    A case study in managing a high consequence geotechnical risk in a Queensland coalmine

    By K Young, M Martin, D Payne

    This paper outlines the evolution of managing high consequence risk scenarios in BHP Coal, with particular focus on managing the stability of an endwall that is adjacent to a public infrastructure cor

    Nov 29, 2022

  • AUSIMM
    Superior Productivity and Margins Using Modern Mining Management Systems

    With commodities suffering dramatically low real prices, mining business margins are under intense scrutiny. Unfortunately, management systems developed early this century for manufacturing are drivin

    Jan 1, 1999

  • AUSIMM
    The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case Study

    By B Jones, M Chappell

    Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the

    Sep 17, 2014

  • AUSIMM
    Acousto Ultrasonic-Echo (AU-E) and Ultrasound Technology ù Determination of the Lining and Cooling Element Condition of Operational Furnaces

    By A Sadri, S Smith

    In the metal and mineral industry, different empirical techniques are used to estimate the remaining thickness of the lining within an operating furnace. The disadvantage and costly factor when using

    Jan 1, 2006

  • AUSIMM
    Preparation of a JORC Code Compliant Resource Statement Based on an Evaluation of Historical Data – A Case Study from the Panguna Deposit, Bougainville, Papua New Guinea

    By P Collier

    From 1972 until 1989 when operations were suspended Bougainville Copper Limited (BCL, owned 53.58 per cent by Rio Tinto Limited) operated a large open pit mine and processing facility at Panguna on Bo

    Aug 22, 2011

  • AUSIMM
    Geometallurgy Data Management – A Significant Consideration

    By V Liebezeit

    Data management is a significant, but perhaps unrecognised, consideration for any organisation embarking on a geometallurgy program. While resource geologists are accustomed to dealing with thousands

    Sep 5, 2011

  • AUSIMM
    "Optimisation of Mining Policy Under Different Economical Conditions Using a Combination of Non-Linear Programming and Genetic Algorithm"

    By A Esfahanipour, M Osanloo

    Determination of cut-off grade?strategy is one of the most important stages of open pit mine planning and design. It is the parameter directly influencing the financial, technical, economic, legal, en

    Sep 26, 2011

  • AUSIMM
    Discrete Fracture Network Modelling – Importance of Accounting for Data Uncertainty and Variability

    By S Rogers, D Stead, E Eberhardt

    The last decade has seen a major increase in use of the discrete fracture network (DFN) approach applied to cave mining problems, often integrated within more complex geomechanical simulations. Becaus

    May 9, 2016

  • AUSIMM
    Design and Commissioning of a 40 Tonne per Day Flotation Concentrate Bio-Oxidation Treatment Plant at the Harbour Lights Mine

    By Carter A. J, Miller D. M, Holder N. H M, Van Aswegen P C

    The Harbour Lights Mine situated at Leonora in Western Australia, mines a refractory sulphidic gold ore. The main sulphide minerals are pyrite and arsenopyrite. Due to the association of gold with the

    Jan 1, 1992

  • AUSIMM
    Melbourne Main Sewer Project – Construction Phase – Soft Ground Tunnelling in the Yarra Delta

    By P Clark

    This paper discusses the challenges, solutions and lessons learnt as tunnelling work continues on the Melbourne Main Sewer Replacement (MMSR) project.The MMSR project is a $220 million dollar project

    Mar 8, 2011

  • AUSIMM
    Project Hobson – New Technology in Auckland

    By T Ireland

    The Project Hobson tunnel excavation was the first use in New Zealand of an earth pressure balance (EPB) tunnel boring machine (TBM). The tunnelling on the project was very successful and break-throug

    Mar 8, 2011

  • AUSIMM
    What do High Reliability Organisational principles look like in practice in Queensland mines?

    By M S. Tuohy

    Since the independent review of fatal accidents in the mining industry carried out by Dr Sean Brady (the ‘Brady Review’), High Reliability Organisations (HROs) and their operating principles have been

    May 5, 2022

  • AUSIMM
    Beyond NPV - A Review of Valuation Methodologies and Their Applicability to Water in Mining

    By D Brereton, C J. Moran

    In this era of rising focus on the social and environmental costs and benefits of mining operations, the valuation methodologies used to assess such impacts become increasingly important. Within an in

    Jan 1, 2006

  • AUSIMM
    Health, Safety and Sustainability

    By D Cliff, K Bailey

    Traditionally occupational health and safety (OH&S) has been managed for the direct benefits of reducing injury and illness to workers on mine sites. In the current skill shortage climate it is im

    Nov 20, 2012

  • AUSIMM
    Modelling of a æTrue-Belt SamplerÆ - A New Device for Sampling from a Conveyor Belt

    By R Steinhaus, D M. Frantois-Bongarton, P W. Cleary, G K. Robinson, M D. Sinnott

    Multotec Process Equipment and Dominique Frantois-Bongarton have a patent for a mineral sampling device, which they call a æTrue-Belt SamplerÆ. This uses a plough, which is rotated about an axis paral

    Aug 21, 2012

  • AUSIMM
    The impact of ventilation on demand on impeller fatigue life

    By L Salvestro

    Ventilation on demand (VOD) has been demonstrated to significantly reduce operating costs for ventilation fans, by reducing fan output to meet demand. The most effective method for reducing operating

    Oct 12, 2022

  • AUSIMM
    Progress towards Data-driven Mine Planning via a Virtual Geometallurgical Laboratory

    By E Vargas, A Egana, M Alarcon, X Emery, A Barberan, A Lopez, N Morales, C Friedrich

    "As the cost in time and money of data from sensors and small-scale tests has reduced, additional challenges have arisen. Although many mine data sets are not big relative to those in other discipline

    Jun 15, 2016

  • AUSIMM
    Mining for Water - Partnering for Sustainable Water Use in Semi-Arid Regions

    By N Lefebvre, M Jakeman, R Aseervatham

    Semi-arid regions suffer from two afflictions; evaporation may exceed precipitation by multiples of two or more and variations in precipitation can be both extreme and difficult to predict. Many Austr

    Jan 1, 2006

  • AUSIMM
    Open Cut Mine Machinery Automation – Going Beyond Global Navigation Satellite System with Locata

    By C Rizos

    Many of the ‘new paradigms in mining’ and notions of ‘sustainable mining’ have at their core the requirement for reliable, continuous centimetre-level positioning accuracy to enable increased automati

    Nov 22, 2011

  • AUSIMM
    The Re-opening of CSA Mine, Cobar NSW

    By M Scamardella

    The CSA Mine is located at Cobar, New South Wales, where it was in continuous operation from 1966 to the time it went into receivership on 29 January 1998. When it closed it was under the ownership of

    Jan 1, 2000