Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Assessing Contaminant Risk Associated with the use of Mine Water for Dust Suppression

    By C Gimber

    Dust suppression is an important environmental control in most mining operations. The poorest quality water within a mine site is often used for dust suppression since it provides an effective means o

    Nov 26, 2013

  • AUSIMM
    Findings from preliminary testing to determine alternative sources of ethylene within sealed areas of underground coalmines

    By E Westthorp, J Phillips

    The detection of ethylene in mined-out ‘goaf’ areas of underground coalmines is an industry standard indicator of accelerated oxidation where the coal temperature has exceeded 100°C. If uncontrol

    Aug 28, 2017

  • AUSIMM
    Water treatment in perpetuity – or not?

    By R J. Higgins, M Edraki

    What is the meaning of the Life of a Mine (LOM) if that mine results in a requirement for water treatment in perpetuity? ‘In perpetuity’ is of course a duration with no relationship to a Life-of-Mine

    Jul 25, 2018

  • AUSIMM
    The Application of Table Flotation to the Removal of Arsenopyrite from Galena Concentrates and Silica from Lime Sands

    This paper deals with the application of table flotation to two unusual mineral dressing problems. Both problems involved the removal of interfering minerals at sizes too coarse to normal froth flotat

    Jan 1, 1954

  • AUSIMM
    In-Pit Crushing and Conveying (IPCC) - An Economic Alternative to Trucks that Delivers on Safety and the Environment

    If the industry keeps doing what it has always done, it will continue to get what it has always got - rising operating costs. Why is this so? Generally grades being chased are becoming lower, strippin

    Jun 1, 2010

  • AUSIMM
    Why the Mining Industry is Critical to Sustainable Development ù Greenhouse Gas Emissions Policy, a Case Study

    Mining epitomises the challenge of sustainable development, because few sectors have such a direct impact on the natural environment, yet few are more important to the economic and social health of al

    Jan 1, 2006

  • AUSIMM
    Evaluation of Cyclical Voltammetry as an Electrolyte Screening Technique

    By Grady B. V O, Cavell K. J, Ault A. R, Newman O. M G, Malcolm J. McPhersqn

    Cyclic voltammetry (CV) has been evaluated as a technique for monitoring the quality of an industrial zinc sulphate electrolyte. The basis of the method involves measuring a change in the polarisati

    Jan 1, 1993

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: I. Mining Considerations

    During the last 12 years the dominant theme at Mount Isa has been production expansion. Production rate of 3,200 tons per mine day in 1953 increased to 11,000 tons per mine day in 1960, completing the

    Jan 1, 1967

  • AUSIMM
    Blast Monitoring and Blast Translation – Case Study of a Grade Improvement Project at the Fimiston Pit, Kalgoorlie, Western Australia

    By M Fitzgerald

    Fimiston Open Pit is operated by Kalgoorlie Consolidated Gold Mines (KCGM) as a joint venture between Barrick Gold and Newmont Mining. Over 110 years of underground mining resulted in the development

    Aug 22, 2011

  • AUSIMM
    Bored Reinforced Piles for Raise Bore Support – Four Case Studies and Guidelines Developed from Lessons Learnt

    By P Marlow

    Raiseboring is an attractive method of constructing shafts, being safe, fast and comparatively cheap. But this means back-reaming through weathered ground. However in the gravels and weathered near-su

    Mar 21, 2011

  • AUSIMM
    Thermodynamics of Non-Cyanide Gold Solvents

    Thermodynamics of Non-Cyanide Gold Solvents The present status of the raw material base in the gold industry requires specific ways to recover gold and silver from ores. Most gold is closely associat

    Sep 13, 2010

  • AUSIMM
    Automated Mineralogy for Ore Characterisation and Plant Optimisation

    By Y Gu, R Fandrich

    Traditionally, characterisation of the mineralogy and textures of ore and rock samples were based on observations of hand specimens and thin sections using an optical microscope. The extent of the dat

    Jan 1, 2007

  • AUSIMM
    Climbing Back from the Brink - How NZ can and is Moving Back to Mining Education and Training

    This paper briefly reviews the demise of professional mining education and training in NZ over the past ten years; compares it with the Australian experience; and discusses the immense success experie

    Jan 1, 2001

  • AUSIMM
    Pacific Highway Upgrade from Tintenbar to Ewingsdale (T2E), St Helena Tunnel

    By A M. Mueller

    St Helena tunnel is the centrepiece of the Pacific Highway upgrade from Tintenbar to Ewingsdale, abbreviated and commonly known as T2E. At the deepest point the twin tunnels run 45 m below the ridge l

    Sep 17, 2014

  • AUSIMM
    A Mineralogical Examination of the McArthur Lead-Zinc-Silver Deposit

    The mineralisation consists principally of layered pyrite, phalerite and galena, situated conformably within a sequence of tuffaceous, bituminous shales and dolomitic sediments that include slump brec

    Jan 1, 1968

  • AUSIMM
    Design and Scale-Up Criteria for Column Flotation

    By Mankosa MJ, Yoon R-H

    A reliable scale-up procedure for column flotation must address three important areas of column design, ie column geometry, sparging system and wash water distribution network. The column geometry i

    Jan 1, 1993

  • AUSIMM
    Ventilation Survey Procedures and Database for Use with Computer Simulation Techniques

    By Nixon TR

    The Australian Coal Industry Research Laboratories Ltd. (A.C.I.R.L.) MINVENT computer program can be used to simulate existing and projected colliery ventilation requirements. New collieries can be

    Jan 1, 1983

  • AUSIMM
    Precipitate Flotation for the Removal of Heavy Metals and Cyanide from Metallurgical Effluents

    By CorrOa de Araujo A, Salum MJG

    The treatment of mining and metallurgical liquid effluents is becoming, everyday, a necessity felt by these industries. Physical-chemical and chemical methods for treating such effluents are general

    Jan 1, 1993

  • AUSIMM
    Brisbane Airport Link Project – Design and Construction of the 26 m Span Kedron Caverns: Comparing Monitoring Data with the Design

    By I Coombes, M Trim, Y Sun, M McRae, A Spiegl, H Lagger, A Amon, P Barraclough, M Villeneuve

    The Brisbane Airport Link Project (AirportlinkM7) includes the design and construction of more than 12.5 km of tunnels, with the Kedron interchange including four ramp tunnels that intersect with main

    Sep 17, 2014

  • AUSIMM
    A simple and accurate method for Ore Reserve estimation and Mineral Resource depletion in caving mines

    By A D. Campbell

    Conversion of Mineral Resources to Ore Reserves requires a multidisciplinary approach and application of a number of Modifying Factors. The Modifying Factors for mining, particularly dilution and reco

    Oct 16, 2017