Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The development of DRI pellets for green steelmaking

    By C R. Ure

    To substantially reduce, if not eliminate, carbon dioxide (CO₂) emissions from ironmaking it is necessary to convert from blast furnace (BF) ironmaking using coking coal as the reductant to direct r

    Sep 18, 2023

  • AUSIMM
    Structural Analysis of Acoustic Televiewer Logs for Large Diameter Raise Bored Shafts

    By R M. Stephenson

    Large diameter raise boring is a common raise excavation method in the Australian mining industry. Geotechnical investigations were conducted on several large diameter raise bore projects at Gwalia Mi

    Mar 24, 2014

  • AUSIMM
    Underground Space and Urban Planning in Australia - Are They Compatible?

    This paper discusses the potential role of underground space and tunnelling in urban planning in Australia. The paper gives examples of the infrastructure and commercial applications of underground sp

    Jan 1, 1999

  • AUSIMM
    Discrete Fracture Network Modelling for Tunnel Design in the Sydney Basin

    By A L. de Ambrosis, F M. Weir, M Fowler

    Traditional kinematic and statistical analyses of geological structure for geotechnical engineering applications, while considered industry standard practice, have some limitations and unrealistic ass

    Sep 17, 2014

  • AUSIMM
    Remote Mining in the Canadian Arctic - The Falconbridge Limited Raglan Experience

    In February 1995, Falconbridge Limited approved the construction of a nickel mining and milling facility on its Raglan property situated in the Nunavik region of northern Quebec, Canada. The construct

    Jan 1, 1998

  • AUSIMM
    Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushers

    By J V. Mehrabani, A R. Sayadi

    Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul

    Sep 26, 2011

  • AUSIMM
    The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisation

    By X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones

    Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla

    Jun 22, 2022

  • AUSIMM
    Development and permitting of an underground mine at Cowal Gold Operations

    By J Northfield, L Neesham

    The GRE46 Underground Project lies beneath the environmentally unique and culturally endowed shore of Lake Cowal. The ore body is open both along strike and at depth and is currently defined to a stri

    Mar 15, 2021

  • AUSIMM
    Optimum Blasting? Is it Minimum Cost Per Broken Rock or Maximum Value Per Broken Rock?

    In most mining operations the ore undergoes several processes such as drilling, blasting, loading, hauling, crushing, grinding and liberation to become the final salable product. Drilling and blasting

    Jan 1, 2001

  • AUSIMM
    Non-Destructive Analysis of Diamond Core for Light Elements using Niton Field Portable X-ray Fluorescence

    By P Martin, A Somarin, S Bailey

    Field-based research was conducted to investigate the performance of field portable X-ray fluorescence (FPXRF) in the analysis of reverse circulation (RC) drill chips in iron ore exploration. For year

    Aug 12, 2013

  • AUSIMM
    A Case History of the Crusher Level Development at Henderson

    By W D. Rech, K W. Keskimaki

    As an integral part of the conversion from rail haulage to conveyor haulage at Henderson, over six kilometres of drifting and several large complex openings were mined. The deepest of these areas was

    Jan 1, 2000

  • AUSIMM
    Social Factors That Are Essential for a New Type of Engineer

    Professional engineers of today require a wide array of experience and knowledge. It is true that commonly engineering degrees do teach the technical requirements well, but do fall short in the way of

    Jan 1, 2004

  • AUSIMM
    Utilisation of energy sources other than coke in the sintering process

    By T Higuchi, K Fukada, K Takehara, Y Iwami, S Fujiwara

    Following the Paris Agreement adopted in 2015 and the SDGs, reduction of CO2 emissions has been taken up as an issue worldwide, and the steel industry, which has a particularly large emission, is requ

    Nov 8, 2021

  • AUSIMM
    Grade engineering at Gramalote gold deposit, Colombia: an example of industry – research collaboration, Part 1

    By N Clarke, J Hunt, A Barros, L Keeney

    The Gramalote orebody is a large low-grade gold deposit situated in the San Roque municipality, 124 km north-east of Medellin in Antioquia, Colombia. It is jointly owned by AngloGold Ashanti (AGA) and

    Nov 10, 2020

  • AUSIMM
    Development and Application of a Holistic Quantitative Deterministic Technique for Risk Modelling (Quadrim) in Mine Valuation

    In this paper a quantitative deterministic risk modelling approach (Quadrim) is introduced. The mathematical framework and equations for quantifying uncertainty within and aggregating across value cha

    Sep 26, 2011

  • AUSIMM
    Improved Grade Control using Reverse Circulation Drilling at Mogalakwena Platinum Mine, South Africa

    By G Kirk

    Definition and delineation of in-pit ore and waste material are the most significant tasks for an open pit production geologist; adding or destroying value in the mining value chain. Anglo American’s

    Aug 22, 2011

  • AUSIMM
    Unconventional Use of the Subsurface, Illustrated by Examples from the Nordic Countries

    In the hard rocks of the Nordic countries of Norway, Sweden and Finland underground works have a long tradition. Today the subsurface has been taken into use for a wide variety of purposes. In thi

    Jan 1, 1987

  • AUSIMM
    A Cost Benefit Analysis to Explore the Optimal Number of Blast Movement Monitoring Locations

    By J Loeb, D Thornton

    Blast movement measurement is a key component of grade control, enabling mines to carry all of the precision involved in locating ore blocks, through a chaotic blast, to production. A monitoring syste

    Aug 18, 2014

  • AUSIMM
    Selection of an Optimum Truck and Shovel Fleet Based on Effective Flat Haul and Capacity Constraint Modelling

    By P Hagan, S Campbell

    A study was undertaken using various methodologies to determine the optimum loading and hauling configuration for different haul routes at Callide Mine, a coal mine located in central Queensland. The

    Sep 18, 2012

  • AUSIMM
    What Project Managers must Demand from an Economic Evaluation!

    By P Card

    Some project managers accept unsatisfactory economic evaluation modelling because they are unaware of what constitutes good practice. They tend to leave it to the evaluation specialist or others to de

    May 24, 2012