Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Prediction of Optimum Cleaning Results for an Undeveloped Coal SeamBy Sanders GJ
Coals from the Southern Coalfield of New South Wales treated in the Port Kembla coal preparation plants of Australian Iron and Steel Pty Ltd differ substantially in their characteristics. Knowledge o
Jan 1, 1970
-
Power Supply for Resource Projects (8ecc30a6-60bd-418c-872d-5915924f6785)The provision of electrical power is an important consideration in project development. The first step to be taken in this area is to assess the power requirements of the project. The alternatives of
Jan 1, 1990
-
Design of Segmental Lining for Waterview Project, Auckland, New?ZealandBy S Pradhan, A Kuras, R Mahajan
This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan
Sep 17, 2014
-
Role of Bubbles in the Action of Flotation AgentsRole of Bubbles in the Action of Flotation Agents
Sep 13, 2010
-
Feasibility Study for a Silicon Industry in Southland, New ZealandReserves of high-grade quartz gravel, lignite, and timber suitable for the production of silicon metal and ferrosilicon on large scale occur within 40 miles of Bluff Harbour. Undeveloped hydroelectric
Jan 1, 1971
-
Development of a Process Simulation Package for Mineral Processing PlantsBy Riley TW
This paper describes a Process Simulation Package for modelling the steady-state operation of a mineral processing plant. There are two levels of input allowed into the package. The first allows simpl
Jan 1, 1985
-
Spherical Element Bulking Mechanisms for Modeling Blasting Induced Rock MotionBy Taylor L. M
Accurate computer prediction of the muck pile produced by a conventional blast requires modeling of the physics that occurs during the rock motion phase of a blast. The ability to predict the motio
Jan 1, 1990
-
Blast Design Considerations for In-Situ Retorting of Oil ShaleBy Paine GG
The in-situ retorting of shallow oil shale deposits is an attractive alternative to the material handling problems of conventional open pit mining techniques, which involve removing overburden, fragme
Jan 1, 1985
-
Computer Packages For Chemical Modeling of Aqueous System - Blind Faith!Predictive chemical models facilitate the selection, design and assessment of aqueous chemical processes. The development of expertise in aqueous themochemistry has not matched the explosion in comput
Jan 1, 1996
-
Martabe Gold Mine, Indonesia: a positive solution for positive reconciliationBy M Angus, S Konopa, A Virisheff, S Crispin
A positive mill reconciliation at a mine is a double-edged-sword. Much back slapping happens. The bank and the board can’t get enough until the downside becomes apparent. Over a prolonged period, ther
Nov 21, 2018
-
Planning and Designing Cavities for Underground Power House in HimalayasBy Garg R. K
Himalayan ranges on the northern border of India are source of many perennial rivers and suitable sites for large dams have been located therein. However, Himalayas are young mountains and compris
Jan 1, 1987
-
A Performance Prediction Model for Optimized Drilling and Blasting CostsBy Pandey A. K, Srivastava A, Das A
Drilling and blasting constitute important activity in mining operations and account for around 20% of the total excavation cost. The utilization coefficient of energy for explosions of the fragment
Jan 1, 1990
-
Modelling Assisted In Situ Leach Mining for Non-Ferrous MineralsBy S Hancock, B H. Brady, H Muhlhaus
The aims of this paper are to present the governing science, verify the performance and demonstrate the potential engineering applications of a computational simulator for in situ leach mining of non-
Jan 1, 2000
-
Hot Dip Tinning Operations at Port KemblaA commonplace, sometimes overlooked or taken for granted, article of everyday existence is the tin can. Produced from thin gauge low carbon steel, and commonly coated with a mere 60 millionths of an i
Jan 1, 1958
-
Evaluation of Quality Parameters for Assessment of Steaming Coal UtilisationBy Dyne GD
From experience in the design and operation of power station combustion facilities in most mainland Australian States, involving a wide range of black coals and lignites, and in the specification
Jan 1, 1983
-
Development of Robot System for Automatic Assembling of Bolted SegmentsBy Harada M, Katsuta S
In order to shorten the time taken to com- plete shield tunnel excavation work, reduce labor costs and to improve safety, an automatic assembly robot system for the segments used has been developed
Jan 1, 1987
-
Initiating-Systems for Underground Mass Firings Using Large Diameter BlastholesBy Rashleigh C
The selection and application of an effect- ive firing system first require a clear under- standing of the initiating abilities of the com- ponents in such systems. The conditions under which charges
Jan 1, 1978
-
Practical Ventilation Planning for Mine Management Using a Digital ComputerBy Hempenstall J, English W
Mine management has a responsibility under the various acts of state parliaments for the adequate ventilation of existing workings. It also has a need to plan adequately for the ventilation of pro
Jan 1, 1983
-
Commodity - Linked Borrowing Opportunities for Resource - Oriented Projects and CompaniesThe traditional form of project financing for resource related projects has involved project financings structured with either recourse to the project sponsor(s) or commercial banks accepting the proj
Jan 1, 1985
-
Up-Draught Sintering at Port PirieBy Adams F. C, Ridley K. L
Economic conditions after WorId War II made the recovery of Australian sources of sulphur one of considerable national importance. From 1947 to 1949 an investigation was made of recirculation techniqu
Jan 1, 1956