Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Issues in Capital Raisings and DisclosureBy B Dodd
This paper details how the Australian Securities and Investments Commission (ASIC), as a disclosure and conduct regulator, approaches regulation of continuous disclosure, capital raising and control t
Nov 20, 2012
-
Geothermal gradient determination for ventilation and air conditioning modelling at Malmberget MineBy F K. R Klose
Malmberget is a sublevel caving mine owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB), a Swedish state-owned iron ore mining company, in northern Sweden. The mine has an annual iron or
Oct 12, 2022
-
Mineral Resource Modelling and Reconciliation in Ultra Deep Underground Gold MinesBy R C. A Minnitt
The Witwatersrand Supergroup is host to the world’s largest gold deposits. The location, quantity, grade, continuity and other geological characteristics of a Mineral Resource are either known, estima
Aug 22, 2011
-
Mine Shafts – Planning, Optimising and ConstructingBy D J. Kilkenny
Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq
Mar 21, 2011
-
The Queensland Great Artesian Basin Water Resource PlanBy A McKay
The Great Artesian Basin (the Basin) is a large aquifer system underlying more than 20 per cent of continental Australia and most of Queensland. The aquifers of the Basin are an important water source
Jan 1, 2006
-
Driving Mine Performance through CommunicationBy S Jeffrey, S Mundell, F Arboleda
In the current cycle of low commodity prices and rising costs, mine managers continue to focus on optimising mine performance and productivity. A critical component of strengthening performance and pr
Jun 22, 2016
-
Taxonomy of Interactive Computer-Based Visualisation Systems and Content for the Mining Industry û Part OneBy C Caris, K Fowle, M Schmid, E van Wyk, D Schofield, A Squelch, M S. Kizil
This paper has been written collaboratively by members of the International Mining VR Group. It is the first of a series of papers. Mining in the 21st century is a high technology industry that strive
Jan 1, 2008
-
Geometallurgical Modelling and Ore Tracking at Kittilä MineBy M Wortley, J Korteniemi, D La Rosa, L Rajavuori
Geometallurgical modelling of an orebody provides benefits to a mine by gaining a better understanding of the ore characteristics and how they affect the performance of the concentrator. With this kno
Nov 24, 2014
-
Safety and Financial Value Created by Good Slope Management Strategies and TacticsBy A R. Bye, T R. Stacey
Anglo PlatinumÆs Potgietersrust Platinums (PPRust) operates three open pits and plans to excavate 90 Mt of rock in 2007. With pit slopes expected to reach a height of 400 m, the geotechnical departmen
Jan 1, 2007
-
A machine learning model to predict non-metallic inclusion dissolution in the metallurgical slagBy C Xuan, J H. Park, Q Wang, C Shen, D Kumar, W Mu
Dissolution of non-metallic inclusions in the metallurgical slag is of vital importance for cleanliness control of the steel manufacturing. With the development of high temperature confocal laser scan
Jun 19, 2024
-
Risk Assessment in Mine Rehabilitation Planning: Using the Option of an Above Ground Tailings Containment at Ranger Uranium Mine as an ExampleBy Riley S. J
Ranger Uranium Mine is located within the Alligator Rivers Region of the Northern Territory of Australia and surrounded by the World Heritage listed Kakadu National Park (Figure 1). The mining oper
Jan 1, 1994
-
Soft Computing Approach to Predict Blast-induced FlyrockBy N Gupta, R Trivedi, S Bhandari
Managing blasting operations in four mines surrounded by villages is a challenging task. This study aims to compare the blast-induced flyrock as observed in opencast mines by predicting flyrock distan
Aug 24, 2015
-
Fire Modelling in Underground Mines using Ventsim Visual VentFIRE SoftwareBy D J. Brake
The risk from fire remains one of the most serious of underground mine disaster scenarios. The impacts of mine fires on the underground ventilation system and the production of toxic gases have been d
Jul 1, 2013
-
Collaboration and change management, keys to successful automation implementationBy D Kilkenny, D Nardini, P Kline
This paper is a case study highlighting learnings and success in two areas challenging underground miners: change management and collaboration. It examines the implementation process of a new automate
Mar 15, 2021
-
Non-Destructive Testing of In Situ Underground Mine Seals - Initial Technology AssessmentBy C Harwood, EáWestman, K Luxbacher
Testing of in situ seals in underground coal mines is critical to determine seal integrity and to provide safe working conditions. In the wake of the 2006 Sago Mine explosion, the United States of Ame
Jul 1, 2013
-
Sampling Quality Assurance and Quality Control Requirements for Mining ProjectsThe creation of an accurate and precise enough database requires the collection of many representative samples, subsampling and assaying them without destroying their integrity. The selection and impl
Mar 1, 2010
-
Design for Tunnel Fire Life Safety – Working Together in the New Zealand ContextBy E Claridge
There are a number of major infrastructure tunnelling projects currently underway or proposed in New Zealand, including construction of new road and rail facilities and the refurbishment of existing r
Mar 8, 2011
-
Resource and Reserve category inflation – known rewards, hidden risksBy M Bond, R R. Hargreaves, G W. Booth
There are numerous causes of speculative mineral resource and reserve inflation. Traditionally, these are linked to issues of data accuracy or misinterpretation, the use of overly optimistic estimatio
May 24, 2023
-
Innovation in mining – a contractor’s roleBy D Kilkenny
Underground contractors in the mining industry must be prepared to take a position at the forefront of innovation of equipment and work methods in order to maintain a competitive advantage over in-hou
Oct 16, 2017
-
Maldon to Dombarton Rail Link – Design Development of the Avon TunnelBy A Bagis, T Baker
In 1983 the New South Wales (NSW) Government began to construct a 35 km freight rail line to provide additional rail capacity to Port Kembla in the Illawarra region, south of Sydney, through a direct
Sep 17, 2014