Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Geology of the Manto Verde Mine, Atacama Desert, Chile

    The Manto Verde mine is found in the coastal ranges of the Atacama desert, 1000 km north of Santiago,

    Jan 1, 1992

  • AUSIMM
    Evidence of Reduced Water Infiltration by Microhardpans û Electrical Resistivity Measurements at Pe±a de Hierro, Rio Tinto, Spain

    By M Furche, U Noell, C Grissemann, J A. Meima, T Graupner, A Romero-Baena

    The mining residues at the abandoned copper mine site Pe±a de Hierro, located at the headwaters of the Rio Tinto, contribute substantially to the pollution of the river with high loads of Fe, As, Pb,

    Jan 1, 2008

  • AUSIMM
    Development of a Theoretical Approach to The Heap Leaching of Copper Sulphide Ores

    Heap leaching of copper sulphide and oxide ores' has been conducted at Rum Jungle since the end of 1965.A review of operations was made and this led to an examination of some theoretical aspects

    Jan 1, 1969

  • AUSIMM
    Sulphide Oxidizing Bacteria of Copper Porphyry Ore

    By Ralph B. J, Sadler W. R

    Thiobacillus ferrooxidans was shown to catalyse biodegradation of chalcopyrite concentrates. The process was growth associated at normal temperatures (30°C) in dilute acid solution (pH2, H2SO4) i

    Jan 1, 1981

  • AUSIMM
    Improvements in the InLine Pressure Jig Expands its Applications and Ease of Use for Gold, Silver, Sulfide and Diamond Recovery

    By T Hughes

    The Gekko InLine Pressure Jig (IPJ) was unleashed on the World gravity separation market in 1996 and has since sold over 150 units in applications including tin, diamonds, silver, coal, garnet and gol

    Jan 1, 2008

  • AUSIMM
    The Effect of Delay Time on Fragmentation Distribution through Small- and Medium-scale Testing and Analysis

    By O Omidi, P D. Katsabanis

    The effect of delay time on fragmentation has been discussed for a long period but rarely in a satisfactory and unbiased way. Despite the efforts of many researchers, delay selection for fragmentation

    Aug 24, 2015

  • AUSIMM
    Volcanic Stratigraphy, Structure and Controls on Mineralization, Golden Cross Mine, New Zealand.

    By McOnie A. W, Rutherford PG

    A volcanic sequence is described from the Golden Cross Mine, Waihi, New Zealand. The sequence includes seven lithostratigraphic units comprising flow and pyroclastic units of Coromandel Group andesit

    Jan 1, 1995

  • AUSIMM
    Geological and Geotechnical Influences on Strip Mining Using In-Pit Bench Techniques

    By McManus D

    Situations where in-pit bench stripping methods are favourable are introduced. Examples from Peak Downs Mine are used as a guide to the range of methods available.A number of geological and geotechnic

    Jan 1, 1992

  • AUSIMM
    Notes on Ore Pulp Settlement and Filtration, In Cyanidation of Gold Ores

    This subject of paramount importance in many modern plants employed in the extraction of gold from ores by cyanidation, involves several considerations.With the old-type "slimes decantation"

    Jan 1, 1935

  • AUSIMM
    Petrology of the Broken Hill Lode and its Bearing on Ore Genesis

    LIST OF CONTENTSAbstractIntroductionSelected Sections of the Broken Hill LodeLocality PlansPetrology1. Zinc Corporation Mine: DDH. 5.98, section 30, No. 26 level2. Zinc Corporation Mine: DDH. 838, sec

    Jan 1, 1959

  • AUSIMM
    The Development of Instrumentation and its Impact on the Mineral Processing Industry

    The origins of instrument application in the Mineral Industry are discussed. Development of measurement techniques pertinent to the industry is described as is the early application of mini-computers.

    Jan 1, 1985

  • AUSIMM
    Ranking of Belt Conveyor Systems for Prefeasibility Study

    Prefeasibility planning and cost estimation of conveyor systems has historically been undertaken by comparing fi xed plant transport requirements to that of similar systems in service. This paper desc

    Dec 6, 2010

  • AUSIMM
    Some Aspects of Pillar Stability in Underground Coal Mines

    Working in thick coal seams presents many problems, included in these is obtaining the maximum recovery of coal under safe working conditions. In order to obtain maximum extraction it is important to

    Jan 1, 1989

  • AUSIMM
    Pressure Leaching of Thackaringa Cobalt-bearing Pyrite

    A massive cobalt-containing pyrite orebody occurs in banded albite-quartz-biotite rocks at Thackaringa, some 30 km SW of Broken Hill. Because of the world-wide shortage of cobalt during the late 1970s

    Jan 1, 1983

  • AUSIMM
    Gravity Anomalies of Costa Rica and their Relations to Crustal Structure and Mineralization

    By Case JE

    Complete Bouguer and isostatic anomaly maps compiled for Costa Rica provide new insights into the crustal structure and mineralization. Terrain corrections were approximated from the station to a

    Jan 1, 1987

  • AUSIMM
    The Epithermal Au and Porphyry Cu (Au) Relationship in the Western Pacific and Central Europe

    By J C. Carlile

    Many low sulphidation epizonal gold and zinc-lead vein deposits within magmatic arcs are situated on basement highs, and post-date both the main volcanic episode and porphyry copper (gold) mineralisat

    Jan 1, 1995

  • AUSIMM
    Notes on the Blair Athol (Queensland) Coal-Field

    THE following short paper on the Blair Athol coal-field will no doubt have a twofold interest to members from the fact that its main seam, known as the "Big Seam" of a maximum thickness of 9

    Jan 1, 1918

  • AUSIMM
    Application of Alluvial Gold Mineralogy to Exploration of the Central Ranges, Irian Jaya, Indonesia

    By K Palmer, G J. Artmont

    Alluvial gold is an ideal exploration tracer to bedrock source and indicator of bedrock mineralisation style because: (i) gold occurs in a wide range of deposit types, (ii) primary composition is sen

    Jan 1, 1995

  • AUSIMM
    Maintenance Performance Improvement - A Structured Approach

    By Grainger A, Dawkins G, Lysaght A, Kennedy R

    Maintenance management improvement projects were undertaken at several BHP Collieries Division mines pursuing.the objective of achieving better structured maintenance procedures. Efficiently structure

    Jan 1, 1991

  • AUSIMM
    Risk "Thinking" for Australian Tunnelling

    A paper presenting an overview of legislative and best practice approaches to the management of OHS&E and business risk for Australian tunnelling operations. Best practice can be achieved in

    Jan 1, 2008