Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Remediation of Wall Failure at Kalgoorlie Consolidated Gold Mines’ Golden Pike Cut-back 2016

    By J Darbritz

    "This paper details the events leading up to a slope failure that occurred at Kalgoorlie Consolidated Gold Mines (KCGM) and the remediation method executed using rope access specialists.n January 2016

    Nov 15, 2016

  • AUSIMM
    Sustainable Plant Design

    By J Kwak

    Driving sustainability concepts and practices into the heart of the design process is the key to achieving a successful, sustainable plant design. Engineering design practices, tools, systems and meth

    Jan 1, 2004

  • AUSIMM
    The Evolution of Wall Control Programs at Kidston Gold Mines

    By A Marton

    Concerns with crest losses have seen changes to a number of design and operating parameters to retain the integrity of the wall and the berms of the Kidston Gold MinesÆ Eldridge Pit. Until trials bega

    Jan 1, 2001

  • AUSIMM
    A Review of the In Situ Stress Database for Tunnel Design in the Hawkesbury Sandstone, Sydney, New South Wales

    By G McKay, M Erskine, S Macklin

    The City of Sydney is currently investing in a number of infrastructure projects that require tunnel excavations within the Triassic Hawkesbury Sandstone. It is generally accepted that this formation

    Sep 17, 2014

  • AUSIMM
    Seismic Prospecting for Oil in Queensland

    During the past three years there have been several parties prospecting for oil in the Stat6 of Queensland, and It was: gratifying to read the newspaper headlines last Christmasabout the discovery of

    Jan 1, 1962

  • AUSIMM
    The Effect of Particle Size Distribution in Electrostatic and Magnetic Separation on Mineral Recovery and Yields

    By J Ledgerwood

    Namakwa Sands is a mineral processing company based on the West Coast of South Africa and is solely owned by Exxaro Resources Limited. Mineral ore is mined and processed, concentrated and both chemica

    Oct 5, 2011

  • AUSIMM
    Inferring the earth moving equipment–environment interaction in open pit mining

    By M Balamurali

    In mining, grade control generally focuses on blasthole sampling and the estimation of ore control block models with little or no attention given to how the materials are being excavated from the grou

    Jun 22, 2022

  • AUSIMM
    The Application of Rock Engineering Systems to Block Caving to Identify the Effective Parameters

    By M Mohammad Khani

    An economic block cave is dependent to the characteristics of the rock mass at stages of caving. These are cave initiation, propagation and ore flow. In this research, the rock engineering system (RES

    May 9, 2016

  • AUSIMM
    Key Engineering Considerations in the Specification and Selection of Mine Refrigeration Plants

    As mines become deeper, the problems of heat in the workplacebecome more acute. An important response from the industry hasbeen the widespread adoption of microclimate cooling such asair-conditioned c

    Jan 1, 2001

  • AUSIMM
    Solids Cooling in Fluidised Solids Transfer Devices

    By J Sarvinis

    The design and operational aspects of fluidised solids transfer-cooling devices will be discussed in this presentation. The devices include air slides and fluoseals (also called seal pots, loop seals,

    Jan 1, 2006

  • AUSIMM
    The Cannington Silver Lead Zinc Deposit - at Feasibility

    By M T Roche

    The Cannington deposit is one of the largest accumulations of silver-lead known. Located 135 km southeast of Cloncurry in North West Queensland (Figure 1), Australia, the deposit is currently in th

    Jan 1, 1994

  • AUSIMM
    Excavation of the Gjovik Olympic Mountain Hall - The World's Largest Rock Cavern for Public Use

    The Gj0vik Olympic Mountain Hall is the world's largest underground cavern for public use and was created primarily to facilitate the ice hockey tournaments for the 1994 winter Olympics in Norw

    Jan 1, 1995

  • AUSIMM
    The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case Study

    By B Jones, M Chappell

    Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the

    Sep 17, 2014

  • AUSIMM
    Required Cooling System Capacities for Extended Longwall Panels at a Bowen Basin Mine

    By M S. Kizil, T OÆConnor

    It is predicted that underground coal mines in the Bowen Basin will have a significant rise in heat problems as mines aim to increase production, depth of extraction and length of longwall panels. At

    Jul 1, 2013

  • AUSIMM
    The Use of Common Business Intelligence and Analytics Tools in the Operation and Optimisation of Iron Ore Process Plants

    By T Nassis, P Louw, M R. Fry, T du Toit

    Business intelligence (BI) and business analytics (BA) are established IT technologies that are used extensively in the business environment. This paper discusses the use of these technologies in prod

    Jul 13, 2015

  • AUSIMM
    The Sealing , Re-Opening, and Recovery of Aberdare North Colliery, N.S.W., Following the Occurrence of a Spontaneous Heating

    By Sneddon N

    In November, 1975, Aberdare North colliery was sealed at the surface to extinguish an open fire underground.The fire had developed from a spontaneous heating in one of the open goaf areas of the mine.

    Jan 1, 1978

  • AUSIMM
    Transformation of automated optical image analysis software Mineral4/Recognition4 to Mineral5/Recognition5

    By A Poliakov, E Donskoi, K Vining

    The automated optical image analysis software Mineral4/Recognition4 (M4/R4) is capable of performing comprehensive characterisation of different materials throughout the iron ore value chain, includin

    Nov 8, 2021

  • AUSIMM
    Spatial Planning and Interface Issues for Mechanical and Electrical Facilities in Road Tunnels

    Mechanical and electrical (M&E) systems in road tunnels are constrained by the traffic envelope and the construction profile. Whilst these spatial constraints are often ælocked inÆ early in the de

    Jan 1, 1999

  • AUSIMM
    Mining Under Indonesia's New Environmental Law

    The new law on Environmental Protection and Management (Republic of Indonesia Law 32 of 2009) was passed by the Indonesian parliament in September 2009. This law aims to protect Indonesia's rapid

    Jun 1, 2010

  • AUSIMM
    Geotechnical Challenges and Requirements for the Subsurface Development: The Case History of the Brasilia Metro

    Subsurface development requires some geotechnical conditions and challenges. Most of then are related to the compatibility between tunnelling system and surrounded ground conditions, and design criter

    Jan 1, 1999