Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Feasibility Studies, EPCM and the Environment ù Case Studies in Integrated Mine DevelopmentBy R Aseervatham
The fast tracked mine development strategy attempts to blend feasibility studies and engineering/commissioning functions into a streamlined process. In this compressed process, environmental issues ar
Jan 1, 1999
-
New Competencies in Mining ù Rio TintoÆs ExperienceIn the mid-1990s, after a long period of antipathy between the company and its detractors, Rio Tinto embarked upon an ambitious cultural change program that sought to transform the fundamental basis o
Jan 1, 2002
-
Integrated Management in the Mining IndustryIf you are to be and remain competitive in the mining industry, it is vital that your company management systems are efficient. An integral part of today's competition in a ruthless market is to
Jan 1, 1997
-
Development of an Aquatic Habitat and Water Resource in Closing Out the Enterprise PitBy Fawcett M
Pine Creek Goldfields Limited (PCG) is rehabilitating the Enterprise Pit to an aquatic habitat and potential water resource. This paper discusses the development and implementation of that plan. Pin
Jan 1, 1994
-
The New Office and Changehouse Building at the Zinc Corporation Limited, Broken Hill, N.S.W.The object of this paper is to give a description of the new office and changehouse building and equipment at the Zinc Corporation Limited, the office section of which has now been in full use for app
Jan 1, 1941
-
In-Line Pressure Jig Preconcentration Plant at the Pirquitas MineBy A H. Gray
Gekko Systems Pty Ltd engaged in the test work, design, manufacturing and commissioning of the pre-concentration plant at Silver Standard Resources Inc’s Pirquitas mine in the north western Jujuy prov
Aug 8, 2011
-
Design, Commissioning and Operation of Elura's Larox Pressure FiltersBy Jagger ND
Pressure filters were found to be necessary to produce Elura silver/lead and zinc concentrates at sufficiently low moisture contents for bulk cargo shipment by sea to smelters.The difficulty in obtain
Jan 1, 1985
-
Implementation of Localised Uniform Conditioning for Recoverable Resource Estimation at the Kipoi Copper Project, Democratic Republic of the CongoBy M G. Millad, M Zammit
The Kipoi Central (KPC) copper project is located in the Katanga Province in the Democratic Republic of the Congo and is presented here as an example of an operating mine where the Mineral Resource wa
Aug 18, 2014
-
A practical guide to sampling in coal preparation plantsBy B W. Atkinson, J Docherty
An Australian Working Group has been compiling a guide for operators to use in order to improve the efficacy of their routine and non-routine sampling tasks within their coal preparation process. The
May 9, 2017
-
An Investigation into the Relative Efficiencies of Common Brattice Cloths in use in Australian Coal MinesCommon brattice cloths in use in Australian coal mines are compared by permeability measurements. The respective advantages of twill weave and tarpauling* weave cloths are listed, and the improvements
Jan 1, 1959
-
Gold Deposits in Highly Metamorphosed TerranesBy A G. Tomkins
"Approximately 32 per cent of the worldÆs total gold production has come from greenstone belts (Frimmel, 2008). In these regions numerous small to large, quartz vein-associated gold deposits are hoste
Sep 26, 2013
-
Permitting in the face of uncertainty – how to deliver confidence to regulators and investorsBy R L. Grogan
Mining is currently undergoing a progressive expansion into novel environments (such as the deep ocean), commodities (such as tantalum, rare earths, and other ‘green economy minerals’), and new method
Jul 25, 2018
-
Backfill Technology Development at Xstrata Mount Isa Mines Between 1995 and 2005By L Neindorf
The development and application of paste fill, cement slurry aggregate fill and shotcrete bulkheads at Mount Isa Mines is described. The progressive changes in filling style in the Mount Isa copper mi
Jan 1, 2005
-
Shallow Compressed Air Tunnelling on the Murl ProjectBy Bennet A. G
As part of the construction of the Melbourne Underground Rail Loop it was necessary to construct two 7 metre diameter tunnels, each 100 metres in length, by shield driven excavation through an all
Jan 1, 1981
-
Ore Characterisation for Mine to Mill FragmentationBy A Scott, S Kanchibotla, J Segui
The æMine to MillÆ concept is not new. In fact, it is the underlying objective of every mine. Unfortunately, in many operations the management structure and reporting systems have created independent
Jan 1, 2000
-
Recent Developments in Understanding of and Exploration for Epithermal Deposits in Volcanic ArcsBy J W. Hedenquist
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Epithermal deposits (Au or Ag dominant, ± base metals) form within ~1 km of the surface in
Mar 18, 2015
-
Converter Slag Flotation Practice at Mount Isa Mines LimitedBy Watsford RMS, Schache IS, Slaughter PJ
As part of the overall Copper Smelter expansion activities at Mount Isa Mines from 1970 - 1975, a decision was made to open circuit the converter slag from the Smelter and treat this product by flo
Jan 1, 1978
-
Surface-to-inseam (SIS) Drilling at Oaky Creek Coal Mine – SIS Design Aspects and Drilling EnvironmentBy E Corpuz, J Weissman, S Winter, R Evans
The surface-to-inseam (SIS) directional drilling technique has been utilised at Oaky Creek Coal for more than a decade to predrain both the Oaky No 1 and Oaky North mining areas. The cumulative drilli
Aug 31, 2015
-
Harnessing data complexity – how machine learning applies all project data for accurate resource modellingBy S Sullivan
A recent review of resource reports lodged to statutory bodies found geological models with oversmoothed or unrealistic lithological boundaries, many of which do not represent geological appearance in
Mar 22, 2022
-
Re-Opening the Bullendale MineAurum Reef Resources is a provincially owned unlisted public company which holds a number of prospecting licences over Otago hard rock historically active minesites. The Bullendale Licence 31 1845 was
Jan 1, 1992