    The R67 Refrigeration Plant at Enterprise Mine, Mount Isa ù The WorldÆs Largest Bulk Air Cooler

    The 3.5 million tones per annum Enterprise mine is the newest underground copper mine at Mount Isa in northern Australia. At a depth of up to 2000 metres, it is the hottest and deepest mine in Austral

    Jan 1, 2002

  • AUSIMM
    Geophysical Characteristics, Deep Structure, Magmatism and Metallogeny of the Pacific Belt

    By L A. Maslov

    We have considered the following characteristics of the crust and upper mantle of the Pacific Belt: seismic wave velocity anomalies, mechanical stress and shear deformation rate fields, heat flow and

    Jan 1, 1995

  • AUSIMM
    Thermal phosphorus – it’s a hot commodity with a hot process

    By R Atmuri, W Liang, R Prasad, Y Liu, E Wingate

    Yellow phosphorus (YP) has been commercially produced since the 1920s. First in the USA by the Tennessee Valley Authority (TVA), next in Russian (Kazakhstan) in the 1950s, and finally in China in the

    Aug 21, 2024

  • AUSIMM
    Wall Control Blasting Practices at BHP Billiton Iron Ore Mt Whaleback

    By C T. Dunbar, P A. Walker, G E. LeJuge

    A programme of blast improvement was initiated at the Mt Whaleback iron ore mine by BHPIO management in early-1998. One component of that work was the need to improve wall control blasting practices t

    Jan 1, 2001

  • AUSIMM
    Keeping the Lights On! High Risk Blasting at Boddington Gold Mine

    By D Rubery, C Croker

    The Boddington Gold Mine (BGM) is located 120 km south east of Perth, Western Australia. The operation is managed by Worsley Alumina Pty Ltd and mined by contractor Henry Walker Eltin (HWE). The mine

    Jan 1, 2002

  • AUSIMM
    Extractive Companies, Development and Environmental Agendas

    By B Harvey

    Achieving community and stakeholder endorsement during life-of-mine planning and implementation requires a business-connected approach, as opposed to charitable giving, disconnected offsets and enviro

    Jul 16, 2014

  • AUSIMM
    The Challenger Gold Mine

    By M Sandy, P Bamford

    The Challenger Gold deposit was discovered in 1995 by Dominion Mining Ltd in a remote western area of the Gawler Craton in South Australia. Mine development commenced in 2002 with initial production f

    Jan 1, 2008

  • AUSIMM
    Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)

    By D Horacek, I K. Sheppard

    Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in

    Jan 1, 2007

  • AUSIMM
    Mining Schools in Relation to the Mining Industry

    EARLY in 1911 the Public Service Board of New South Wales suggested the advisability of inaugurating a School of Mines at Broken Hill, arid made inquiries to determine how such an institution should b

    Jan 1, 1912

  • AUSIMM
    Mine Waste Cover System Design ù Linking Predicted Performance to Groundwater and Surface Water Impacts

    By C Wels

    Current best management practice requires the placement of a cover onto most types of mine waste including tailings, waste rock and/or spent heap leach rock at closure of the mine. The objectives of a

    Jan 1, 2003

  • AUSIMM
    Fragmentation Assessment Using the FragScan System: Quality of a Blast

    By B Tessier

    Checking the quality of a blast may be considered as subjective. Checking this quality will require measuring objective parameters. One of them is the resulting fragmentation of the blasted product. N

    Jan 1, 2001

  • AUSIMM
    Addressing challenging applications of intensive cyanidation in gravity gold recovery

    By J Carrillo, A King

    Gravity recoverable gold (GRG) is largely distinguished from other gold by its non-mineralised, metallic form, its high degree of liberation from the ore and its appreciable particle size. The gold mi

    Aug 29, 2018

  • AUSIMM
    Mine Planning and Geotechnical Considerations in the Development of the Western Baters of Yallourn Open Cut Mine

    By Tilley H. L

    The 90 m deep Yallourn Open Cut brown coal mine in the Latrobe Valley, Victoria is developing into an area close to a reverse fault. A major batter stabilisation program, matched to ongoing operatio

    Jan 1, 1989

  • AUSIMM
    Case studies illustrating the role of F-series mine reconciliations in production forecast improvement initiatives

    By S J. Loach

    F-Series reconciliations are formal comparisons of estimates and measurements of ore quantity and quality made at pre-determined points along the mining value chain. F1 is the ratio of ‘Depleted Grade

    Sep 18, 2023

  • AUSIMM
    Utilization Characteristics of Australian Steaming Coals in Overseas Power Stations

    By Juniper LA

    ERM Consultants Pty Ltd was established in 1980 for the purpose of introducing a disciplined coal technology and power station planning service, to support Australia's efforts in establishing

    Jan 1, 1987

  • AUSIMM
    Composite Wear Resistant Materials for Crushing, Grinding, and Screening Abrasive Ores

    By Norman TE

    The design of composite materials for wear resistant service aims at com- bining two or more materials in such a way as to achieve unique and useful properties not generally available in any single

    Jan 1, 1978

  • AUSIMM
    Microanalytical Evaluations of the Savage River Old Tailings Dam, North-?west Tasmania

    By A Hughes, J Agius, T Ferguson, A Parbhakar-Fox, D Lester, L M. Jackson

    Management of historic tailings is a major challenge facing the mining industry and its regulators. However, through improved mineralogical and chemical characterisation of such materials the opportun

    Jul 27, 2015

  • AUSIMM
    The Optimisation of Semi-Autogenous and Ball Mill Based Circuits for Mineral Processing by Means of Versatile and Efficient High Pressure Grinding Roll Technology

    By M J. Daniel

    Mineral resources all over the world are often heterogeneous and have variable ore properties and ore grade. As a result the ore processed in concentrating plants varies over the life of mines. Conseq

    Jan 1, 2009

  • AUSIMM
    Evaluation of CAVEX Hydrocyclone in the Ok Tedi Grinding Circuit

    Ok Tedi Mining Limited has recently completed the first phase of a trial to compare the performance of D26B Krebs cyclones in different configurations to the new Warman 650 mm CAVEX cyclones. From 199

    Jan 1, 2000

  • AUSIMM
    Testing new estimation techniques – rank and replace: a stockwork case study

    By D Finn, D Kentwell

    Experience has shown that the E-Type multiple indicator kriging (MIK) estimation technique often works well for resource estimation in stockwork mineralisation that contains a mixture of high and low-