Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Now, this is the Time for Mining Companies to Choose - Real Option Valuation or Discount Cash FlowBy S Shafiee, N Abbate
The evaluation of mining projects requires a methodology that will give flexibility and manage the existing uncertainty within the projects. The discount cash flow (DCF) and other traditional evaluati
May 24, 2012
-
The Fatigue and Degradation Mechanisms of Hoisting RopesBased upon specialised experience of rope mechanics spanning over 20 years, this paper reviews the processes of degradation and fatigue that are relevant to hoisting ropes in mines. The review is brou
Jan 1, 2005
-
Laboratory Experiments to Quantify the Pull-Out Strength of Single Strand Cable Bolts for Large BoreholesIn high stress mining environments, production drill rigs are often employed for rapid drilling of boreholes for systematic cable bolting. One outcome of this drilling method is the need for larger bo
Nov 25, 2010
-
Ensuring Professional Engineering Capability - Queensland Professional Engineers Act 2002The provision of professional engineering services in Queensland is regulated through the Professional Engineers Act 2002. The Act requires that anyone providing professional engineering services must
May 1, 2010
-
Goethite classification, distribution and properties with reference to Australian iron depositsBy J R. Manuel, J M. F Clout
The importance of goethite to Australian iron ore production is steadily increasing as the proportion of goethite-rich, martite-goethite bedded and channel iron deposits increases at the expense of de
Jul 24, 2017
-
Considerations for the design and support of underground portalsBy M P. Sandy, R M. Stephenson
Portals to access underground mines are important infrastructure and their design requires careful consideration. Portals are generally expected to last for the life of the mine. Typically, the exposu
Mar 15, 2021
-
Monitoring Equipment Productivity Improvements in Coal MinesBy Sengstock G. W, Spathis A. T
Benchmarks of mine equipment involved in the excavation process of coal mines would suggest that such equipment is not always operating at an optimum level. Dragline operations and truck/shovel oper
Jan 1, 1995
-
The Gold-Antimony Veins of Costerfield, VictoriaTHE township of Costerfield is situated in the parish of Costerfield, county of Dalhousie, and lies 6 miles east of Heathcote and 30 miles south-east of Bendigo. It is separated from Heathcote by the
Jan 1, 1922
-
X-Ray Diffraction Analysis of Broken Hill DustsThe problems of using comparatively simple x-ray diffraction equipment for quantitative analysis are examined. Internal standard and direct calibration procedures based upon the measurement of integra
Jan 1, 1968
-
Metana Minerals N.L. 1970-1990: An Emerging Diversified MinerMetana Minerals commenced life in 1970 and graduated to a mining company in 1981 with the opening of a small alluvial tin-tantalite mine at Wodgina (W.A.) The present board of directors assumed cont
Jan 1, 1989
-
Olympic Dam Operation - An Overview of Underground Design and PlanningOlympic Dam Operation is located in the Stuart Shelf Geological Province approximately 520 km north-north-west of Adelaide in South Australia. It is estimated to be one of the worldÆs top five copper
Jan 1, 1999
-
Union Reefs: A Project Assessment and Development Case HistoryBy Giles D, Wegmann D
The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.
Jan 1, 1994
-
Current Situations, Problems, Countermeasures and Suggestions for ChinaÆs Metal Mine DevelopmentBy L B. Zhou, S Li, B L. Wang, S B. Li, Q Wang
The rapid development in ChinaÆs metal mine resources has caused a series of mine environment problems such as serious ecological damage and environment pollution, and secondary geological disasters.
Jul 10, 2012
-
A SAG Mill Circuit Simulator Based on a Simplified Mechanistic ModelBy Magne L, Barria J, Castro O, Menacho J, Gonzalez GD
An extensive experimental campaign was developed in a continuous 6 x 2' (D x L) pilot scale SAG mill. The effect of the feed flow rate, feed solids concentration, ball filling fraction and feed
Jan 1, 1993
-
Developments in International Mineral Resource and Reserve ReportingBy N Weatherstone
A consistent and reliable international approach to public reporting of a mining companyÆs main assets, its Mineral Resources and Mineral Reserves, has become of increasing importance in recent years
Jan 1, 2006
-
Mobile Crushing and Screening Plant Applications for Small- to Medium-Sized Iron Ore ProjectsBy D Connelly
There is now a new generation of mobile crushing and screening plant systems available which have been developed based on the motivation of reducing truck haulage. Newly designed mobile crushing and s
Aug 12, 2013
-
Development Strategy of the Trident Underground Gold MineAvoca Resources LimitedÆs Higginsville Gold Project has a resource base of over 1 300 000 oz of gold. The Trident underground mine, which forms the basis of the project development, has a resource bas
Jan 1, 2008
-
Ethics in the Minerals IndustryBy L Brodie-Hally
In the early-1990s, Tad Golosinski, the former the head of mining department at WASM participated in a review mining engineering courses in Australia. The review team asked various industry executives
Jan 1, 2002
-
Control System Improvement Through Alarm ReductionBy R West
The Olympic Dam smelter facility processes copper concentrate feed using direct-to-blister smelting technology to support the current site production rate of 225 000 t/a copper. The metallurgical cont
Jan 1, 2005
-
Swedish Slot Raise Drilling Method at the Louvicourt MineThe Louvicourt Mine is located 600 km north of Montreal in the province of Quebec, Canada. The owners are Aur Resources Inc (30 per cent), mine operator, Novicourt Inc (45 per cent) and Teck Corporati
Jan 1, 2002