Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mature Entry Mining Students at Ballarat CAEBy Pratt IJ
A report is given of the problems of finance and physical resources that currently affect The University of New South Wales, and of some of the measures adopted to alleviate them. Partly as'
Jan 1, 1986
-
Longwall Mining at Appin CollieryA four monthly period was analysed for each retreating longwall face which indicated that output increased from 1140 tonnes/day for Longwall 1, to 1620 tonnes/day for Longwall 2 and to 2090 tonnes
Jan 1, 1976
-
Safety Legislation and its Effectiveness (ac5e8ac3-fdc6-4268-ac21-d01fd1825ebf)By Golledge P
Safety legislation has a long history and widespread application, but how can one test its effectiveness? One way is to examine safety statistics. Another way is to compare the legislation with pri
Jan 1, 1975
-
Equilibrium distribution of Pb between copper metal and slagsBy C Chen, T Kan
The distribution ratio of Pb (LPb s/m) between three types of slags (FeOx–SiO2, CaO–FeOx and FeOx– CaO–SiO2) and molten copper after equilibrium was measured at 1300°C and oxygen partial pressure (pO2
Jun 19, 2024
-
Surface and Near Surface Gold at Vunda, FijiSurface and near surface particulate gold occurs sporadically over an area of some60 km2 between Vunda and Navilawa on the west coast of Viti Levu, Fiji.Background grades of 0.01 ppm can be found in t
Jan 1, 1984
-
A New Type of Continuous Processing HGMS and its Magnet SystemBy Chen J, Sun ZY
The present paper gives the design of a new HGMS for magnetic separation of sulphides. The main characteristics of this HGMS are using iron-cladding saddle-shaped magnetic coil for instead of the or
Jan 1, 1993
-
Development of a Process Simulation Package for Mineral Processing PlantsBy Riley TW
This paper describes a Process Simulation Package for modelling the steady-state operation of a mineral processing plant. There are two levels of input allowed into the package. The first allows simpl
Jan 1, 1985
-
Acoustic Emission Characteristics of Rocks Under Unconfined Compression and Tensile TestingBy J O. Watson, V S. Vutukuri
This paper presents results of an investigation on acoustic emission characteristics of granite, sandstone and rock-like material in the unconfined compression and tensile tests. Both the acoustic emi
Jan 1, 1999
-
EastLink Tunnel - Permanent Concrete Lining and Waterproofing DesignBy E Taylor, F Lebbing
The $2.5 billion EastLink project is a 39 km tollway and includes twin three-lane, 1.5 km long, undrained driven tunnels with cross passages every 120 m. The hard rock tunnels are being built to avoid
Jan 1, 2008
-
Ball Mill Poly-Met Liner Evaluation at PT Newmont Nusa Tenggara – Batu Hijau MineBy G Pasin, F Wirfiyata, G Khomaeni, W Valery, A Maclean, A Jankovic
The grinding circuit at PT Newmont Nusa Tenggara (PTNNT) – Batu Hijau mine consists of two SABC (semi-autogenous milling, ball milling, pebble crushing) trains, including four 20'?×?33'6? ball mills t
Sep 1, 2014
-
Treatment of Sulfide Tailings from Base Metal and Gold Operations - A Source of Saleable By-Products and Sustainable Waste ManagementBy D A. McCallum
With depth, many gold ores become sulfidic with minerals such as pyrite, pyrrhotite and arsenopyrite becoming prevalent. In addition, many underground gold mines use tailings backfill to bind and stor
Jan 1, 2007
-
Gold Plant Cyanide SafetyBy B Vernon, M Whiteley, T Robinson
The Western Australian gold industry has approximately 100 operating plahts, mainly CIP/CIL. The nature of the State's rapidly expanding gold industry gave rise to concerns over management of the
Jan 1, 1990
-
Shaft Guide Reactions at No. 2 Ore Shaft Mount Isa Mines LimitedBy Mercer J. K
Shaft guide reaetions in No. 2 Ore Shaft, Mount Isa Mines Limited, have been reduced to a low order of magnitude by the use of self aligning slippers and spring loaded guide rollers. Before commission
Jan 1, 1961
-
Metallogenesis of Devonian Volcanogenic Sulfide Deposits and Occurrences, Southern Yukon-Tanana Terrane, Easter Alaska Range, AlasakaBy Krouse RH, Aleinikoff JN, Nokleberg WJ, Church SE, Newkirk SR
A belt of volcanogenic massive sulfide (VMS) deposits and occurrences extends for over 150 km along the southern margin of the Yukon-Tanana terrane in the eastern Alaska Range. The VMS bodies occur ma
Jan 1, 1990
-
Optimisation of Reinforcement Design of Coal Mine RoadwaysBy Fabjanczyk MW, Guy RJ, Tarrant GC
The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of securi
Jan 1, 1992
-
Global Lessons for a Local Problem – Rehabilitation Bonds and Victoria’s Latrobe Valley CoalminesBy M L. Cramer, N P. Wines
"On 9 February 2014, bushfire embers landing on exposed coal in a disused pit at the Hazelwood mine in Victoria’s Latrobe Valley ignited a coal fire that burned for 45 days. The fire was the largest a
Jun 28, 2016
-
Mining Related Environmental Database for West Coast and Southland: Data Structure and Preliminary Geochemical ResultsBy D Thomas
Geochemical data related to AMD for the West Coast and Southland regions have been collated into a relational database and GIS system. The types of information include; rock geochemical data, water ch
Jan 1, 2005
-
Python Underground Processing Plant Critical DesignPython Underground Processing Plant Critical Design The use of continuous gravity recovery in combination with a controlled breakage fine crushing and screening system followed by flash flotation has
Sep 13, 2010
-
Outline of Electrical Plant Layout Mount Isa Mines LtdBy Edmonds G. A
The power station went into operation in 1931, when the installed capacity was 12,500 kVA. with a loading of 4,000 kVA. In 1936 the loading increased to 6,750 kVA. which necessitated the addition of a
Jan 1, 1953
-
Optimisation of Asanko’s Obotan SABC circuit to achieve ‘Project 5 Million’By R Bradford, W Gift-Agbey, T Vorster, P Morgan, E Grobler
The Asanko Gold Mine in Ghana started processing ore from the Nkran pit in January 2016 at a production nameplate of 3 Mt/a. The flowsheet is a conventional SAG, ball mill and pebble crusher (SABC) w
Aug 29, 2018