes Claros de Goißs, Brazil Beneficiation is a key factor for both technical and economical aspects of industrial processing of nickel lateritic ores. A
Sep 13, 2010
-
Land Reclamation at WaihiOne of the most significant problems experienced in land reclamation work has been the tendency of earthmovers to over-compact the subsoils and topsoils. The need for extensive subsoil drainage, becau
Jan 1, 1991
-
A Carboniferous Bentonite Province in New South WalesRecently discovered Carboniferous bentonites are variable in charadeI and thickness, but being altered aeolian, ash-fall tuffs, they are probably extensive. Most are the Ca-montmorillonite type withou
Jan 1, 1965
-
Computerised Maintenance Systems at WEIPAComalco Aluminium Limited uses a computer system for cost, supply and maintenance reporting and control at its bauxite mine in Weipa, North Queensland. The system collects data on a daily basis at
Jan 1, 1983
-
Olympic Dam mine closure planning processBy G Hill, D Grant, M Tyler
Located approximately 570km NNW of Adelaide in South Australia, the Olympic Dam mine (OD) is the world’s fourth largest remaining copper and gold resource and the largest uranium resource. Discovered
Jul 25, 2018
-
Performance of Electrodes Containing Brown Coal Char in Alumina Reduction (76ee41ec-7c9b-4d9b-9404-4c3cd7756bf3)A predicted increase in aluminium production and the possibility of a diminishing supply of petroleum coke for anode electrodes in alumina reduction cells makes it desirable to find alternative electr
Jan 1, 1971
-
An analysis of impact of weak rock formation on mining-induced deformation of rock slopeBy A Sainoki, D Fukuda, K Shioya, C Zhang, M Sharifzadeh, T Yamaguchi, S Saydam, J Kodama, C A. Amagu, Y Fuji
In an open pit mining, ensuring stability of rock slope has been one of the major challenges. As the instability of rock slopes can results in slope failures; consequently, endanger the lives of worke
Nov 29, 2022
-
Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted AnnulusBy M Norbert, P Mok
The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double
Sep 17, 2014
-
The Environmental Component in Mining Project DevelopmentProgrammes of environmental investigations to identify and minimise impacts and satisfy government and community requirements have become an integral and rate determining component in the planning
Jan 1, 1983
-
Presidential Address, 1954Delivered at the University of Sydney, on June 4th, 1954.THE TORCH WE HOLDLast year Our Institute celebrated its Diamond Jubilee, coincident with the holding of the Fifth Empire Mining and Metallurigc
Jan 1, 1954
-
Minimization of Contamination of Mined Ore by Cemented Hydraulic FillA review is made of the limited published experience of the effects of cemented fill in flotation.A general approach is adopted in listing and discussing possible sources of, and reasons for, ore cont
Jan 1, 1974
-
In-Situ Rock Condition Assessment for Underground Mining OperationsBy Grant JR, McKavanagh BM, Dear SJ
A geophysical technique of rock mass assessment for engineering purposes is being investigated and shows positive correlation with direct structural logging and mapping techniques for the detection
Jan 1, 1981
-
Project Management Procedures Adopted for Control of the Engineering Aspects of the Melbourne Underground Rail Loop ProjectBy Smith G. A
The scope and complexity of the Melbourne Underground Rail Loop Project and the budget restraints on the planning, design and construction of the works necessitated sound manage- ment procedures fo
Jan 1, 1981
-
Geoscience Rating for Valuation of Exploration Properties - Applicability of the Kilburn Method in Australia and Examples of its UseBy Eupene GS
The valuation of exploration properties which contain no identified resources or reserves is the most subjective of all valuation tasks likely to be carried out by a geologist. The geoscience ratin
Jan 1, 1994
-
Uranium Mining in AustraliaAustralia had an active uranium mining industry in the 1950s with uranium oxide being supplied under contract to the atomic energy authorities of the U.K. and U.S.A. In the 1960s, when these con- tr
Jan 1, 1978
-
57 Fe M÷ssbauer Effect Spectroscopy Monitoring of Iron-Bearing Products from Beach Sand Minerals ProcessingBy D Mukendi-Ngalula, G Hearn
Beach sand minerals from the volcanic rock structures of the Drakensberg, Kwazulu-Natal, (South Africa) have been processed. Screening, flotation, spiral concentration and magnetic separation methods
Jan 1, 2000
-
Dewatering and Dry Disposal of Fine Bauxite ResidueBy Abbott T. M
Alcoa of Australia operates three Alumina refineries in the South West of Western Australia at Kwinana adjacent to the South suburbs of Perth and at Pinjarra and Wagerup in rural settings 100 and 1
Jan 1, 1989
-
Improvement of Blasting Productivity at Brunswick MineBy B Ellis
Brunswick Mine is one of the largest underground zinc/lead mines in Canada, producing 3.4 million tones of ore annually. As mining activities advance to deeper levels, ground pressure also becomes gre
Jan 1, 2001
-
Milling Methods and Costs at the Mount Isa Mines, Ltd., Mount Isa, Queensland, AustraliaBy Jacobsen L. K, Gross K. B
This paper, describing milling practice at Mount Isa Mines, is one of a series covering milling methods and costs that is being published by the Bureau of Mines, United States Department of the Interi
Jan 1, 1939