Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Pelletising Of Copper Concentrates And Fine Residue Materials For A Copper Blast Furnace

    A programme began in 1970 to eliminate the charging of fine materials into the copper blast furnace of The Electrolytic Refining and Smelting Company of Australia Ltd. at Port Kembla, N.S.W. A disc

    Jan 1, 1974

  • AUSIMM
    The Financing of New Resource-based Projects in the Next Decade

    Depending upon the probability one assigns to project go-ahead, up to $10 billion (1978 figures) could be required for resource based projects in Australia in the next decade. In the past major reso

    Jan 1, 1979

  • AUSIMM
    The Effectiveness of Interpanel Pillars in the Control of Surface Subsidence

    There exist many formulae for designing coal pillars. However, when applied to a given set of mining parameters, they lead to different pillar sizes and factors of safety. From the subsidence poin

    Jan 1, 1992

  • AUSIMM
    Improvements in the Feed Preparation Section of the Whyalla Pellet Plant

    By Fitzpatrick JM

    The feed preparation section of the Whyalla iron ore pellet plant includes a screening and crushing plant followed by dry grinding mills. Improvements in the efficiency of the vibrating screen and

    Jan 1, 1978

  • AUSIMM
    The Role of the Stock Exchanges in Financing Future Mining Projects

    HISTORY Up until the late 1880's the mining industry acquired a considerable proportion of its capital needs from domestic sources. Exchanges were established wherever major new fields were o

    Jan 1, 1975

  • AUSIMM
    Application of the Proton Microprobe to the Partitioning of Platinum Group Elements in Sulphide and Oxide Phases

    By Ryan CG, Ramsden AR, Sie SH, French DH, Griffin WL

    Proton microprobe and electron microprobe analysis are being used in combination for in situ determination of the trace element contents of oxide, sulphide and silicate minerals in a sample of the

    Jan 1, 1989

  • AUSIMM
    Future Trends in the Non-Ferrous Metal Industry of the World

    Between, 1980 and 1984, the demand for non- ferrous metals in the free world grew annually by 1.5 per cent for copper, 0.4 per cent for lead, 1.4 per cent for zinc, and 2.5 per cent for nickel. The

    Jan 1, 1986

  • AUSIMM
    Kinetic Study on the Leaching of Vanadium from LD Converter Slag Using Sulfuric Acid

    Kinetic Study on the Leaching of Vanadium from LD Converter Slag Using Sulfuric Acid In order to reduce the environmental impact due to land disposal of LD (Linz-Donawitz) converter slag from steelma

    Sep 13, 2010

  • AUSIMM
    Flyrock Risk

    The issue of flyrock is critical to the operation of all mineral extraction sites that use blasting. This paper takes a risk-based approach to identifying, analysing and managing the flyrock hazard. T

    Jan 1, 2007

  • AUSIMM
    Evolution of Cenozoic Oil- and Gas-Bearing Sedimentary Basins of Active Continental Margins: Northeastern Asia and Bering Sea

    The sedimentary basins of this region developed in the collision zone of thePacific Ocean plate and the continent. Stresses were transmitted thorough wedge-like lithospheric blocks, such as the Okotsk

    Jan 1, 1995

  • AUSIMM
    The Geomorphology of the Channel Iron Deposit in Bungaroo Valley - The Formation of an Irregular Basal Topography and its Impacts on Resource Recovery

    By L Terrusi

    The Bungaroo Valley hosts a concealed Tertiary channel iron deposit (CID) along a 17 km stretch of its length. Bungaroo Valley is approximately 0.5 km wide upstream at its easternmost extent, and 3.5

    Jan 1, 2007

  • AUSIMM
    Comparison of Diamond Drill Size on Iron Ore Geometallurgical Results

    By T Sua, B Wright

    "BHP Billiton West Australian Iron Ore (WAIO) conducts an extensive geometallurgy program for its iron ore deposits in the Pilbara with the focus on determining the lump yield (the mass percentage of

    Jun 15, 2016

  • AUSIMM
    Analysis of Concentrate Operations at Mount Lyell

    By Weller K. R, Trahar W. J

    The Mount Lyell Company treats some 2.3 million tonnes of ore annually, mined from a number of orebodies on the field. Blended ore is essentially a quartz-sericite schist containing about eight per

    Jan 1, 1977

  • AUSIMM
    Long-Term Changes in Water Chemistry as a Result of Mine Flooding in Closed Mines of the Pittsburgh Coal Basin, USA

    By E Werner, B R. Leavitt

    The chemistry of acidic mine drainage discharging from flooded coal mines is commonly reported to improve with time after flooding. This investigation describes a 18-year dataset of post-flooding wate

    Jan 1, 2003

  • AUSIMM
    Twin Decline Expansion Project for TauTona Mine at 4000 m Below Datum ù Deepening the Deepest Mine in the World

    By J Naude

    The TauTona (Sotho for Great Lion) Mine near Carletonville, which is one of AngloGold AshantiÆs most profitable operations in South Africa, has started a multi-million dollar expansion project that is

    Jan 1, 2005

  • AUSIMM
    Technical Challenges for the Pike River Coal Project in a Remote Mining Environment

    By J McNee

    Pike River Coal Limited (PRCL) is developing the Pike River Coal Mine in the Paparoa Ranges of New ZealandÆs South Island. The mine is being developed to extract a coking coal deposit of the Brunner S

    Jan 1, 2007

  • AUSIMM
    Mine-to-Mill Optimisation ù Research and Practice

    Mining companies around the world are seeking methods to coordinate operations between the mine and the concentrator to achieve an overall improvement in enterprise performance. In several instances v

    Jan 1, 2000

  • AUSIMM
    Production of Zirconia from Zircon Sands

    By Sinha NH

    ICI Australia and CSIRO have developed a novel process for extraction of zirconia from zircon sands. The two stage process involves a high temperature step and a wet chemical processing step. A pilot

    Jan 1, 1986

  • AUSIMM
    Monitoring of Underground Mobile Equipment at Mount Isa Mines Ltd

    By Cook B, Cunningham J

    At Mount Isa Mines, a system has been developed for general monitoring of underground mobile equipment. It can provide unit condition monitoring data such as oil pressures and motor temperatures as

    Jan 1, 1995

  • AUSIMM
    Notes on the New Broken Hill Consolidated Ltd. Service Shaft

    This paper briefly describes the shaft, including sinking, steel sets and their installation, shaft equipment and winders.INTRODUCTIONThe New Broken Hill Consolidated Ltd. Service Shaft is a vertical

    Jan 1, 1957