Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Drill Blast Optimisation

    Scientific drilling and blasting techniques are currently being presented to the mining industry as an aid in the overall optimisation process. The degree of success in the development of these techn

    Jan 1, 1990

  • AUSIMM
    Development Of, And Experience With, Underground Electric Loaders

    By Sillet R, Corin P. J, Wilson G

    Zinc Corporation of Broken Hi11 had some long hole stopes coming into use which could not be mined using diesel loaders, because of ventilation restrictions. In preference to use of pneumatic load

    Jan 1, 1977

  • AUSIMM
    Better Ideas-Brighter Future

    By Hedley TP

    Success for underground coal mine operators in the 1990's and beyond will be dependent upon better understanding of the dynamics of their operating environment, and extension of emerging tech

    Jan 1, 1987

  • AUSIMM
    Grade Distribution and Grade Control Procedures, Great Lady Gold Deposit, Eastern Goldfields, WA

    The Great lady gold deposit presented the challenge of providing a new grade control system for an usual type of orebody in the Eastern Goldfields. Mineralisation occurs as secondary enrichment about

    Jan 1, 1990

  • AUSIMM
    Mexican Ag-Au and Ag-Pb-Zn Epithermal Deposits: Hydrothermal Products of a Magmatic (?) Heritage (41c4cb29-e5de-4019-8500-0b3e34114e35)

    By Albinson T

    Mexican epithermal deposits can be broadly grouped into two types based on their contained metals, distribution, associated igneous rocks and fluid inclusion compositions. Silver-gold deposits (e.g.

    Jan 1, 1995

  • AUSIMM
    Processing and Potential Utilisation of Variable Grade Western Australian Diatomite Deposits

    The Engineering Chemistry Division of the Government Chemical Laboratories of WA initiated an ongoing investigation into the possible utilisation of diatomites of this State. The work has shown th

    Jan 1, 1979

  • AUSIMM
    Heap Leaching

    The preferred alternatives in heap design and their motivation are identified as- -normal heap leaching, to be generally applied wherever possible, - flooded vat leaching, to be appliedwhere wetted or

    Jan 1, 1984

  • AUSIMM
    Carboxylic Acids Modified by Dithio Fragments as Reagents for Gold and Copper Containing Ores Flotation

    By Abdurazakov A, Avrakhov A, Solozhenkin P

    The flotation properties of acetic acids modified by xanthic and dithiocarbamic fragment in regards to copper and ferrous minerals and their noble metal containing ores have been investigated. The

    Jan 1, 1993

  • AUSIMM
    Slurry Loading Of Ironsand Concentrate At Taharoa

    By Gadd D. E

    Since October 1972, New Zealand Steel Mining Ltd has loaded around 10 million tonnes of ironsand concentrate from single-point mooring buoys located off-shore at Taharoa on the west coast of the No

    Jan 1, 1980

  • AUSIMM
    Practical Ventilation Planning for Mine Management Using a Digital Computer

    By Hempenstall J, English W

    Mine management has a responsibility under the various acts of state parliaments for the adequate ventilation of existing workings. It also has a need to plan adequately for the ventilation of pro

    Jan 1, 1983

  • AUSIMM
    Geomechanics: An Art to a Science?

    This paper discusses why Argyle Diamonds adopted thickened tailings disposal in 1985 and how the system was developed over the next seven years. A wide ranging review of the thickened tailings disp

    Jan 1, 1996

  • AUSIMM
    Recent Improvements to Operations and Control of Pasminco Metals - BHAS Zinc Plant

    By Nolan D. P, Balales M

    Over the last two years work has been undertaken within the Pasminco Metals - BHAS Zinc Plant to improve the efficiency and maintain the production capacity of the operation. The work has centred up

    Jan 1, 1993

  • AUSIMM
    Wirralie Gold Mine A Case Study

    By Goode A, Belby P, Wardell-Johnson M

    Within a short time frame of just over two years Wirralie Gold Mine has been developed from a virgin geological discovery to an operating gold mine with a mine life of six years and a production r

    Jan 1, 1989

  • AUSIMM
    Operations of a Small Heap Leach

    The Fosterville goldfield, situated 25 km east of Bendigo, Victoria was at its peak between 1894-1910 with some 47 600 ounces produced (Figure 1). Since that time intermittent mining and tailings r

    Jan 1, 1994

  • AUSIMM
    Haematite Recovery from a Tailings Stream

    Haematite Recovery from a Tailings Stream Laboratory and pilot scale testing were carried out in 1999 on a tailing sample from a North American iron ore plant using gravity, magnetic and flotation te

    Sep 13, 2010

  • AUSIMM
    Sedimentological Evaluation of Placer Deposits

    Measurable physical characteristics of placer deposits include both fluvial sedimentological features and their related heavy mineral suite. These two important identifiable factors are interrelat

    Jan 1, 1986

  • AUSIMM
    An Integrated Mine Development and Supply System

    In the face of intense global competition and other business pressures on coal miners, ongoing quality initiatives and continuous process improvements are needed to enhance business performance. By vi

    Jan 1, 1998

  • AUSIMM
    Mobile Equipment - Choice and Operation

    Those developing or planning a new mining operation base their financial projections on amounts of gold produced as soon as practically possible. The choice and ongoing operation of mobile plant figur

    Jan 1, 1986

  • AUSIMM
    GPSS Computer Simulation of Proposed Undergorund Rear Dump Truck Ore Haulage System at ZC Mines, Broken Hill

    By Sturgul J. R

    ZC Mines investigated a proposal to replace the present underground train haulage system with rear dump trucks. The number of rear dump trucks required to achieve target output and the required mix

    Jan 1, 1988

  • AUSIMM
    Project Finance Ratings Analysis Measures Overall Risk Exposure

    By J F. Penrose

    To obtain cost-efficient financing by way of securing an optimal credit rating, the operating and market risks of a single-asset mining project should be accommodated in the financial structure. Weak

    Jan 1, 2003