Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Open Stoping with Associated Caving at Mount LyellUnderground mining of the ore below the West Lyell open cut commenced in 1972 with the 10 Series stopes above rail haulage level. The third lift of stoping (30 Series) com- menced this year, and acce
Jan 1, 1982
-
Explosive Energy Relief - The Key to Controlling OverbreakOne of primary causes of poor blast performance is the improper relief of explosive energy. Under or over-confined blasts modify the explosiveÆs path of least resistance, which changes where and when
Jan 1, 1999
-
The Role of Fine Carbon in Dirty CIP CircuitsLaboratory scale simulation experiments show that the adsorption capacity of Au(CN)Z- on activated carbon in the presence of organic plant contaminants is dependent on the particle size of the carbo
Jan 1, 1991
-
Basic Economic Issues in the Disposal, Allocation, Pricing and Management of Crown Mineral ResourcesThe paper will review the fundamental policy issues and options that have been considered in the determination of the proposed allocation and pricing (ie royalty) regime for minerals under the Crown M
Jan 1, 1993
-
Project Development: The Lump Sum AlternativeWith the recent collapse in commodity prices the size and number of resources project has diminished markedly in recent years. Coupled with the disappearance of the "open cheque book approach", th
Jan 1, 1986
-
Lessons from Manufacturing-Integrating Mining and Milling for a Complex OrebodyBy Tucker G, Clark A, Young M. F, Johnston M
Mount Isa Mines has made a huge commitment to process control in milling. Yet in lead zinc we still failed to achieve a steady operation. Comparisons with manufacturing plants showed the key differe
Jan 1, 1998
-
Applied Mineralogy in the Evaluation and Processing of Australian Iron OresAustralia contains a variety of iron ores, differing in grade, chemistry, size distribution and genesis. While a proportion of this ore is used world-wide as blast furnace lump, much of the material
Jan 1, 1989
-
The High Productive Operation of a Small Blast FurnaceBy Fukui M
An increase in pig iron output by 50 per cent was aimed at after re-lining No.2 blast furnace of NAKAYAMA STEEL WORKS. This had to be achieved by increasing both the furnace volume (from 673 to 757
Jan 1, 1980
-
The Evolution of Stope Backfill at Olympic Dam OperationsBackfil ling of excavated Sub Level Open Stopes has been underway since March 1989 and as at December 1992 some 1 100 000 cubic metres of Cemented Aggregate Fill have been placed. During these three y
Jan 1, 1993
-
Effect of High Horizontal Stresses on the Stability of a Coal Mine RoadwayBy Hematian J
A high horizontal stress field has significant effect on the stability of underground roadways and influences the design of a support system in this environment. The high horizontal stresses at E1lalo
Jan 1, 1995
-
The Nena high sulphidation copper-gold system, Frieda River Complex, Papua New GuineaBy Corbett GJ, Leach TM
The Nena Cu-Au high sulphidation deposit has formed within the Frieda River Intrusive Complex in association with a major dilatant structure. Multiple intermediate intrusives of Miocene age are locali
Jan 1, 1994
-
The Approach to SamplingAspects of sampling are becoming more complex, involving a correct statistical approach to collection as well as geological and possibly pedological control. Advanced chemical techniques and techni
Jan 1, 1976
-
The Activity of Zinc and Lead Oxides in Lead Blast Furnace SlagsBy Denholm W. T, Rankin W. J
The reduction of zinc from lead blast furnace slags using hydrogen was studied at 1300¦C as part of a laboratory investigation of zinc fuming. To perform the experiments, 300 g "spent slag" was mel
Jan 1, 1989
-
The Kanowna Belle Project Progress Towards the Underground MineThe Kanowna Belle deposit was discovered in 1990 following encouraging assays from soil sampling and RAB drilling. At the end of September 1993, diamond drilling had been completed to a vertical dept
Jan 1, 1990
-
The selection, commissioning, and evaluation of a large diameter, variable speed ball mill at Bougainville Copper LimitedBy Clark G
The latest addition to the grinding circuit at Bougainville Copper Limited is another 5.5m by 7.3m primary mill (No.13). The mill can operate in a primary or secondary mode. Its distinguishing fea
Jan 1, 1986
-
Evaluation and Operation of Off-Highway Truck Tyres at the Mount Morgan Limited Open CutTyre cost at Mount Morgan Limited had been 24% of the truck operating cost. Comprehensive tyre testing resulted in a reduction in tyre costs of about one third. A record of the evaluation techniques
Jan 1, 1974
-
From Concept to Reality ù Process Water Treatment at the ERA Ranger MineBy D Jones
The development, piloting and engineering design of an innovative water treatment system for process water produced by a uranium mine mill are described. The process incorporates lime/carbonate soften
Jan 1, 2003
-
A review of the geology and mineralisation of the Kainantu area, Papua New GiuneaBy Nekitel S, Arumba J, Kopi G, Findlay RH
The Kainantu area lies within the composite Scrapland terrane which is composed of Mesozoic metamorphic and intrusive units, overlain by Cenozoic marine sediments, volcanic and intrus-ive units and Qu
Jan 1, 1994
-
Stratigraphy of the Western Channel Iron Deposits of the BHP Billiton Iron Ore Marillana Creek Operations, Western AustraliaBy A Whaanga, A Doecke
The internal stratigraphy of the Marillana Creek palaeochannel Tertiary channel iron deposits (CID) in the Hamersley Province of Western Australia was initially defined in the 1980s and redefined as t
Jan 1, 2007
-
Assessment of main factors contributing to the height of fracturing above longwall panels – a review and case-based numerical studyBy M W. Chen, I Canbulat, S Saydam, C G. Zhang
The height of fracturing (HoF) measures the propagation distance of continuous fracturing from the mining horizon and is also termed the height of cracking (Hebblewhite, 2020; Khanal et al, 2019) or h
Nov 29, 2022