Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Ventilation and Refrigeration Design for the Access and Ore Production Decline to the Deep Copper Orebody at the Mount Isa Mine

    By Nixon C. A

    The exploration of Mount Isa Mines' new copper source will require the development of a five kilometre 4.7 x 5.5 metre blind decline commencing 1000m below the surface and extending to 1600m

    Jan 1, 1988

  • AUSIMM
    Flotation control using froth stability: past, present and future

    By C Smith, J Cilliers, K Hadler

    Unstable flotation froths, that burst before they overflow, produce no concentrate. Increasing the froth stability to improve recovery is therefore an obvious control strategy. Froth stability can be

    Aug 29, 2018

  • AUSIMM
    29th Annual Conference 1996 - Field Notes

    Greymouth River Dredge û Birchfield Minerals Ltd Blackwater Gold Mine û Macraes Mining Company Ltd Globe Progress Gold Mine û Macraes Mining Company Ltd

    Jan 1, 1996

  • AUSIMM
    Implementing condition-based wear surface management

    By P Velletri, N Gaylard

    The management of wear surfaces in mining operations has remained largely unchanged since the inception of mining. Sacrificial wear liners are installed on the inside of chutes, hoppers and other equi

    Nov 8, 2021

  • AUSIMM
    Physicochemical properties of steelmaking slags for the mitigation of CO2 emissions in steel sector

    By J H. Heo, J H. Park, M J. Lee

    In this paper, the challenging points regarding the high temperature physical chemistry of slags to achieve the improved and stable electric arc furnace (EAF) or electric smelting furnace (ESF) techno

    Jun 19, 2024

  • AUSIMM
    The Application of Value Engineering Principles to Mining Studies

    By T Schrimpf, I Bryan

    The life cycle of a mining project begins with initial regional exploration and ends with mine closure and rehabilitation. Between resource definition and the commencement of mine construction is the

    May 24, 2012

  • AUSIMM
    Recent Developments and Trends in Backfill in Canada

    By J Nantel

    Planning of modern mines entails considerable challenges in the areas of ground control, materials handling, safety, environment, equipment and personnel. Many orebodies are not economical unless e

    Jan 1, 1998

  • AUSIMM
    The Preparation of Sections of Copper-Lead Alloys For Metallographic Examination

    In the course of work being carried out in the Lubricants and Bearings Section of the Council lor Scientific and Industrial Research on the production of copper4ead 'bearings for 'use in air

    Jan 1, 1944

  • AUSIMM
    Phytostabilisation and Phytomining – Principles and Successes

    By R L. Chaney, M Mahoney

    Mine and ore beneficiation wastes and smelter contaminated soils often cause phytotoxicity and threaten adverse environmental effects if not remediated. Science has clarified both the risks from soil

    Jul 16, 2014

  • AUSIMM
    Predictive Maintenance Using Simulation and Machine Learning

    By R Marchant, D Willingham

    "Predictive maintenance (also known as PHM or equipment ‘health monitoring’) refers to the intelligent monitoring of equipment to avoid future equipment failures. In contrast to conventional preventiv

    Oct 10, 2016

  • AUSIMM
    Paper No. 196. The Water Flume Conveyors of The Mount Lyell Mining And Railway Company Limited.

    THE power requirements of the Mount Lyell Mining and Railway Company at Queenstown, Tasmania, have, since the inception of smelting operations in June, 1,,896, been derived continuously from the exten

    Jan 1, 1911

  • AUSIMM
    Geotechnical assessment for the waste rock backfilling of the decommissioned Rum Jungle Open Cut Pit

    By J Hartnett, B Tarrant, A Rayner, D O’Toole, P Davies

    Since 2009, the Northern Territory and Australian governments have been working under a national partnership arrangement to inform a rehabilitation plan for the former Rum Jungle uranium mine. Part of

    Jul 1, 2021

  • AUSIMM
    A fundamental investigation on welding flux tunability geared towards high heat input submerged arc welding for shipbuilding applications

    By H Yuan, H Tian, Y Zhang, Z Wang, C Wang

    Submerged arc welding (SAW) is one of the significant metal-joining processes for manufacturing marine vessels, steel pipes, and offshore structures with high deposition rate and engineering reliabili

    Aug 21, 2024

  • AUSIMM
    Waterview Connection – Temporary Works for Tunnel Boring Machine?Launching

    By D Kubik, K The

    The New Zealand (NZ) Transport Agency’s Waterview Connection will complete Auckland’s Western Ring Route, a 47 km north–south motorway alternative to Stage Highway 1. The project is being delivered by

    Sep 17, 2014

  • AUSIMM
    Geopolymer Concrete for a Sustainable Future

    By S E. Wallah, D Hardjito, B V. Ran

    The manufacture of Ordinary Portland Cement (OPC) is not only energy-intensive but also releases a significant volume of carbon dioxide (CO2) to the atmosphere. In addition, OPC in concrete often caus

    Jan 1, 2004

  • AUSIMM
    Genesis of the Large-sized Fozichong Lead-zinc Polymetallic Deposit, Guangxi, South China – Constraints from the Sulfide Mineralogy, Fluid Inclusions and Isotope Geochemistry

    By H Q. Zhang, M C Chai, W Fu, H Y Chen, L M. Wei, Q J. Yang

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Fozichong deposit – located in the south-western segment of the giant Qinhang metalloge

    Mar 18, 2015

  • AUSIMM
    Carrapateena project to date – Geotechnical risks and management

    By G Balog, T Ormerod, D Cox

    This paper discusses the methods utilised by the technical team to identify and quantify the SLC risk factors, the modifications to mine design and scheduling, and the changes to the planned risk mana

    Mar 15, 2021

  • AUSIMM
    Training our New Starters – Between a Rock and a Hard Place

    By M Davis

    Increasing growth in the minerals industry over the past decade has raised the question of whether the standard of training for new geologists has been negatively impacted. This hypothesis was tested

    Aug 22, 2011

  • AUSIMM
    Project Evaluation Due Diligence--Lessons from the Busang Saga

    The general principles of technical due diligence best practice that are involved in assessing a mineral property in the early stages of its development are described and a bibliography of relevant pa

    Jan 1, 1997

  • AUSIMM
    A Computer Model for Vacuum Filter Operatin

    Mathematical modelling of continuous rotary vacuum filtration has been limited by the wide range of variables and the absence of connecting equations linking the variables. The filter type and size

    Jan 1, 1989