Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Crisis or Opportunity - Strategy and Area Selection Methodology in Developing Countries

    WMC was a late entrant into Indonesia in mid-1996, but had considerable experience and success in exploring in Asia, particularly the Philippines since 1988. Given the geological similarities to the P

    Jan 1, 1999

  • AUSIMM
    Loading of Au(CN)2 - Solution Onto Activated Carbon

    By Linge HG, Klauber C

    The key element in the carbon-in-pulp process for gold processing is the loading of dissolved Au(CN)2 from solution onto activated carbon. The mechanism and kinetics of this step have been examined

    Jan 1, 1989

  • AUSIMM
    Closure of the Golden Cross Mine

    By R MacGillivray

    The Golden Cross mine was an open-pit and underground gold and silver operation from December 1991 to April 1998. Closure of the mine has been based on an approach agreed among stakeholders. The initi

    Jan 1, 2002

  • AUSIMM
    Coal Measure Paleoenvironments and Seam Correlation in the Rapahoe Sector, Greymouth Coalfield

    Drilling in the south of the Rapahoe Sector at Greymouth Coalfield has demonstrated the existence of thick coal seams in the upper Rewanui Member. Seam correlation is handicapped by complex lithostrat

    Jan 1, 1985

  • AUSIMM
    Alliancing: The Project Delivery Method of the Future

    By M Delaney

    Alliancing is a contractual relationship in which organisations with an interest in a project are brought together in an atmosphere of co-operation to produce superior results to benefit all of the pa

    Jan 1, 2000

  • AUSIMM
    A Study of Mine Subsidence at Two Collieries in the Southern Coalfield, New South Wales

    Urban development to the south of Sydney is approaching areas of current and proposed coal mining. Already some structures and residential areas are affected by mining subsidence.Subsidence resulting

    Jan 1, 1980

  • AUSIMM
    A Review of the Mineralogy of Some Low Grade South Australian Iron Ores in Relation to Beneficiation Testing

    Some low grade South Australian iron ores were classified on the basis of their physical characteristics. Ores from Mount Christie and Billeroo are coarse grained mixed ores; Mount Christie ore could

    Jan 1, 1964

  • AUSIMM
    Geomechanical Modelling of the Mount Isa Copper Deposit – Predicting Mineralisation

    By R O’Sullivan, D Taylor, J G. McLellan, B Miller

    The Mount Isa copper deposit is located adjacent to the city of Mount Isa, Queensland, and lies within a series of Palaeoproterozoic to Mesoproterozoic Superbasins. The deposit is hosted almost entire

    Aug 18, 2014

  • AUSIMM
    Developments in Electronic Refining of Copper

    Operation of the tankhouse at the Electro lytic Refining and Smelting Company's works has been improved, but further automation is re- quired to cut the labour intensive nature of the routine t

    Jan 1, 1976

  • AUSIMM
    Mine Sequencing for High Recovery in Western Australian Mines

    By M P. Sandy

    Some Western Australian underground mines are challenged by very high stress gradients. This environment frequently results in poor induced ground conditions and damaging seismic activity. In some cas

    Jan 1, 2003

  • AUSIMM
    Resue or Split Face Firing - Trial Results from Hillgrove Mine

    Resue or split face firing has the potential to separate ore and waste rock into separate muck piles within a stope. Thus split face firing has the potential to reduce dilution of the ore stream to be

    Aug 1, 2010

  • AUSIMM
    Residue Treatment Plant Practice at Risdon, Tasmania

    By Garrigan J. S, Oakes I

    Current operating practice in a plant commissioned some five years ago to treat ferritic zinc plant residue by the "Jarosite" process is described. Major problems overcome include obtaining reliabl

    Jan 1, 1977

  • AUSIMM
    The use of Conditional Simulation for Drill Hole Spacing Evaluation and Decision-Making in Telégrafo Project, Northern Chile

    By O Rojas

    The Telégrafo copper – gold deposit is located in the Centinela district of the Antofagasta region in northern Chile. Telégrafo is a porphyry copper deposit of Eocene – Oligocene age which h

    Aug 22, 2011

  • AUSIMM
    Artisanal and Small-Scale Gold Mining in Papua New Guinea

    By E Y. Baafi

    Artisanal and small-scale gold mining (ASSM) offers lucrative employment opportunities to the locals of most developing countries. The major drawback of ASSM is its adverse impacts on the environment

    Jan 1, 2008

  • AUSIMM
    Backfilling of Caved-in Goafs with Pastes for Disposal of Residues

    By W Schauenburg

    The increasing problems associated with the disposal of waste and the potential for use of by-products as underground filling material is a subject which is relevant not only to the coal-mining indust

    Jan 1, 1998

  • AUSIMM
    The Youga Gold Project - A West African Project Financing Case Study

    The Youga gold mine in Burkina Faso, West Africa, is scheduled to produce first gold in the third quarter of calendar 2007. The project is expected to produce 540 000 oz of gold over 6.5 years, from a

    Jan 1, 2007

  • AUSIMM
    Measurement of Payloads Carried by Mine Haul Trucks and the Influence of Payloads on Production Rates and Material Movement Costs

    By Alexander RB, Hollis AJ

    The magnitude of the payloads carried by mine haul trucks can have a strong influence on the mine production rates and costs. Consequently control of truck payloads is highly desirable, but in man

    Jan 1, 1986

  • AUSIMM
    An Integer Programming Model for Optimisation of a Heavy Media Coal Preparation Plant

    By J Zhou

    This paper discusses the implementation of a mixed integer linear programming model for a coal preparation plant. The plant considered consists of primary and secondary heavy media cyclones, hydrocycl

    Sep 26, 2011

  • AUSIMM
    Three-Chamber Pipe Feeder in Underground Gold Mine Applications

    By Geisler P, Sutherland P

    The technical limits for high-pressure transport of large particle solids by means of sludge pumps, piston pumps or the like lead to the development of the pipe-feeder system. The pipe-feeder is a t

    Jan 1, 1991

  • AUSIMM
    The Structure and Flow Resistance of the Coke-Ore Interface

    By Williams ID

    Ore and coke of various size fractions (1 to 11 mm) were packed in a column (146 ó) and resistance to air flow measured under a range of conditions. Results have shown that layered charging results i

    Jan 1, 1975