Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Design of Air-Blast Plugs for a Sublevel Caving Operation

    The Telfer Underground sublevel cave (SLC) Operation is located approximately 850 m below surface. The cave was designed to propagate through an old decline which was initially used to monitor the cav

    Nov 25, 2010

  • AUSIMM
    Sulphuric Acid: The Chamber Process Under Tropical Conditions.

    THOUGH the literature on the chamber process is considerable, it mostly refers to European conditions. Owing to the demand for acid for flotation and leaching at the mine, it may be necessary to work

    Jan 1, 1920

  • AUSIMM
    Using X-Ray Diffraction for Grade Control and Minimising Environmental Impact in Iron and Steel Industries

    By U König

    The use of high speed detectors made X-ray diffraction (XRD) an important tool for quality and process control in the mining industries. Besides knowledge about the mineralogy of a sample it provides

    Jul 11, 2011

  • AUSIMM
    Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal Reefs

    By J J. Laas, A J. S Spearing

    Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Vaal

    Jan 1, 1998

  • AUSIMM
    Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal Reefs (Minefill '98)

    By Laas JJ, Spearing AJS

    Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Va

    Jan 1, 1998

  • AUSIMM
    Productive Partnership – Controlling Vibration and Maintaining Critical Electricity Supply

    By M Nagarajan

    Orica Mining Services (Orica) in partnership with Coal and Allied’s Hunter Valley Operations (HVO) has developed a risk management process to maximise mining efficiency whilst controlling vibration an

    Nov 8, 2011

  • AUSIMM
    The "Indicator" Feature in Some Gold Occurences

    A way back in 1851-2 an army of diggers had commenced the conquest, of the now famous goldfields of Australasia. At that time, and in the Colony of Victoria, more that 10,000 were camped on and around

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine using Cement Stabilisation

    By P R. Lock

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 km north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦ eas

    Jan 1, 1998

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine Using Cement Stabilisation (484a6aa7-9c11-440d-b7e3-51e52370c111)

    By Lock PR

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 kin north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦

    Jan 1, 1998

  • AUSIMM
    Application of steel bollards for managing the hazards associated with open stopes, Waihi Underground Operations

    By C E. Gawith

    The Waihi underground mining operation currently mines epithermal veins ranging from two metres up to ten metres in width using a ‘Modified Avoca’ stoping method. This method consists of longhole benc

    Mar 15, 2021

  • AUSIMM
    Use of Robust Design Methodology for Production Scale Definition in Open Pit Mining

    By M A. González, J A. Romero, D L. Fuentes, C J. Poblete, O Abdrashitova

    "Robustness can be defined as the ability of a system to resist change without adapting its initial stable configuration. Robust design methodology, which is widely accepted in the manufacturing indus

    Nov 15, 2016

  • AUSIMM
    New Innovations in Field Portable X-Ray Fluorescence for the Iron Ore Industry

    By S Bailey

    In-field sampling programs generally take time, equating to money, and unless you have an onsite laboratory, you have the issue of having to wait long periods for your data. Until recently, field port

    Jul 11, 2011

  • AUSIMM
    A New Semi-automated Method to Rapidly Evaluate the Processing Variability of the Orebody

    By J Jackson, K Nguyen, A Nguyen, E Manlapig

    "With the recent advancement in drill core imaging systems, a large volume of high resolution drill core images can now be rapidly collected and mineralogically classified. This paper introduces a nov

    Jun 15, 2016

  • AUSIMM
    Comparison of two quantitative mineral resource classification methods – a case study from a large copper porphyry-skarn deposit

    By C Artica

    Two quantitative methods for Mineral Resource classification have been applied to a copper skarn deposit beneath a large open pit that is mining a world-class porphyry complex. A drill hole spacing st

    May 24, 2023

  • AUSIMM
    Improving Excavation Efficiency at the St Helena Tunnel Using Best Practice Drill and Blast Techniques

    By D Miller, M Dowling, R Domotor

    "This paper is focused on blasting activities undertaken as part of the Pacific Highway Upgrade – Tintenbar to Ewingsdale – project (T2E). This is a ‘priority 1’ Pacific Highway road construction proj

    Sep 17, 2014

  • AUSIMM
    George Fisher Mine - Feasibility and Construction

    By G S. B Karunatillake

    Following a pre-feasibility study, Mount Isa Mines commenced a feasibility study on the deposit of the George Fisher Mine in May 1997. Board approval was granted in May 1998 to construct a 2.5 million

    Jan 1, 2000

  • AUSIMM
    A Case for Change - Defining Mine Sealing and Understanding Flammable Mixtures During Sealing

    By A Mackay

    As a result of the explosion in the 512 panel at the Moura No 2 mine in 1994 the role of the ventilation officer (VO) to submit sealing plans (on behalf of the operator/underground mine manager) has b

    Jul 1, 2013

  • AUSIMM
    Making Design and Construction Work

    By S Porter

    The Melbourne City Link Project is a privately funded road infrastructure project linking three significant existing freeways in the vicinity of the Central Business District. The State Government, th

    Jan 1, 1999

  • AUSIMM
    Setting new standards at Kanmantoo – effective grade control procedures

    By M Reid, H Arbon

    Hillgrove Resources (HGO) commenced open pit mining in 2011 and from 2011 to 2016 the geology team experienced a consistent negative reconciliation between grade control estimated copper (Cu) grade an

    Sep 20, 2017

  • AUSIMM
    Precharging in previously preconditioned ground

    By E Hawkins, S Sheldon

    Block caving is becoming a more widely adopted mining method allowing for underground massive low grade orebodies to be extracted economically. Underbreak during cave propagation is difficult to predi

    Mar 15, 2021