Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Construction and Commissioning of the Lebong Tandai Gold Mine and Treatment Plant

    By West RF, Pooley RH

    An underground mine, a treatment plant and supporting facilities have been constructed at Lebong Tandai in Sumatra, Indonesia by PT Lusang Mining. Throughput is initially 50,000 tonnes per annum

    Jan 1, 1986

  • AUSIMM
    Characterisation of Portland Cement Blended with Pitchstone Fines Aiding Carbon Dioxide Emission Reduction

    By P Joyce, A S. Ray, P S. Thomas, J Haggman

    Climate change and global warming present a significant challenge as unsustainable levels of greenhouse gas emissions arising from human activities continue to be emitted. The cement industry is respo

    Jan 1, 2008

  • AUSIMM
    The Impact of Raiseboring on a Major Mining Operation

    The capabilities of the three 61R and one 81R Robbins Raiseborers currently in use at Mount Isa are defined. Their applications in the development of ventilation and hoisting shafts, orepasses, esc

    Jan 1, 1974

  • AUSIMM
    Petrographic Image Analysis and its Application to Economic Geology

    By Cousens DR, Benhamou M, French DH

    Techniques appropriate to petrographic image analysis are being developed using digitized backscatter electron images of well characterized mineral assemblages obtained from a Cameca scanning elect

    Jan 1, 1989

  • AUSIMM
    Control of the Flotation Rate of Carbonaceous Material in Mt. Isa Chalcopyrite Ore

    By Fewings JH

    When the mining and milling of 1100 Copper Orebody commenced, difficulties were experienced in producing a satisfactory grade of copper concentrate. The major concentrate contaminants were fine pyrit

    Jan 1, 1970

  • AUSIMM
    Model Tests on the Rupture Characteristics of Circular Lining Embedded in Soft Ground

    By Zhansen P

    This paper describes the test re- sults which give a complete proccess of failure of concrete lining embedded in sand medium under load, including the order of appearance of crack along the lining

    Jan 1, 1987

  • AUSIMM
    Discovery of the Hamersley Iron Deposits (Duck Creek - Mt.Pyrton - Mt. Turner Area)

    By Burks WG, Hughes FE, Muceniekas E, Whitcher IG

    The area containing the iron field, recognised by the writers, is part of an uplifted, portion of the 'Western Australian Plateau,' ranging in elevation from about 1,000 feet to about 30

    Jan 1, 1964

  • AUSIMM
    Coal - Paper No. 7 Permian Sedimentation In The Newcastle Coalfield, N.S.W.

    By Johnson M. W

    Factual data about the sedimentation in the Newcastle Coal. Measures are presented. Data concerning the total coal measure sequence (isopachs, sand /shale ratio and total coal thickness variation),

    Jan 1, 1969

  • AUSIMM
    Mining and Environmental Noise - Preventing Problems Professionally

    As an environmental "pollutant", noise is different. For one thing, it is localised (as opposed to transfrontier) and, for another, relatively low levels can trigger very strong human reaction. Th

    Jan 1, 1987

  • AUSIMM
    Mineral Investment-Resource Management and Policy Setting

    It is a privilege for me to participate in this vitally important discussion of The Role of Governments in the Management of Resources. The distinction of my fellow participants is evidence that t

    Jan 1, 1978

  • AUSIMM
    Classification of Mine-Related Subsidence East of the Mississippi River, U.S.A.

    Field investigation of surface subsidence events associated with both active and abandoned underground coal mines in the United States has established criteria that enable the prediction and class

    Jan 1, 1992

  • AUSIMM
    Current Drilling and Blasting Practice in the 1100 Orebody-Mount Isa

    Mount Isa Mines Ltd. annually extracts 5.6 million tonnes of copper ore from the 1100 Orebody. All production is by longhole open stoping, with an increasing emphasis on pillar recovery. Drilling an

    Jan 1, 1988

  • AUSIMM
    Notes on Mine Surveying at Mount Isa

    In order to maintain an accurate survey underground, it is first necessary to connect all shafts used for the transferring of the survey to the levels below by a precise surface survey.This has been a

    Jan 1, 1953

  • AUSIMM
    Thermoelectric Power Measurements of Particulate Chalcopyrite Samples from the Mt Isa Mine

    By Kobayashi M

    Particulate chalcopyrite samples (78 ~ 98 mole per cent chalcopyrite, screen size fraction from 710 to 250 µm) were prepared by crushing and sieving lump ore samples from 12 locations in the Mt I

    Jan 1, 1990

  • AUSIMM
    The Effect of Resin Thickness on Bolt-Grout-Concrete Interaction in Shear

    By M S. N Hadi, J Hossein

    Numerical modelling is extensively used in civil and mining engineering applications because of cost and risk problems associated with different experimental studies. In this study, the effect of resi

    Jan 1, 2005

  • AUSIMM
    The Use Of Bucketwheel Machines In Stockpiling And Recovery Systems

    The .subject of this paper is to briefly outline various methods of stockpiling and reclaiming, and the use of different types of bucketwheel re- claimers and stackers in these operations. The pap

    Jan 1, 1973

  • AUSIMM
    Financial Reports from the Perspective of Shareholders, Creditors, Government Agencies and Auditors.

    By Blom W. M

    Shareholders, creditors, government agencies and auditors all have a different perspective of financial reports which is determined by the uses to which they put the information disclosed in the repor

    Jan 1, 1990

  • AUSIMM
    Derivation Of Reserves And The Optimal Exploitation Of Resources At Hamersley

    The mineral resources of Hamersley Iron are structurally complex with fluctuations in mineral chemistry. Besides orebody charact- eristics, mineral recovery is also affected by stringent product qu

    Jan 1, 1979

  • AUSIMM
    Lower Levels Project Development at the C.S.A. Mine, Cobar

    By Grant BPM

    The lower levels at the CSA Mine have been developed to mine reserves between theNo.7 level and No.9 level.Work on major excavations for the project began during 1982 with the develop-ment of the crus

    Jan 1, 1985

  • AUSIMM
    Characteristics of Low Sulfidation Gold-Copper Systems in the South-West Pacific

    By G J. Corbett

    Magmatic-related low sulfidation hydrothermal ore systems at plate margins exhibit distinct spatial and temporal zonations which can be used to aid mineral exploration and development. Low sulphidatio

    Jan 1, 1995