Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Exploration of Porphyry Copper Lithocaps

    Lithocaps are potentially voluminous zones of advanced argillic and associated argillic alteration located above the subvolcanic intrusive environment. They constitute exploration objectives for epith

    Jan 1, 1995

  • AUSIMM
    Extractive Metallurgy-A Business Management Perspective

    Plenary SpeechI have given considerable thought about what I might say to such a group of professionals, given that I am not an extractive metallurgist. It was immediately apparent that I would quickl

    Jan 1, 1992

  • AUSIMM
    Developments in Sublevel Open Stoping at Rosebery Mine

    Sublevel open stoping (S.L.O.S.) was introduced at Rosebery in 1972 in the wider ore blocks below 14 level, largely replacing cut and fill methods which had been in use up till that time. During 19

    Jan 1, 1982

  • AUSIMM
    Ore-Dressing Mineralogy in Flowsheet Development and Improvement

    By Stevenson BG

    The relevance of ore-dressing mineralogical investigations to developing and improving metallurgical flow-sheets is discussed and examples are given of the application of such studies to various t

    Jan 1, 1978

  • AUSIMM
    Regulation of Environmental Management

    By Wilson T, Stone M, Mattiazzo R

    The regulation of environmental management in the minerals and petroleum industries has been undergoing considerable change over the past decade. In recent years, there has been a distinct trend towar

    Jan 1, 1993

  • AUSIMM
    Experience with Operating and Controlling and In-Pit Portable Crushing and Conveying System

    Portable crushing at Duval Corporation's Sierrita open pit mine has proven both the economics and operability of large, hardrock, portable systems. In-house expertise was utilized to create a sys

    Jan 1, 1985

  • AUSIMM
    Some Practical Uses of Non-Linear Programming in Mine Planning

    By Beeforth C. G

    The use of Non-Linear Programming to obtain improved schedules of future activity in two specific cases of mining and treatment of minerals is described. The two cases were (i) reclamation of gold,

    Jan 1, 1977

  • AUSIMM
    Iron Ore Quantitative Characterisation Through Reflected Light-Scanning Electron Co-Site Microscopy

    By S Paciornik

    The traditional trading of iron ores is based on chemical specifications and particle size distribution. However, recent characterisation studies, that bring additional information like mineralogical

    Jan 1, 2008

  • AUSIMM
    Fragmentation Monitoring of Production Blasts at MRICA

    By Abrahamsson S, Niklasson B

    In a follow-up of 12 production blasts in a quarry at the Mrica project on Java, tightly spaced porous bands were found to govern fragmentation to the extent that the average fragment size k5o was n

    Jan 1, 1990

  • AUSIMM
    Mine Planning and Grade Control - Goldsworthy

    By Newman H. A

    Goldsworthy Mining Limited is currently mining iron ore at an annual rate of 7 million tons from several small orebodies, each of which exhibit wide variations in iron, phosphorus, silica and alumi

    Jan 1, 1973

  • AUSIMM
    Oil in Australasia

    Eleven years ago I addressed delegates to the Whyalla Meeting of this Institute on the subjects 'Oil in Australia?' -- a title which was followed by a large question mark.My purpose at that

    Jan 1, 1962

  • AUSIMM
    Convergence and Load Measurements in an Underground Mine in Turkiye

    By Yesil MM, Bozdag T

    This paper describes the conver- gence and load measurements carried out in inclined seams at five longwall faces, two of which were supported by hydraulic props and the other three by conventiona

    Jan 1, 1992

  • AUSIMM
    Biohydrometallurgy of Gold: Present-Day Status and Future Prospects

    By Groudeva VI

    The biohydrometallurgy of gold is based on different processes which could be grouped into four main groups (Attia, Litchfield and Vaaler, 1985; Karavaiko et al, 1988; Groudev, 1990): 1. bacterial o

    Jan 1, 1993

  • AUSIMM
    A System Dynamics Approach to Mine Modelling and Cut-Off Grade Management

    By Larsen E. R

    We discuss the concept of optimal cut-off grade policies and their advantages in terms of maximisation of net present value of mining operations. There are indications, however, that such optimal po

    Jan 1, 1995

  • AUSIMM
    Productivity Improvement

    Cordeaux Colliery is more logically sited than the historic escarpment Corrimal Colliery, on the same reserve. At Cordeaux the modernisation of mine plans and equipment and the introduction of high pr

    Jan 1, 1991

  • AUSIMM
    Data Acquisition and Management at Olympic Dam Mine Operations

    The Olympic Dam Mining Operation involves the supply of some 2.2 million tonnes per annum of ore feed for the metallurgical plant. To achieve this approximately 9 km of tunnels are developed per year

    Jan 1, 1992

  • AUSIMM
    Drawpoint Design in Caving and Stoping Mines

    The design of drawpoints in caving and stoping mines has a significant impact on the productivity of the operation. Drawpoints must be designed to provide uniform drawdown and maximum recovery of the

    Jan 1, 2000

  • AUSIMM
    Process Control and Performance Monitoring of Argyle Diamond Mines Heavy Medium Cyclone Separation Plant

    By Hutton W, Jack G. St

    The Argyle Diamond Mines process plant incorporates a high level of computerised process control, and facilitates detailed performance monitoring. The control system was designed to provide a high

    Jan 1, 1987

  • AUSIMM
    Microtunnelling in Australia - 13 Years On

    By J Shooter

    Pezzimenti Laserbore designed, fabricated and commissioned the first microtunnelling machine in Australia in 1986. The System was initially a very basic one, developed in isolation to the overseas exp

    Jan 1, 1999

  • AUSIMM
    Current Drilling Practice at Isa Mine

    By Stevens P

    The Isa Mine of Mount Isa Mines Limited currently produces 5.4 million tonnes of copper ore and 3.3 million tonnes of silver, lead and zinc ore annually. Of this, 5.1 million tonnes of copper ore

    Jan 1, 1982