Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft

    By N Herault

    PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro

    Mar 21, 2011

  • AUSIMM
    Nova copper-nickel project optimisation of the copper rougher-scavenger circuit through advanced measurement and control

    By M Thompson, N Vines, Z Hearne, S Lam, G A. Gomes-Sebastiaõ, D van der Spuy

    Construction and commissioning of the Nova Copper-Nickel project of Independence Group was completed in late 2016. The plant is in the Fraser Range of Western Australia, about 120km east of Norseman a

    Aug 29, 2018

  • AUSIMM
    The use of Geometallurgical Relationships in Process Route Selection and Mine Plan Optimisation for the Dutwa Nickel Project

    By C Czerny, T Elkington, L Lorenzen

    The Dutwa Nickel Project is a nickel laterite atmospheric leach project located in Tanzania that has been under development by African Eagle Resources plc (2012). A bankable feasibility study (BFS) ha

    Sep 29, 2013

  • AUSIMM
    Universal Reconciliation – A Multidisciplinary Approach across the Entire Mining Value Chain to Identify Loss of Value and Maximise Operational Performance

    By R Hargreaves, C Morley

    The authors often see problems on mine sites that are due to insufficient feedback between technical discipline silos as the realities on the ground fail to inform the models and plans used to drive r

    Aug 18, 2014

  • AUSIMM
    Red Dome Mine Closure - Addressing Mine Site Contamination Issues for Lease Relinquishment

    By S Logan, J Pu, J Milsom, G McDonald

    Management of environmental issues is an integral part of the mine decommissioning process. In Queensland, miners must comply with environmental aspects of the Mineral Resources Act and Contaminated L

    Jan 1, 1998

  • AUSIMM
    Mine Hoist Safety ù Selected Aspects

    This paper summarises the current status of the mining sector in Poland in terms of vertical transport system safety. Selected results of research programs conducted at the AGH-UST relating to mine ho

    Jan 1, 2005

  • AUSIMM
    The Importance of Reliable Ore Reserve Estimates for Development and Financing of Hellyer

    The grade (or value) to volume relationship which constitutes a target orebody is used to show that the concentration of diamonds in an economic deposit may be as low as O.Olg/t. Diamond valuations

    Jan 1, 1990

  • AUSIMM
    Acid Rock Drainage Prediction and Waste Rock Segregation Plan for Ankerite-Containing Mine Waste ù Restigouche Mine Case Study

    By R Carreau

    The results of a detailed acid rock drainage (ARD) prediction program were used to revise the waste rock segregation criteria at the Restigouche open pit mine. Waste rock at the site was predominately

    Jan 1, 2003

  • AUSIMM
    The Practice of Mine Ventilation in Western Australia

    This paper comprises a discussion of standards for comparing conditions in mines, of methods for measuring the flow of air, of a comparison of fan performances, and the application of these matters to

    Jan 1, 1939

  • AUSIMM
    Comparison of Semi-autogenous Mills Operations in Andean Countries

    By J Rayo

    Andean countries (Chile, Peru, Bolivia and Argentina) have 42 semi-autogenous mills (SAG) in operation and there are more than 30 projects in the pipeline that consider SAG mills. At the end of the ne

    Sep 1, 2014

  • AUSIMM
    Mines versus Mineralisation – Deposit Quality, Mineral Exploration Strategy and the Role of ‘Boundary Spanners’

    By J P. Sykes, T C. McCuaig, J E. Vann

    Resources added to the global metal inventory through exploration over the past 15 years have been generally of poor quality (declining grades, recoveries and lack of acceptable financial return). Sim

    Aug 18, 2014

  • AUSIMM
    TiRON – A New Process for the Production of High-Grade Feedstock for TiO2 Pigment Manufacture

    By J M. Shekiro

    In the chloride process to manufacture TiO2 pigment, feedstocks containing higher TiO2 contents (high-grade ores or HGOs) are favoured in order to minimise production of undesirable by-products. Most

    Oct 5, 2011

  • AUSIMM
    Closure Cost Estimation - All Things to All Men?

    By H Jones

    Closure cost estimates may be generated at any stage of a mining operationÆs life; commencing with the initial prefeasibility studies and continuing through to the final decommissioning cost estimates

    Nov 20, 2012

  • AUSIMM
    Simulation study on crucial parameters of long-compressive and shortsuction ventilation in large section roadway excavation of LongWangGou coalmine

    By H Wen

    LongWangGou coalmine auxiliary inclined shaft heading face has a large section, fast heading speed, and large dust production. The problems of high concentration and wide distribution of dust in the r

    Oct 12, 2022

  • AUSIMM
    Permitting in the face of uncertainty – how to deliver confidence to regulators and investors

    By R L. Grogan

    Mining is currently undergoing a progressive expansion into novel environments (such as the deep ocean), commodities (such as tantalum, rare earths, and other ‘green economy minerals’), and new method

    Jul 25, 2018

  • AUSIMM
    Geopolymer Concrete for a Sustainable Future

    By S E. Wallah, D Hardjito, B V. Ran

    The manufacture of Ordinary Portland Cement (OPC) is not only energy-intensive but also releases a significant volume of carbon dioxide (CO2) to the atmosphere. In addition, OPC in concrete often caus

    Jan 1, 2004

  • AUSIMM
    Mine Road Design and Management in Autonomous Hauling Operations – A Research Roadmap

    By R J. Thompson

    In truck-based hauling systems, the mine haul road network is a critical and vital component of the production process. As such, underperformance of a haul road will impact immediately on mine product

    Nov 22, 2011

  • AUSIMM
    Blast Design Using Measurement While Drilling Parameters

    By M Higgins

    Measurement while drilling (MWD) techniques can provide a useful tool to aid drill and blast engineers in open cut mining. By avoiding time consuming tasks such as scan-lines and rock sample collectio

    Jan 1, 2001

  • AUSIMM
    Machine Monitoring and Automation as Enablers of Lean Mining

    By L Mottola

    Three decades ago mining companies, principally in North America, aided by machine and explosive manufacturers, started significant attempts to develop and implement automated mining systems, mainly u

    Nov 22, 2011

  • AUSIMM
    Detecting Sampling Biases in Metal Accounting

    By L Lachance, F Flament, D Leroux, S Gariépy

    The pervasiveness of poor sampling practices in and around mineral processing plants could seem intriguing in view of the various documented evidences both for causes and consequences. To this extent,

    Jul 29, 2014