Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Parallel Implementation of a Tabu Search Procedure for Stochastic Mine SchedulingBy R Dimitrakopoulos, R Senécal
This paper presents a metaheuristic solution to the optimisation of open pit long-term production scheduling with a stockpile and geological uncertainty. The optimisation formulation is a two-stage st
Nov 24, 2014
-
Maturity of Jurisdictional Abandoned Mine Programs in Australia Based on Web-accessible InformationBy C J. Unger, A M. Lechner, A Walton, V Glenn, M Edraki, D R. Mulligan
In Australia, responsibility for abandoned mines can be unclear. With a few exceptions, state and territory governments have become responsible for abandoned mines on Crown land and private landholder
Jul 16, 2014
-
Towards a mining metaverse – spatial computing meets digital twins for remote operationsBy M Yahyaei, P Knights, M S. Kizil, J Qu
Digital Twins (DTs) are transforming business operations across many industries through their accurate representations of physical entities enabled by IoT technologies.
Sep 1, 2024
-
Innovative Victoria Park Tunnel design is Communicated Effectively to Stakeholders with the Aid of Three-Dimensional Visualisation MediBy M Sparrow
The Victoria Park Tunnel project is an inner-city alliance project in central Auckland, New Zealand. The existing two-directional viaduct will be modified to single-direction flow, and a new northboun
Mar 8, 2011
-
Flotation as an Operation of Macromolecular Mass TransferBy M R. Drumond
The present work presents a new theoretical interpretation of the flotation process, which can also be applied to other mineral processing physical unit operations. This interpretation is part of the
Jan 1, 2005
-
The Implementation of Paste Fill at the Henty Gold MineBy C Woodall, G Jardine
The Henty Gold Mine, located in Western Tasmania uses innovative solutions to effectively manage a mining operation in an environmentally sensitive setting and has been presented with several environm
Jan 1, 1998
-
The Use of Gravity as an Exploration Tool for the Robertson Range and Davidson Creek Iron Ore Deposits, East PilbaraBy R McCarthy, P Darvall
FerrAus Limited's Robertson Range and Davidson Creek iron ore projects are located on the far eastern margin of the Hamersley Province, approximately 100 km to the east of Newman, Western Austral
Jan 1, 2009
-
The Marvel Loch Crusher Product Sampling SystemThe Marvel Loch Operations (MLO) plant was treating ores from up to six MLO sources and in addition needed to blend externally sourced ores with its own ores. This presented a metallurgical accounting
Mar 1, 2010
-
"The Biogeometallurgical Approach – the Information We Need to Increase the Sustainability of Mining"By B Dold
"Mining has still today high potential for improvement in the exploitation efficiency. Especially low-grade ores have very low recoveries. In Cu bioleaching operations from porphyry copper deposits ex
Jun 15, 2016
-
Development of an acQuire Based Geotechnical Data Management SystemBy V Pere
A geotechnical data management system has been developed to manage drillhole and mapping data generated from in house and consultant administered field programs. This system comprises a data collectio
Aug 22, 2011
-
The Implementation of Paste Fill at the Henty Gold Mine (e808b65b-096a-41b0-a461-dc39eb272114)By Jardine G, Woodall C
The Henty Gold Mine, located in Western lasiuania use, uuiusatise solutions to effectively manage a mining operation in an environmentally sensitive setting and has been presented with several envir
Jan 1, 1998
-
The Application of the Floatability Characterisation Test Rig (FCTR) in Flotation ResearchBy J-P Franzidis
Mill operators have traditionally been forced to rely on grade-recovery curves and overall flotation rate constants when analysing proposed improvements to plants. This has led to loss in money and ti
Jan 1, 2000
-
Influence of Vertical Pile Loading on Existing Tunnel Lining in Soft ClayBy R Ayothiraman
Tunnel excavation may induce adverse effects on nearby existing structures/foundations in urban areas. Accurate prediction of tunnelling effects on pile foundations of nearby structures in the urban e
Mar 8, 2011
-
Flotation Process Control Optimisation at Prominent HillBy J Lombardi
OZ Minerals' Prominent Hill copper-gold concentrator is located 130 kilometres south east of the town of Coober Pedy in the Gawler Craton of South Australia. The concentrator was built in 2008 an
Aug 8, 2011
-
Pillar Extraction at the Doe Run Company, 1991-1998 (82799d0e-2b30-4c7e-911c-ac1c973112a1)By Yanske TR, Lane WL
The Doc Run Company and its predecessors have been mining for over 130 years utilising the room and pillar mining method. This method has left approximately 20 per cent of the orebody in the remaini
Jan 1, 1998
-
Dynamic Interpolation – Estimation in a Folded Environment at the Cosmo Deposit, Northern Territory, AustraliaBy A Finch, C Pridmore
The Cosmo Project falls within the Archaean to Palaeo-Proterozoic Pine Creek Orogen, one of the major mineral provinces of Australia.The Cosmo Deposit is interpreted to be a series of steep north-west
Aug 18, 2014
-
Full PSD rejects shear strength testing for co‐disposal and assisted tailings dewatering technique selectionBy G Burton, S Fityus, J Li, S Vaughan, D Payne
Daunia and Caval Ridge coal mines, owned and operated by BHP, have been co-disposing rejects and dewatered tailings within spoil dumps from the beginning of their operations in 2013 and 2014, with the
Jul 1, 2021
-
Resource Evaluation of Nuggety Slate-Hosted Gold-Quartz ReefsBy A E. Annels, G F. Johansen, B W. Cuffley
Nuggety gold-quartz reefs are characterised by localised, high-grades and in many cases coarse free-gold. Geometrical and grade complexities are often observed. The high-grade regions are generally er
Jan 1, 2000
-
Improving the Reliability of Stream Diversion Designs in Mine Closure Plans Using a Morphological ToolBy S Tjerry, S Szylkarski, B Willis-Jones, I Dubinski
Achieving relinquishment of mining sites is becoming increasingly difficult, with a study by Byrne (2013) estimating that out of a set of 73 mining and metals sites around the world, less than ten per
Jun 28, 2016
-
Leveraging Accuracy and Precision ù Multi-Phase Mass Balancing and Reconciliation as a Tool for Quality Data ManagementBy M Dunglison, P M. Cameron
Simultaneous mass-balancing of a mineral processing flow sheet results in adjustments to each data point that reflects the accuracy and precision across the full set of data. In this way, all the good
Jan 1, 2005