Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Determining ventilation system model inputs from field test work in the oil shale mine

    By S Sabanov

    Determining ventilation system model inputs from the field test work has been produced in the working oil shale mine which has been in production since the early 1970s. At this mine room-and-pillar wi

    Aug 28, 2017

  • AUSIMM
    The Design, Installation and Commissioning of the Northparkes MinesÆ Lift 2 Ground Handling System

    By I Ross

    The ground handling system needed for the second lift of the underground block caving operation at Northparkes Mines had to link into the existing infrastructure. Production requirements indicated tha

    Jan 1, 2005

  • AUSIMM
    Numeric Modelling of Fluid Flow, Heat Transfer and Combustion in the Kalgoorlie Nickel Smelter

    By Koh P. T L, Varnas S. R

    Fluid flow, heat transfer and combustion in a nickel flash smelter have been investigated by numerical modelling and flow visualisation. The three-dimensional numerical model incorporates turbulent

    Jan 1, 1992

  • AUSIMM
    Laboratory Experiences in the Heat Hardening of Australian High Grade Iron Ores

    By Brien RT, O&apos

    The work reported in this paper extends,-bhsb on the "Heat Hardening of Artificial Magnetite ;Pellets"., which was described at the- International Symposium on Agglomeration ;-sponsored by the America

    Jan 1, 1963

  • AUSIMM
    Project Evaluation and Valuation – An Investor’s Golden Rule

    By L I. Rozman

    "There have always been development projects that fall short of expectations. In the last decade, we have seen more than the usual number of mining and oil/gas development projects taking significantl

    Mar 8, 2016

  • AUSIMM
    Sensors and Systems for the Measurement of Tunnel Movements During and After Construction

    By W Ward, J Clegg, R Barnes, T Zhong

    This paper provides an overview of methods for measuring tunnel deflection and construction’s effects on the surrounding environment during and post construction. It will also review illustrative case

    Sep 17, 2014

  • AUSIMM
    Investigations on Fume Losses at the Sulphide Corporation's Works at Cockle Creek, N.S.W.

    The paper continues an account, begun in a previous paper, of experimental work carried out by the author whilst a member of the metallurgical staff at the Cockle Creek Works. The general method of th

    Jan 1, 1925

  • AUSIMM
    Risk Based Water Management ù Practical Application for Serious Management

    By J L. Merritt

    Effective minesite water management requires that this issue be treated as a risk management exercise. The management process is generally far from simple and by necessity must involve a range of pers

    Jan 1, 2003

  • AUSIMM
    The Nature and Utilization of Iron Blast Furnace Slags

    The term slag has been used to define a wide variety of material including mine spoil and slag produced at steel plants. The present paper is concerned only with the non-metallic alumino-silicates dev

    Jan 1, 1964

  • AUSIMM
    An Overview of Prediction and Control of Air Flow in Acid-Generating Waste Rock Dumps

    By A M. Robertson, R Lefebvre

    Air movement and associated oxygen transport through waste rock dumps has the potential to significantly enhance the rate of oxidation of pyrite-bearing material. While this is a desired outcome for m

    Jan 1, 2003

  • AUSIMM
    Jaguar Base Metals Project Case Study – Has Reality Reflected the Study?

    By R Jacobs

    "The Jaguar project is relatively unique in that it was evaluated, financed, built and operated to completion within the last ten years, providing the opportunity to holistically review and reconcile

    Mar 8, 2016

  • AUSIMM
    The Development of the System of Siphons at Present in Use for Drainage Purposes at North Broken Hill Limited

    With the employment of a system of ore pillars to support the hanging wall during the mining operations at the North Mine, it was found that, when the stopes were worked out and the pillars remained i

    Jan 1, 1938

  • AUSIMM
    Improving Sampling Methodology for the Evaluation of Fines Production at Vanderbijl Park Sinter Plant, South Africa

    By J P. R de Villiers

    The Vanderbijl Park sinter plant in South Africa was investigated to determine the reason for the production of very fine sinter not acceptable as feedstock for the blast furnace. A procedure was desi

    Jan 1, 2008

  • AUSIMM
    Physicochemical properties of steelmaking slags for the mitigation of CO2 emissions in steel sector

    By J H. Heo, J H. Park, M J. Lee

    In this paper, the challenging points regarding the high temperature physical chemistry of slags to achieve the improved and stable electric arc furnace (EAF) or electric smelting furnace (ESF) techno

    Jun 19, 2024

  • AUSIMM
    Evolution of In-Seam Drilling for Gas Drainage

    By F Hungerford

    "In-seam drilling has been undertaken for the past 30 years for gas drainage to reduce the risk ofoutburst and lower the concentrations of seam gas in the underground ventilation. The drillingpractice

    Jun 1, 2012

  • AUSIMM
    Ground Support Selection and Performance Considerations in Seismically Active Mines

    This paper presents a rationale for selecting appropriate support elements which combine to form a support system to maintain stability in mines subjected to both strainburst and the shaking that occu

    Nov 25, 2010

  • AUSIMM
    The Permeability of Some Australian Coals

    By Doig ID, Phillips HR

    As a prelude to studying the sorption desorption and permeability behaviour of coal cores in a triaxial stressing rig using sorb- able gases, the air permeability of typical cores was measured. Lump

    Jan 1, 1982

  • AUSIMM
    Design and Construction of the Yarra River Crossing

    By R Blair

    The Domain and Burnley Tunnels, which are major features of the Melbourne City Link Project, are MelbourneÆs first road tunnels. They are 1.6 km and 3.5 km in length respectively and are being constru

    Jan 1, 1999

  • AUSIMM
    Relocatable modular beneficiation creates value from waste

    By T Graham

    Traditional iron ore wet beneficiation plants are large multilevel structures, often integrated into centralised processing plants. They are characterised by sizeable footprints, substantial water and

    Jul 24, 2017

  • AUSIMM
    Process Requirements for the Direct Condensation of Both Zinc and Lead as Metals in the Polymetallic Smelting of Zn-Pb-Cu Sulphides

    By Warner N. A

    There is an inherent problem in producing simultaneously lead, zinc and copper as metals in a single polymetallic smelting furnace. It relates to the condensation of lead and zinc from the gas phas

    Jan 1, 1989