Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Pilbara Iron Ore Industry ùThe State of Play and Challenges Ahead

    I would like to start by thanking The AusIMM and CSIRO for organising this excellent conference and inviting me to give a keynote address. Today I will focus on some broad observations of our industry

    Jan 1, 2002

  • AUSIMM
    Comparison of Suspect Terranes of the Gympie Province with Other Units of the New England Fold Belt, Eastern Australia

    The Gympie Province is a unique tectono-stratigraphic unit which does not fit into the overall palaeogeographic pattern of the New England Fold Belt (NEFB), and part of it has been proposed as an exot

    Jan 1, 1990

  • AUSIMM
    Research and Tests on Improving the Technology of Enrichment of the Copper-Molybdenum Ore

    Research and Tests on Improving the Technology of Enrichment of the Copper-Molybdenum Ore

    Sep 13, 2010

  • AUSIMM
    Opportunities for the New Zealand Coal Industry (3e552890-650c-4dca-803f-ae5c322a9990)

    Thank you for this opportunity to address your conference on The role of coal in the New Zealand energy market".New Zealand's energy market has, in common with much of New Zealand, undergone majo

    Jan 1, 1990

  • AUSIMM
    Acid Rock Drainage From Highway and Construction Activities in Virginia, USA

    By Z W. Orndorff

    Excavation through sulfidic geologic materials during construction activities has resulted in acid rock drainage (ARD) related problems at numerous (>40) locations across all five geologic regions of

    Jan 1, 2003

  • AUSIMM
    Effect of Anionic Surfactant on Silica Particle Attachment at the Oil-Water Interface

    Effect of Anionic Surfactant on Silica Particle Attachment at the Oil-Water Interface Controlling particle attachment is crucial where powdered solids come into contact with oil and water. Particles

    Sep 13, 2010

  • AUSIMM
    A Stratigraphy and Tectonic Model for the Drummond Basin and its Relationship to Gold Mineralisation

    The Drummond Basin is a large intracratonic basin which developed in central Queensland during Late Devonian to Early Carboniferous times. It is postulated that the Drummond Basin developed as a f

    Jan 1, 1989

  • AUSIMM
    Learning from Nuclear Waste Repository-Design: The Ground-Control Plan

    With mining development on hold and other underground works in a slowdown, the develop- ment of nuclear waste repositories takes center stage on the American rock engineering scene. Three repositor

    Jan 1, 1987

  • AUSIMM
    Modelling Cohesion and Adhesion of Wet, Sticky Iron Ores in Discrete Element Modelling for Material Handling Processes

    By K Williams, T Donohue, W Chen, T Roessler, A Katterfeld

    Wet sticky iron ore poses particular difficulties in every aspect of the material handling process. Material hang-ups in bins, pipes and chutes; carry-back and spillage due to insufficient belt cleani

    Jul 13, 2015

  • AUSIMM
    Reconciliation at the Musselwhite Mine - From Exploration to Production

    The Musselwhite mine, located in northwestern Ontario, Canada, has been an underground narrow-vein gold producer since the spring of 1997. As an exploration project at the feasibility stage, much effo

    Jan 1, 2002

  • AUSIMM
    Fundamental Limits for Recycling - Formulating Environmental Legislation on the Basis of First Principles

    By O Ignatenko, A van Schaik

    Environmental legislation for the process and manufacturing industries is frequently formulated without considering the fundamental limits of physics, chemistry and thermodynamics within process techn

    Jan 1, 2006

  • AUSIMM
    Head-Gear and Electric Winding Plant at the Main Shaft, Mount Morgan, Queensland

    NEARLY all problems in mining engineering involve the transport and distribution of materials from place to place, and in general the most economically managed mines and plants are those in which the

    Jan 1, 1911

  • AUSIMM
    Deterministic Expert Systems : A New Planning Tool for Project Development

    Project developent proceeds by increasingly detailed studies addressing overall project returns through an analysis of the substance, risks and costs associated with the following elements: ò Reserv

    Jan 1, 1989

  • AUSIMM
    Pilbara creek diversions – resilience gained through increased ore recovery and an integrated approach to design

    By M Rafty, A Markham, S Atkinson, M Heyting

    Over recent years there has been a significant increase in the number of miners in the Pilbara region of Western Australia targeting channel iron deposits (CID) located in valleys, intersected by ephe

    Jul 24, 2017

  • AUSIMM
    Purification of Nickel and Cobalt from Heap Leaching Effluents Using Ion Exchange Resins

    Purification of Nickel and Cobalt from Heap Leaching Effluents Using Ion Exchange Resins A comparative study among several chelating resins for purification of a heap leaching effluent from a nickel

    Sep 13, 2010

  • AUSIMM
    Design and Construction of Large Caverns in Granite – Ulu Jelai Hydroelectric Project, Malaysia

    By B Chapman, B Gaida, L Drowley

    The 372 MW Ulu Jelai Hydroelectric Project is a peaking power scheme located in the Cameron Highlands, Malaysia. The main features of the project include an 84 m high roller compacted concrete dam; tw

    Sep 17, 2014

  • AUSIMM
    Structural Geology of the Sovereign Prospect, Lower Waitekauri Valley, Hauraki Goldfield

    By R McConnochie, J V. Rowland, J L. Mauk

    The Sovereign prospect in the lower Waitekauri Valley of the southern Hauraki Goldfield occurs in daciterhyolite flows and volcanic breccias of the Waipupu Formation. The lower Waitekauri Valley conta

    Jan 1, 2007

  • AUSIMM
    In Situ Bioremediation of a Heavily Polluted Alkaline Soil in a Uranium Deposit

    In Situ Bioremediation of a Heavily Polluted Alkaline Soil in a Uranium Deposit

    Sep 13, 2010

  • AUSIMM
    Barrow Island Development Drilling-The Application of Experience, Equipment and Techniques to Achieve Maximum Economy

    The commercial development of the shallow (2200 ft2 400 ft) Windalia sand reservoir at Barrow Island provided the opportunity to conduct an intensive drilling programme using equipment and techniques

    Jan 1, 1968

  • AUSIMM
    Assessing Ore Loss and Ore Dilution ù Quantifying the Effects of Geological and Technical Uncertainties

    By P A. Dowd

    This paper describes an integrated approach to the evaluation of ore loss and ore dilution via geostatistical simulation of in situ geology and grade characteristics, simulation of blasting mechanisms

    Jan 1, 2004