Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Blasting and Grinding - An Integrated Comminution System

    By Kristiansen J

    A series of laboratory blasting and ball mill grinding tests have been done on four different types of hard and competent rocks. The results show that exposing these rock types to a higher level of

    Jan 1, 1995

  • AUSIMM
    Kinetics of Arsenic Removal from Lead Bullion

    By Happ J. V

    Factors affecting the rate of arsenic removal from lead bullion during softening processes were studied. Very high rates of removal could be obtained under conditions of intense agitation and read

    Jan 1, 1987

  • AUSIMM
    Molten Salt Process for Debismuthising Lead

    By Denholm WT

    The Dittmer process for the debismuthising of lead by electrolysis beneath molten caustic soda has been scaled up to 100 kg lots for batchwise operation and to 20 kg per hour for a continuous flow

    Jan 1, 1975

  • AUSIMM
    Exploration of Porphyry Copper Lithocaps (7b4c8dbd-2256-4f4e-a1fc-af8b844fc435)

    Lithocaps are potentially voluminous zones of advanced argillic and associated argillic alteration located above the subvolcanic intrusive environment. They constitute exploration objectives for epit

    Jan 1, 1995

  • AUSIMM
    Energy Reduction at Sulphide Corporation - Two Case Studies

    By Green GR

    Description of two methods developed at Sulphide's Cockle Creek Plant as part of a site energy reduction program. The two case studies are:

    Jan 1, 1985

  • AUSIMM
    Mine Water Usage Eco-Efficiency

    By A Minns

    This paper provides details of Newmont AustraliaÆs group water usage quantities, qualities and typical efficiencies, together with details of the approach employed to undertake mine water management r

    Jan 1, 2003

  • AUSIMM
    Integrated Dredging Automation

    Most mining dredges are adapted from canal/harbour dredges. Their automation and control systems are generally not designed for integrated mining operations. Consequently they have a number of limitat

    Jan 1, 2001

  • AUSIMM
  • AUSIMM
    PXI System for Monitoring Longwall Gate Roads Convergence

    By K Matsui, R N. Gupta, H Shimada

    Roof falls and failures of powered supports were major threats at longwall face. Abnormal geological conditions were caused roof falls and shield damage. Therefore continuous monitoring and analysis o

    Jan 1, 2003

  • AUSIMM
    A Study on Process Mineralogy and Mineral Processing of Complex Carbon-Bearing Cu-Pb-Co-Ni Multi-Metal Sulfide Ore by Bulk Flotation

    A Study on Process Mineralogy and Mineral Processing of Complex Carbon-Bearing Cu-Pb-Co-Ni Multi-Metal Sulfide Ore by Bulk Flotation

    Sep 13, 2010

  • AUSIMM
    Bacterial Leaching of Chalcopyrite at Low Relative Humidities

    By Madgwick J. C

    Bacterial leaching of museum grade chalcopyrite and chalcopyrite concentrates at low sorptive relative humidities (55-91 per cent rH) was demonstrated. Optimum release rates were 13 and 27 mg/gram/100

    Jan 1, 1984