Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Semi-automated Geological Interpretation Using Assay and Infrared Spectroscopic Sensing Parameters towards Improvements in Geological Modelling

    By F Flitti, M Haest, O Dominguez, D Mittrup, G Hird

    The automated geology interpretation (AGI) tool has been developed in BHP Billiton to automate stratigraphy logging of drill holes, using any available quantitative data sets. At present, AGI is set-u

    Jul 13, 2015

  • AUSIMM
    Development of an Integrated Platform for the Analysis, Modelling and Design in Panel Caving Mines

    By G Pizarro, O Miranda, D Rosales

    In panel/block caving mines, large amounts of information are collected at the operations. This information includes grades and extracted tonnage, fragmentation, lithology, design of stopes and main i

    May 9, 2016

  • AUSIMM
    The Path to Best Practice at Geita Gold Mine

    By M Monaghan, B S. Gregory

    The Geita Gold Mine is located 80 km southwest of the town of Mwanza in the north-west of Tanzania and is 100 per cent owned by AngloGold Ashanti Limited. Open pit mining commenced at Geita in 2000. I

    Sep 18, 2012

  • AUSIMM
    Making Hard Rock In Situ Recovery a Reality

    By P Breuer, D J. Robinson, A McFarlane, L L. Kuhar

    Increasing global demand for commodity metals and capital and the greater operating costs of mining and metal production present significant challenges for the metals mining industry. Current conventi

    Nov 4, 2015

  • AUSIMM
    The Grande Côte Mineral Sands Project

    By M C. Ackland

    The Grande Côte Mineral Sands Deposit (GCMSP) is located on a coastal mobile dune system in Senegal on the west coast of Africa. Senegal is a stable, democratic republic, having gained its independenc

    Oct 5, 2011

  • AUSIMM
    Ambuklao Tunnel Plug Construction

    By B Hayes

    The Ambuklao and Binga Rehabilitation Project is a 175 MW hydro power project currently under construction across dual sites in the north region of Luzon Island, Philippines. When it was built in 1956

    Mar 8, 2011

  • AUSIMM
    Hydrogen reduction of as-received and pre-oxidised NZ titanomagnetite ironsands in a small-scale high-temperature fluidised bed

    By B J. Monaghan, R J. Longbottom, S Prabowo, D Del Puerto, B Maisuria, C W. Bumby

    The use of hydrogen as a reducing agent can substantially reduce carbon dioxide (CO2) emissions from the ironmaking process. Iron ore fines can be reduced in a fluidised bed (FB) using hydrogen (H2) a

    Sep 18, 2023

  • AUSIMM
    Estimation of rock brittleness for jointed specimens under cyclic triaxial loading

    By P Khalkho, M Singh

    Rock masses when subjected to uniaxial or triaxial cyclic loading (eg in hydraulic running tunnels, during retrieval and injection of oil and gas from storage underground caverns and haulage roads), t

    Nov 29, 2022

  • AUSIMM
    The Influence of Molecular Structure of Ampholytic Polymers on their Behaviour and Flocculation Activity in Sedimentation Processes

    By Hoberg H, Schneider FU

    The stability of suspensions can frequently be controlled only by the use of supplementary polymeric agents. Such methods date back to the time of the ancient Egyptians, who used natural rubber as

    Jan 1, 1993

  • AUSIMM
    Advances in the New Zealand Coal Industry

    By T King

    This paper reviews the changes in the coal industry over the past 30 years and attempts to predict the trends over the next ten years. The last 30 years have seen a steady concentration of production

    Jan 1, 1997

  • AUSIMM
    Molecular modelling applied to the flotation of iron ores

    By M Badawi, Y Foucaud, C Veloso, J Laine, A C. Araujo

    Iron is one of the most exchanged commodities worldwide. Its use for steelmaking explains the growing demand in the metal which remains mainly produced by the mining and the beneficiation of iron ores

    Nov 8, 2021

  • AUSIMM
    Modelling Full-scale Blast Heave with Three-dimensional Distinct Elements and Parallel Processing

    By A Tawadrous, B Wheeler, D S. Preece, S A. Silling

    The two key results of rock blasting are fragmentation and movement of geomaterials. Movement/flow of the blasted rock is often referred to as heave. Moving rock with explosives rather than mechanical

    Aug 24, 2015

  • AUSIMM
    Relocatable modular beneficiation creates value from waste

    By T Graham

    Traditional iron ore wet beneficiation plants are large multilevel structures, often integrated into centralised processing plants. They are characterised by sizeable footprints, substantial water and

    Jul 24, 2017

  • AUSIMM
    "Sampling and Test Work Protocol Development for Geometallurgical Characterisation of a Sheeted Vein Gold Deposit"

    By Y Xie, L O’Connor, S C. Dominy

    "Sheeted vein gold deposits are characterised by multiple subparallel veins and free milling gold. In situ heterogeneity of mineralisation results in grade and process parameter variability, which wil

    Jun 15, 2016

  • AUSIMM
    Automated joint mapping using the concentric shells algorithm

    By P Valenzuela

    Joint mapping is a fundamental input for rock mass characterisation and slope stability analysis. The usual way to do it is using a compass in the field or digitising structures on a screen, with a so

    Sep 20, 2017

  • AUSIMM
    Fly-In, Fly-Out in the Western Australian Resources Sector û Trends in Responsible Management

    Western Australia has often been referred to as the fly-in, fly-out capital of the world. Fly-in, fly-out is a commonly used practice in Western Australia due to the geographic size and isolated locat

    Jan 1, 2008

  • AUSIMM
    Longwall Mining beneath Critical Infrastructure – Prediction versus Performance of the Cataract Tunnel, New South Wales, Australia

    By T J. Sullivan, H Pinkster, G Swarbrick

    From 2002 to 2006, longwall mining was undertaken directly beneath the Cataract Tunnel, which is a 100-year-old, heritage-listed tunnel in Hawkesbury Sandstone responsible for delivering 20 per cent o

    Nov 5, 2014

  • AUSIMM
    A Statistical Approach for Deriving Project Design Rainfall

    By R Millar

    A frequent challenge in mine water management and mine design is estimation of precipitation and extreme rainfall given a short record of site meteorological data. For remote mine projects, typically

    Nov 26, 2013

  • AUSIMM
    Carrapateena Vent Rise Performance – Geotechnical Design and Calibration

    By G Balog, T Ormerod, D Sidea

    Carrapateena is a copper-gold sub level caving operation located in the Gawler Craton, South Australia. One of Australia’s largest undeveloped copper deposits, the project will be a 4.25 Mtpa undergro

    Mar 15, 2021

  • AUSIMM
    Philex Gold Philippines, Inc's Bulawan Mine - The Philippines Largest Primary Gold Producer

    By Anievas JB, Sevillano AC

    This paper describes the acquisition, exploration, development, initial operation and subsequent financing of the Bulawan mine by means of a listing on the Toronto Stock Exchange of a subsidiary of th

    Jan 1, 1997