Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Cities as Mine Sites of the Future

    By M Warnken

    Major cities are not only the focal point for AustralianÆs work, leisure and homes, they also are the focal point for the flow of resources into the built environment, motor cars and transportation an

    Jan 1, 2006

  • AUSIMM
    Is Every Mine a Pilot?

    By G I. Lumley

    ‘Every mine is a pilot’ is an attitude which encourages the mining paradox of optimistic mine plans and equipment under performance; propped up by an environment lacking accountability. The premise th

    Jun 22, 2016

  • AUSIMM
    Ventilation and Cooling Design for Long Declines

    Declines for both access and rock haulage are replacing shafts for mining relatively shallow deposits of down to 1000 m below surface. Where the orebody does not outcrop and where surface access may b

    Jan 1, 2005

  • AUSIMM
    A Day in the Life of a Mine Worker in 2025

    By V Srinivasan, P Knights, C T. Farrelly

    By 2025, with the widespread industry adoption of remote operation centres and advanced analytics, mining companies will find themselves making better, more informed decisions across the value chain.

    Jan 1, 2008

  • AUSIMM
    Resources versus Reserves – Towards a Systems-based Understanding of Exploration and Mine Project Development and the Role of the Mining Geologist

    By J P. Sykes, A Trench

    "World-class mine projects are increasingly failing to become world-class mines. Non-technical, socio-political and environmental problems seem, in part, to be the cause. However, the intangible and q

    Aug 18, 2014

  • AUSIMM
    The use of the Main Ramp as a Mine Exhaust at the Kencana Mine, Indonesia

    By D J. Brake

    Faced with the need to improve workplace conditions in both its development and production headings in its existing K1 orebody, as well as its new K Link and K2 orebodies, the Kencana mine in Indonesi

    Mar 21, 2011

  • AUSIMM
    KEYNOTE: Back to the Future – Still on the Dark Side

    By P D. Munro

    "This is a reprise of the paper ‘Back to the Future – Why Change Doesn’t Necessarily Mean Progress’ presented to the Tenth Mill Operators’ Conference in 2009. It was observed that the ‘boom and

    Oct 10, 2016

  • AUSIMM
    Mine Real-Time Personal Respirable Dust and Diesel Particulate Matter Monitoring

    By H W. Wu, T Harvey

    An overview is given of two new developments in mine atmospheric monitoring. A new personal dust monitor (PDM) that gives real-time respirable dust readings is discussed. The unit is mounted within th

    Jan 1, 2008

  • AUSIMM
    Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based Simulators

    By P Wood, S Leveritt

    This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy

    Sep 18, 2012

  • AUSIMM
    Metal Prices and the Differences between Forward and Consensus Pricing – Which One is Better for Use in a Discounted Cash Flow Model?

    By L A. Martinez Tipe, J McKibben, S Barry

    "Metal prices are central to a mineral investment decision and have a profound impact on the financial performance of companies in the mining industry. At its most basic level, metal prices are influe

    Mar 8, 2016

  • AUSIMM
    Precast Concrete Segmental Tunnel Linings – The State-of-the-art

    By A Harding, M Chappell

    Precast concrete segmental linings have enjoyed widespread use around the world, and are the lining type of choice for tunnels constructed using a shielded tunnel boring machine. However, there is sig

    Sep 17, 2014

  • AUSIMM
    Thirty years since Moura No.2 – so what has changed?

    By D I. Cliff

    The loss of 11 miners in the 7 August 1994 Moura No.2 Underground Mine Disaster was the catalyst for major change in the way safety was managed in the Australian Mining Industry. The impact was felt a

    Apr 16, 2024

  • AUSIMM
    æCommunity Collaboration is Good Business' (Good for Communities and Good for the Industries Working Within Them)

    By S M. Stewart

    Industry, especially extractive industry, must now give serious attention to the impact its operations have on the natural environment and on the economic, social, and cultural context within which it

    Jan 1, 2007

  • AUSIMM
    University research on molten slags, matte, speiss and metal systems for high temperature processing – challenges, opportunities and solutions

    By E Jak, P Hayes, J Chen, M Shevchenko, E Nekhoroshev, D Shishin

    Recent decades have seen significant advancements in analytical and experimental techniques, thermodynamic theory, and computational capabilities in high temperature research which are particularly ti

    Jun 19, 2024

  • AUSIMM
    Northparkes Mines’ Current Air Blast Risk Assessment Practices for Block Caving Operations

    By C Vejrazka

    Northparkes is located 27 km north of the township of Parkes in central New South Wales, Australia. The operations consist of underground block cave mines and an ore processing plant that produces hig

    May 9, 2016

  • AUSIMM
    Past Achievements and Future Challenges in the Underground Coal Sector

    By B Robertson

    Over the 40 years that the author has been engaged in the Australian underground coal mining industry, there has been a continuous improvement in safety performance as the sector has grown in size and

    Jul 1, 2013

  • AUSIMM
    Safety is all around – state-of-the-art underground mining safety with Mobilaris Mining Intelligence

    By A Prill

    Safety First and zero accidents are the targets most mines in Australia are aiming for, but manual processes and procedures limit the capabilities and response time in emergency situations. Even with

    May 5, 2022

  • AUSIMM
    Proneness of competent over-stressed intact rock to violent fracturing

    By B L. Sainsbury, M F. Lee, A Penney

    For most practical rock engineering purposes, stress versus strength conditions around underground openings for which rock masses fail and their various modes of failure, are reasonably well-understoo

    Nov 30, 2018

  • AUSIMM
    Is a 2.5áper cent Success Rate Good Enough? Traditional Mine Development Methods have the Tail Wagging the Dog

    By J Jackson, D C. Curry, A C. Keith

    Australian Bureau of Statistics (ABS) data shows that since 2006 the balance of capital costs associated with mine development has become weighted greater than 75 per cent to enabling infrastructure a

    Sep 29, 2013

  • AUSIMM
    Inadequate Water Management Planning Resulting in Long-term Closure Liabilities

    By H J. J Boshoff

    Mine closure planning integrated into life-of-mine (LOM) planning during the operational phase consists of many subcategories. One of these subcategories that needs to be fully integrated into the LOM

    Jul 16, 2014