Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Planning for the Expected Amount of Variation to be Acceptable

    A good blending system is one that ensures that a plant can cope with the amount of grade variation that it will encounter. Prediction of amounts of variation that will be encountered on time or tonna

    Mar 1, 2010

  • AUSIMM
    Comparison of risk register quality and consistency using causal network topology analysis

    By Y Lin, B J. Seligmann, M Hassall, S Micklethwaite

    For multi-site mining companies, checking the quality and consistency of the data recorded in risk registers is important for confirming how well mine safety management systems have been implemented.

    Apr 16, 2024

  • AUSIMM
    Theoretical Analysis of the Countercurrent Gas-Solid Heat Transfer During the Drying of Brown Coal Briquettes with Circulating Gas

    By Sharpin P. C

    The countercurrent gas-solid heat transfer during the drying of brown coal briquettes in the pilot carbonization plant at Morwell has been analysed and theoretical gas and solid temperature distributi

    Jan 1, 1966

  • AUSIMM
    The Behaviour of a Flame Safety Lamp in a Methane Coal Dust Air Atmosphere

    By Osborne V. J, Urbank W

    An explosion occurred at Moura No. 4 underground coal mine in Queensland on 16 July 1986 and resulted in the loss of 12 lives. The official report of the accident concluded that the most likely so

    Jan 1, 1988

  • AUSIMM
    An Approach to High Solids Slurry Pipeline Design

    By M Griffiths

    This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she

    Aug 8, 2011

  • AUSIMM
    Some Notes on Diamond Drilling Practice at Mount Isa

    The Black Star lead and zinc ore-bodies, situated in the western zone of mineralisation at Mount Isa occupy an area 2000 ft. long with varying widths from 100 ft. to 300 ft. The strike is N5°W, a

    Jan 1, 1932

  • AUSIMM
    The Complexity of Material Cycle Simulation and Design ù Co-Incineration

    By G P. J Dijkema, M A. Reuter

    From a material cycles perspective all processes are interconnected and consequently a process can never be evaluated as an isolated and independent unit. This also holds true for the evaluated co-inc

    Jan 1, 2000

  • AUSIMM
    Gippsland Basin Exploration: Recent Results and Outlook for Australia's Oldest Producing Offshore Area

    During the period 1981 - 1991, Esso Australia and their Joint Venture partners have discovered about 180 MB of liquids (crude and condensate), 60 MB natural gas liquids and 800 - 1000 GCF of gas. A

    Jan 1, 1992

  • AUSIMM
    Innovations in underground hard rock operator efficiency – through simulation-based training technologies and processes

    By J A. de la Torre, I R. Cerna, G K. Karadjian

    The La Colorada underground mine in Zacatecas, Mexico is a mechanised cut-and-fill silver mine with a capacity of 1250 t/d. The project focused on training the mine’s experienced operators for a fleet

    Oct 16, 2017

  • AUSIMM
    The Application of the Environmental Assessment Procedures to Licensing for Minerals, Petroleum and Geothermal Energy

    By D Thorburn

    This paper reviews the history of environmental assessment in New Zealand with reference to mineral developments. Emphasis is given to larger more controversial projects particularly metal mines. The

    Jan 1, 1990

  • AUSIMM
    The Wonawinta Silver Project – Value Engineering at Work

    By P G. Greenhill

    The Wonawinta silver project near Cobar in NSW is under development by Cobar Consolidated Resources Limited (CCR). RMDSTEM Limited is part of the owner’s team for feasibility, design, engineering, con

    Aug 8, 2011

  • AUSIMM
    Topsoil Management for Long-term Mine Operation and Closure – A Case Study from Alcoa's Bauxite Mining Operations in South-west Australia

    By A Grigg, L Hackett

    Alcoa operates two bauxite mines at Huntly and Willowdale, located within the jarrah forest south-east of Perth in Western Australia. Ore reserves are shallow but extensive, and mining pits averaging

    Jul 16, 2014

  • AUSIMM
    Official Opening and Address

    Good morning. I am very pleased to be invited to present the Opening Address to this inaugural New Zealand Minerals & Mining Conference. It is indeed a pleasure to see so many representatives of t

    Jan 1, 1997

  • AUSIMM
    Caijiaying Dry Tailings Storage

    By R Jia, J T. Waldram

    "The Caijiaying lead zinc mine is located in China, north-west of Beijing, in Hebei Province. The region experiences severe winters, below -35°C, and warm summers, up to 30°C. The mine and con

    Oct 10, 2016

  • AUSIMM
    Strategic mine schedule optimisation

    By A Tsoy

    This abstract describes long-term mining schedule optimisation approach that may be suitable for complex marginal projects and is based on modern scheduling techniques. CITATION: Tsoy, A, 2018. Strate

    Nov 21, 2018

  • AUSIMM
    Road Haulage of Ore by Peko Mines N.L.

    With the proving of a mineable orebody at Orlando in May 1961, Peko Mines N.L. was faced with the decision of whether to mill the ore on site or to haul it 25 miles to central facilities at Peko. Orla

    Jan 1, 1966

  • AUSIMM
    Paper No. 172. An Automatic Electrical System For Indicating The Position of ôChairsö in Shafts.

    SEVERAL serious accidents, which had occurred owing to the platman leaving the plat without first withdrawing the "chairs" from the shaft, set the writer scheming to devise a mechanically op

    Jan 1, 1909

  • AUSIMM
    Structural Geology of the Emily Ann Nickel Deposit and Implications for the Mining Process

    By R Buerger, D Barrett, P Hodkiewicz

    The Emily Ann nickel mine is owned and operated by LionOre Mining International Ltd. The deposit was discovered during 1997 and is blind, concealed beneath 25 m of transported cover and a further 100

    Jan 1, 2003

  • AUSIMM
    Geochemical and Isotopic Constraints for High-Grade Gold Mineralisation at Waitangi Deposit, Thames District, Coromandel Peninsula, North Island, New Zealand

    By S Henderson

    The Thames gold-silver deposits are part of the Hauraki goldfield, situated within the Miocene to Pliocene calc-alkaline Coromandel Volcanic Zone (CVZ). The Waitangi vein system is one of the minerali

    Jan 1, 1993

  • AUSIMM
    Firedamp Drainage Installations

    Firedamp drainage has become an essential part of many mine environmental systems, and new applications are arising. Installations are evolving further to satisfy ever changing basic requirements,

    Jan 1, 1982