Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mature Entry Mining Students at Ballarat CAE

    By Pratt IJ

    A report is given of the problems of finance and physical resources that currently affect The University of New South Wales, and of some of the measures adopted to alleviate them. Partly as'

    Jan 1, 1986

  • AUSIMM
    Longwall Mining at Appin Colliery

    A four monthly period was analysed for each retreating longwall face which indicated that output increased from 1140 tonnes/day for Longwall 1, to 1620 tonnes/day for Longwall 2 and to 2090 tonnes

    Jan 1, 1976

  • AUSIMM
    Safety Legislation and its Effectiveness (ac5e8ac3-fdc6-4268-ac21-d01fd1825ebf)

    By Golledge P

    Safety legislation has a long history and widespread application, but how can one test its effectiveness? One way is to examine safety statistics. Another way is to compare the legislation with pri

    Jan 1, 1975

  • AUSIMM
    Equilibrium distribution of Pb between copper metal and slags

    By C Chen, T Kan

    The distribution ratio of Pb (LPb s/m) between three types of slags (FeOx–SiO2, CaO–FeOx and FeOx– CaO–SiO2) and molten copper after equilibrium was measured at 1300°C and oxygen partial pressure (pO2

    Jun 19, 2024

  • AUSIMM
    Surface and Near Surface Gold at Vunda, Fiji

    Surface and near surface particulate gold occurs sporadically over an area of some60 km2 between Vunda and Navilawa on the west coast of Viti Levu, Fiji.Background grades of 0.01 ppm can be found in t

    Jan 1, 1984

  • AUSIMM
    A New Type of Continuous Processing HGMS and its Magnet System

    By Chen J, Sun ZY

    The present paper gives the design of a new HGMS for magnetic separation of sulphides. The main characteristics of this HGMS are using iron-cladding saddle-shaped magnetic coil for instead of the or

    Jan 1, 1993

  • AUSIMM
    Development of a Process Simulation Package for Mineral Processing Plants

    By Riley TW

    This paper describes a Process Simulation Package for modelling the steady-state operation of a mineral processing plant. There are two levels of input allowed into the package. The first allows simpl

    Jan 1, 1985

  • AUSIMM
    Acoustic Emission Characteristics of Rocks Under Unconfined Compression and Tensile Testing

    By J O. Watson, V S. Vutukuri

    This paper presents results of an investigation on acoustic emission characteristics of granite, sandstone and rock-like material in the unconfined compression and tensile tests. Both the acoustic emi

    Jan 1, 1999

  • AUSIMM
    EastLink Tunnel - Permanent Concrete Lining and Waterproofing Design

    By E Taylor, F Lebbing

    The $2.5 billion EastLink project is a 39 km tollway and includes twin three-lane, 1.5 km long, undrained driven tunnels with cross passages every 120 m. The hard rock tunnels are being built to avoid

    Jan 1, 2008

  • AUSIMM
    Ball Mill Poly-Met Liner Evaluation at PT Newmont Nusa Tenggara – Batu Hijau Mine

    By G Pasin, F Wirfiyata, G Khomaeni, W Valery, A Maclean, A Jankovic

    The grinding circuit at PT Newmont Nusa Tenggara (PTNNT) – Batu Hijau mine consists of two SABC (semi-autogenous milling, ball milling, pebble crushing) trains, including four 20'?×?33'6? ball mills t

    Sep 1, 2014

  • AUSIMM
    Treatment of Sulfide Tailings from Base Metal and Gold Operations - A Source of Saleable By-Products and Sustainable Waste Management

    By D A. McCallum

    With depth, many gold ores become sulfidic with minerals such as pyrite, pyrrhotite and arsenopyrite becoming prevalent. In addition, many underground gold mines use tailings backfill to bind and stor

    Jan 1, 2007

  • AUSIMM
    Gold Plant Cyanide Safety

    By B Vernon, M Whiteley, T Robinson

    The Western Australian gold industry has approximately 100 operating plahts, mainly CIP/CIL. The nature of the State's rapidly expanding gold industry gave rise to concerns over management of the

    Jan 1, 1990

  • AUSIMM
    Shaft Guide Reactions at No. 2 Ore Shaft Mount Isa Mines Limited

    By Mercer J. K

    Shaft guide reaetions in No. 2 Ore Shaft, Mount Isa Mines Limited, have been reduced to a low order of magnitude by the use of self aligning slippers and spring loaded guide rollers. Before commission

    Jan 1, 1961

  • AUSIMM
    Metallogenesis of Devonian Volcanogenic Sulfide Deposits and Occurrences, Southern Yukon-Tanana Terrane, Easter Alaska Range, Alasaka

    By Krouse RH, Aleinikoff JN, Nokleberg WJ, Church SE, Newkirk SR

    A belt of volcanogenic massive sulfide (VMS) deposits and occurrences extends for over 150 km along the southern margin of the Yukon-Tanana terrane in the eastern Alaska Range. The VMS bodies occur ma

    Jan 1, 1990

  • AUSIMM
    Optimisation of Reinforcement Design of Coal Mine Roadways

    By Fabjanczyk MW, Guy RJ, Tarrant GC

    The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of securi

    Jan 1, 1992

  • AUSIMM
    Global Lessons for a Local Problem – Rehabilitation Bonds and Victoria’s Latrobe Valley Coalmines

    By M L. Cramer, N P. Wines

    "On 9 February 2014, bushfire embers landing on exposed coal in a disused pit at the Hazelwood mine in Victoria’s Latrobe Valley ignited a coal fire that burned for 45 days. The fire was the largest a

    Jun 28, 2016

  • AUSIMM
    Mining Related Environmental Database for West Coast and Southland: Data Structure and Preliminary Geochemical Results

    By D Thomas

    Geochemical data related to AMD for the West Coast and Southland regions have been collated into a relational database and GIS system. The types of information include; rock geochemical data, water ch

    Jan 1, 2005

  • AUSIMM
    Python Underground Processing Plant Critical Design

    Python Underground Processing Plant Critical Design The use of continuous gravity recovery in combination with a controlled breakage fine crushing and screening system followed by flash flotation has

    Sep 13, 2010

  • AUSIMM
    Outline of Electrical Plant Layout Mount Isa Mines Ltd

    By Edmonds G. A

    The power station went into operation in 1931, when the installed capacity was 12,500 kVA. with a loading of 4,000 kVA. In 1936 the loading increased to 6,750 kVA. which necessitated the addition of a

    Jan 1, 1953

  • AUSIMM
    Optimisation of Asanko’s Obotan SABC circuit to achieve ‘Project 5 Million’

    By R Bradford, W Gift-Agbey, T Vorster, P Morgan, E Grobler

    The Asanko Gold Mine in Ghana started processing ore from the Nkran pit in January 2016 at a production nameplate of 3 Mt/a. The flowsheet is a conventional SAG, ball mill and pebble crusher (SABC) w

    Aug 29, 2018