Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Field Characterisation of Two Full-Scale Waste Rock Piles

    By D J. Williams, G W. Wilson, S, A B. Tran

    A comprehensive field program was implemented to evaluate the internal structure and hydrology of two full-scale waste rock piles. The excavation of waste rock dumps for in-pit disposal at the two min

    Jan 1, 2003

  • AUSIMM
    Getting Back in Front – Time for a Step Change in Engagement Practices

    By K Eglinton

    The extractive industries response to community engagement due to social and political pressures in the 1980s and 1990s was the starting point of development leading to the modern function of corporat

    Nov 22, 2011

  • AUSIMM
    Addressing the Dilemmas of Long-Term Mining Impacts Using a Framework of Sustainability and Adaptive Management

    Many operating hard-rock sulfide mines are predicted to require perpetual post-closure management to prevent environmental degradation. Causes include evaporative concentration of metals and other sol

    Jan 1, 2003

  • AUSIMM
    The Integrity of Cover Systems ù An Update

    By D J. Williams, E M. Rykaart

    Soil cover systems are routinely used to reduce acid rock drainage (ARD) from mine waste rock dumps and tailings impoundments. A technology for the analysis, design, instrumentation and monitoring of

    Jan 1, 2003

  • AUSIMM
    Heat Load Estimation from Conveyor Systems in Mass Mines

    By R Moreby, J Kok, L van den Berg

    The high production rates achieved from mass mining methods such as block caving, sublevel caving and longwall mining require large conveyor belts, trucking loops (diesel/electrical) and rail systems

    Aug 31, 2015

  • AUSIMM
    The Use of High Resolution Geophysical Technologies to Map the Base of Ore at BHP Billiton Æs Yandi Channel Iron Deposit

    By G Hall

    BHP BillitonÆs (BHPB) Yandi ore deposit is a channel iron deposit (CID) in the Pilbara district of WA. The ore is predominantly a goethite-hematite pisolite and overlays a clay at the base of the depo

    Jan 1, 2002

  • AUSIMM
    Particle Size Analysis – Optimising Returns in Iron Ore

    By B Stump

    Reliable particle size analysis in minerals processing plants is a critical factor to the economic return of a plant. As recovery of valuable minerals is compromised for particles outside the optimal

    Jul 11, 2011

  • AUSIMM
    Best practice sampling QA/QC for gold and base metal mining – including how to assess the applicability of underground reverse circulation grade control sampling

    By J T. Carswell

    Best practice mine sampling should provide a detailed quantification of all potential sources of error at each stage of sampling, sample preparation and assaying.Quality assurance (QA) should include

    Sep 20, 2017

  • AUSIMM
    Beyond CIP/CIL - A Combination of Existing Technologies Utilising Gravity, Flotation and Intensive Leach May Herald the Future for Gold Ore Processing

    With the burgeoning opportunities for new gold mines to be developed the opportunity now exists for a reassessment of the optimal processing path for these gold ores. Projects have traditionally follo

    Jan 1, 2004

  • AUSIMM
    Evaluation of Underground Mining Options at Xstrata Copper's Ernest Henry Copper-Gold Mine

    By P Christen, D R. Ashley, G R. Power

    The Ernest Henry Mine is currently a copper-gold open pit operation situated in north-west Queensland, Australia. It is owned and operated by Xstrata Copper with a current throughput of 11 million ton

    Jan 1, 2009

  • AUSIMM
    Guidelines for Economic Evaluation of Projects

    By P Card

    “Let’s get discipline and quality into easy to understand evaluations!” Project Managers and MetPlant Operators accept poor quality evaluations because they are generally unaware of what they should

    Aug 8, 2011

  • AUSIMM
    The AMC Narngulu Synthetic Rutile Plant

    By Rolfe PR, Ellis BA, Clements RJ

    Associated Minerals Consolidated Limited (AMC) is constructing a 112,500 tonne/yr synthetic rutile plant at Narngulu, near Geraldton in Western Australia. Design of the plant is based on the techn

    Jan 1, 1986

  • AUSIMM
    Durability Planning for Underground Infrastructure

    By D Wimpenny

    Underground infrastructure is often a critical component of transportation and utility schemes. It is characterised by long design lives with limited access for inspection and maintenance. The exposur

    Mar 8, 2011

  • AUSIMM
    A Toolbox of Ideas for the Geoscientist Working on Block Cave Mines

    By N Burgio

    Block cave mines are often thought of as rock factories where high volumes of production are mined from a fixed area suggesting little requirement for geological input and control. Yet caving operatio

    Aug 22, 2011

  • AUSIMM
    Latest fifth generation (Mk V) gyratory crushers with focus on safety and maintenance features

    By W Malone, J Garrett

    FLSmidth (FLS) has spent the last 15 years, working with customers and engineering houses to deliver innovative improvements in crusher safety, coupled with the latest, maintenance friendly, crusher d

    Sep 18, 2023

  • AUSIMM
    Innovations in the Northbridge Tunnel, Perth - Exploiting the Aardvark Principle

    The Graham Farmer Freeway Project in Perth, Western Australia, is the largest urban infrastructure project ever carried out in the State. At a project cost of over $360 million, it also ranks as one o

    Jan 1, 1999

  • AUSIMM
    The Augmented Mine Worker – Applications of Augmented Reality in Mining

    By J Bassan

    The mining industry is faced with imperatives to improve worker safety and productivity, adapt to skills shortages, high worker turnover rates, and provide more effective maintenance to new and ever m

    Nov 22, 2011

  • AUSIMM
    Characterising Rock Mass Properties for Fragmentation Modelling

    By A Scott, I Onederra

    A great deal of technical and research effort has been applied to the development of models to predict fragmentation from rock blasting. A number of quite useful empirical or engineering models are cu

    Aug 24, 2015

  • AUSIMM
    Loading Mechanics of the æCanÆ and Implications for Improved Strength and Stiffness Properties

    Improved roof control in high deformation tailgate environments has been achieved over the last decade through development of stiffer and increased capacity standing support products. æThe CanÆ is one

    Jan 1, 2005

  • AUSIMM
    Baseline Requirements for Biological Monitoring Programs Used to Assess Mining Impact

    By C L Humphrey

    Biological monitoring programs for environmental protection require techniques that will provide both early detection of possible adverse effects, and assessment of the ecological significance of th

    Jan 1, 1994