Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Practical Guide to Aboriginal Negotiations

    Dealing with Aboriginals and various others purporting to represent them has become part and parcel of exploration and mining in Australia, whereas 20 years ago it was not. The author has been involve

    Jan 1, 1990

  • AUSIMM
    Reserves and Resources-Heavy Mineral Sands

    The mineral sands deposit of Australia pose a number of unique, and quite unusual problems for the explorationist. Most concentrations of heavy minerals have been found in the unconsolidated sedimen

    Jan 1, 1987

  • AUSIMM
    Kinetics and M÷ssbauer Spectroscopy Studies of Direct Iron Ore Reduction

    By Zhou A, Cadogan J. M

    Direct reduction of iron ore (DR) is one of the promising technology emerging in the world's steel industry. Kinetics and Mossbauer studies of DR with hydrogen have been carried out at two temp

    Jan 1, 1997

  • AUSIMM
    A System Dynamics Approach to Mine Modelling and Cut-Off Grade Management

    By Larsen E. R

    We discuss the concept of optimal cut-off grade policies and their advantages in terms of maximisation of net present value of mining operations. There are indications, however, that such optimal po

    Jan 1, 1995

  • AUSIMM
    Large Compact Bucket Wheel Excavators

    Most compact bucket wheel excavators in use are in the small to medium range. Large compact bucket wheel excavators compete directly with con- ventional longer boom excavators which have operational

    Jan 1, 1989

  • AUSIMM
    South Australian Coals And Their Troublesome Impurities

    By Lindner E, Bosio M

    South Australian coals are all low in rank and generally poor in quality, with difficult combustion characteristics. This circumstance makes the selection of a fuel source for future power generati

    Jan 1, 1977

  • AUSIMM
    Underground Mine Production Scheduling Using Mixed Integer Programming

    Production scheduling is an important element of the mine planning process. The production schedule specifies the quantities of mineral to extract, the source of this ore, the timing of extraction a

    Jan 1, 1995

  • AUSIMM
    Methods of Restoring New Zealand Native Forests After Mining (b7250dc7-77db-468c-aac9-f783e0d1bb16)

    By Ross C

    This paper uses the results of research trials by Landcare Research and Forest Research Institute and assessments of reclamation plantings at mines and other drastically disturbed sites to describe m

    Jan 1, 1995

  • AUSIMM
    Western Ring Route – Waterview Connection Driven Tunnel: Assessment of Groundwater Effects

    By S France

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will comprise 2.5 km of ‘undrained’ driven tunnels and 900 m of drained cut-an

    Mar 8, 2011

  • AUSIMM
    Cardox Blasting Trials at Waihi Gold Mining

    By A Van Kersen, J Hodson

    Waihi Gold Mining Co Ltd [WGM], operated by Normandy Mining, has been internationally recognised for its achievements in environmental management at the Martha Mine at Waihi. In a proactive approach t

    Jan 1, 2001

  • AUSIMM
    Developing Assessment Methods and Remediation Protocols for New Zealand Sites Impacted by Acid Mine Drainage

    By A Black, A de Jo, J Cavanagh, J Harding

    Acidic and metal-rich waters have been discharging from Sullivan Mine, West Coast, New Zealand since the closure of the mine during the early- 1990s. This has resulted in a decrease in pH from a backg

    Jan 1, 2003

  • AUSIMM
    Small Particle Eddy Current Separation

    During conventional eddy current separation, a repulsive force is applied to metallic particles by placing them in a rapidly changing magnetic field generated by a spinning magnetic rotor carrying an

    Jan 1, 2000

  • AUSIMM
    A Methodology for Estimating Reserves from Resource Models

    The investment worth of a mineral deposit can only be realistically evaluated in relation to specific engineering design criteria, which fully details the proposed method of exploitation. These crit

    Jan 1, 1987

  • AUSIMM
    Two South Australian Coastal Rehabilitation Programmes After Mining

    Two separate mine rehabilitation programmes carried out by Australian Consolidated Industries Limited (A.C.I.) in South Australia at Normanville and Port Lawler are discussed. Emphasis is given to

    Jan 1, 1976

  • AUSIMM
    A New Design of Pulp Lifter for Grate Discharge Mills

    By Morrell S

    As more and more autogenous and semi-autogenous mills are run in closed circuit with cyclones the limitations that can be imposed by poor grate and pulp lifter design are becoming increasingly appar

    Jan 1, 1997

  • AUSIMM
    Tracking Coal Fragmentation from Pit Face to Plant Feed

    By Thornton D, Firth B, Kojovic T, Brien G, O&apos

    Coal fragmentation is a function of coal type and mining process. Each unit step in the mining, handling and crushing chain of coal imparts energy to the material and impacts on size degradation and

    Jan 1, 1998

  • AUSIMM
    Economic Loss Fucnctions and Geostatistical Simulation for Grade Control Applications

    By Koppe J. C, Dimitrakopoulos R, Costa J. F

    Grade control and the delineation of ore/waste in open pit operations is traditionally based on the comparison of estimated grades with an economic cut-off. This paper deals with an alternative appr

    Jan 1, 1998

  • AUSIMM
    Preparation of Mine Fill and Disposal of Residue at Zinc Corporation New Broken Hill Consolidated, Broken Hill

    By Johns AS

    Comissioning of a new residue disposal tcluding upgraded classification for none backfill preparation, new variable speed pumps and a new residue dam took place in 1¦76. The system is described.

    Jan 1, 1978

  • AUSIMM
    A New Organic Pellet Binder From Bituminous Materials

    By Gomi S

    A new watersoluble binder for mineral ore pellets has been developed by the sulfonation of bituminous materials. A highly effective binder for iron ore pellet making is obtainable from bituminous

    Jan 1, 1974

  • AUSIMM
    Contract Versus Owner Mining ù An Update on Australasian Open Pit Mining Practice (Iron Ore Conference Perth, WA, 9 - 11 September 2002)

    With the advent of the resources boom in the late-1960s most of the larger scale resources projects in Australasia were commissioned on an æowner miningÆ basis, where the mine owners owned and operate

    Jan 1, 2002