Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    High Pressure Filtration of Fine Practice Slurries

    Using normal low pressure filtration methods for the dewatering of fine china clays, the best that can be achieved is cakes with about 30% moisture. In order to get the moisture levels down to acce

    Jan 1, 1989

  • AUSIMM
    When Nothing is What You Need – The Importance of Using Blanks at All Stages of Sample Preparation

    By J Webb

    "It is vitally important in projects where the cut-off grade is low that there is no contamination during the sampling and sample preparation process, both in the ore and the waste zones. Failure to i

    Jul 29, 2014

  • AUSIMM
    Oxidative combustion law of water soaked coal under oxygen-lean condition

    By H Y. Niu

    The coal left in the goaf is easily submerged by groundwater damage. During the mining process of the underlying coal seam, it is necessary to drain the water in the overlying goaf. The coal sample is

    Oct 12, 2022

  • AUSIMM
    In-pit In Situ Recovery – a New Approach That May Allow for Increased Value Extraction before Pit Closure

    By D J. Robinson, L L. Kuhar

    "Regardless of orebody value, at some stage, the pit will reach a depth where the reward for mining wider and/or deeper is not justified by the anticipated returns. ‘Last-blast’ strategies may help to

    Nov 15, 2016

  • AUSIMM
    Presentation of the Institute Medal, 1976 to Laurence Charles Brodie-Hall, C.M.G.

    ADDRESS BY THE PRESIDENT OF THE INSTITUTE (MR. J. G. SYMONS) IN PRESENTING THE MEDAL TO LAURENCE CHARLES BRODlE-HALL, C.M.G.The Institute Medal is awarded to a select band of people who have rendered

    Jan 1, 1977

  • AUSIMM
    Using Reliability Modelling to Confirm Plant Design Capacity

    By B R. Olsson, N Marinopoulos

    To establish the design and the capacity of the Stanwell Magnesium Plant, Australian Magnesium Corporation Ltd (AMC) with Fluor Australia has modelled the operation of the magnesium plant using ARENA

    Jan 1, 2002

  • AUSIMM
    Modern Management Systems for Higher Margins (9e634b58-ddc4-405d-b601-7ec0179e347f)

    Maximising margins in today's competitive international commodity markets demands superior productivity. This requires more than selecting the best equipment. It requires continually improving th

    Jan 1, 1998

  • AUSIMM
    Renison Internal Shaft Materials Handling System

    By N Fullelove

    The Renison Bell Tin Mine on the West Coast of Tasmania has recently installed a new underground ore handling system incorporating underground crushing, conveying and hoisting facilities. Contracts fo

    Jan 1, 1998

  • AUSIMM
    Fluidized Bed Roasting of Copper Concentrates

    By Urie R. W

    Fluidized bed roasting of copper concentrates from Mt. Morgan, Mt. Lyell, Mt. Isa, and Peko was performed in a 3 ft 6 in diameter, slurry fed, pilot plant roaster operated under autogenous conditions

    Jan 1, 1961

  • AUSIMM
    The Determination of Silver in Lead Sulphide Concentrate by Atomic Absorption Spectroscopy

    By Greaves M. C, Amos M. D

    A study was made of the instrumentation and technique of atomic absorption spectroscopy developed by Walsh of the Commonwealth Scientific and Industrial Research Organisation (C.S.I.R.O.), Australia.T

    Jan 1, 1961

  • AUSIMM
    Considering the action of water quality on the electrochemical response of Galena

    By K C. Corin, N Ndamase, M Tadie

    Mining operations in arid regions are compelled to reduce their consumption of fresh water. Closed water circuits are an attractive solution and, in addition to reducing freshwater consumption, have t

    Aug 24, 2022

  • AUSIMM
    The Contribution of Cemented Backfill to Heat Loads in Mines

    By A Hewitt

    Portland cement is the chief binding ingredient in mine backfill. In the presence of water, the chemical compounds within portland cement hydrate causing hardening and strength gain. During hydration,

    Jan 1, 2005

  • AUSIMM
    Aspects of Incremental Sampling and Samplers

    Incremental sampling is defined as a solution to fight segregation, the theory is demonstrated and theoretical and practical aspects are discussed. The number of increments necessary for successful sa

    Mar 1, 2010

  • AUSIMM
    The Practice of Porphyry Copper Deposit Estimation for Grade and Ore-Waste Tonnages Demonstrated by Several Case Studies

    By Dagbert M, Belisle J. M

    Several packages for the estimation of porphyry type deposits exist and produce acceptable results. Recently, however, the need for really trying to obtain maximum information from drill holes has

    Jan 1, 1977

  • AUSIMM
    Furnace Design for Modern, High-Intensity Pyrometallurgical Processes

    By B, J Bianchini, N Voermann, C Crowe

    Operational and economic imperatives in the metallurgical industry have led to numerous advancements in furnace design. Modern furnaces provide high production rates, high percentage online time, long

    Jan 1, 2002

  • AUSIMM
    Changes in the Provision of Design Services Resulting from the Market Reform Process, Victorian Brown Coal Industry

    By Seymour D

    The disagregation and privatisation of the mining and power gene ration operations of the former State Electricity Commission of Victoria has being taking place over the past five years. This has tr

    Jan 1, 1997

  • AUSIMM
    Setting for Success – Private Equity Exploration and Mining Project Buy-in to Listing and Divestment

    By A Keogh, P Allen, P Stoker

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Private equity (PE) firms are comparatively free of mandatory requirements for the level an

    Mar 18, 2015

  • AUSIMM
    Don't be Afraid to Evolve

    The AusIMM came into being to foster the spread of professional knowledge within its client industry. It has evolved along with the Australian mining industry for more than a century. If the AusIMM

    Jan 1, 1994

  • AUSIMM
    A Comparison of Two Methods for Calculating the Constants K and Alpha in a Broken Ore

    By R Minnitt

    Two methods of calibrating the parameters K and Alpha for use in Gy’s formula for the fundamental sampling error were investigated. Approximately 480 kg of broken ore from Harmony’s Target gold mine i

    Jul 29, 2014

  • AUSIMM
    Opportunities for the New Zealand Coal Industry

    Thank you for this opportunity to address your conference on 'The role of coal in the New Zealand energy market'. New Zealand's energy market has, in common with much of New Zealand, un

    Jan 1, 1990