Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimising Carbon Management – Increasing Gold Recovery and Decreasing Costs with the Carbon Scout

    By T D. H McGrath, O Baker, W P. Staunton, C Ypelaan

    "The carbon-in-pulp process has been used extensively in the gold industry since the late 1970s to recovery leached gold from solution. Despite more than 30 years of experience in operating carbon cir

    Oct 10, 2016

  • AUSIMM
    Active and Passive Seismic Monitoring of Cave Front Evolution

    By R A. Lynch

    The state-of-the-art in cave seismic monitoring is reviewed, with the latest developments in active seismic monitoring included. Seismic monitoring systems are routinely used by most of the world’s bl

    May 9, 2016

  • AUSIMM
    Using liquid nitrogen for the inertisation of goafs

    By D Caley

    During the response to the Moura No 4 disaster, use was made of the New South Wales Mines Rescue Service’s ‘Mineshield’ inertisation equipment. The equipment had to be transported from Newcastle, appr

    Aug 28, 2017

  • AUSIMM
    Optimisation of the Peak Gold Mine’s Processing Plant through Advanced Process Control

    By J Hartog, V Beehan, D Beeson

    Treating an ore blend from five different deposits at Newgold’s Peak Gold Mine (PGM) has always been a challenge due to the inherent variability between each of the orebodies.Operating the processing

    Sep 1, 2014

  • AUSIMM
    Analysis of dust behaviour in the face zone utilising- CFD modelling tools

    By O Joneydi, J Viljoen, R Funnell

    Computational Fluid Dynamics (CFD) modelling is a useful tool that can assist engineers in designing effective ventilation systems for the control of airborne dust generated during mining operations.

    Oct 12, 2022

  • AUSIMM
    On-Belt Analysis at Sepon Copper Operation

    By T Arena

    To maintain copper recoveries and maximise production at the Sepon Copper Operation it is crucial to control the amount of copper entering the leaching circuit. This requires close control of blending

    Aug 8, 2011

  • AUSIMM
    Geostatistical Simulations of Kimberlite Orebodies and Application to Sampling Optimisation

    By M Field

    Kimberlite pipes, as opposed to dykes, sill and secondary deposits, are the primary target for diamond exploration companies because they have simple geometries and can contain large volumes of potent

    Jan 1, 2006

  • AUSIMM
    Sampling for the percentage moisture in the iron ore industry

    By M Fritz, B Ziegelaar

    "For moisture samples, the International Standard for iron ore sampling states the following: Moisture samples shall be processed as soon as possible and test portions weighed immediately. If this

    May 9, 2017

  • AUSIMM
    A Three-Dimensional Simulation of Mine Ventilation Using Computational Fluid Dynamics

    By J Naser, M Tuck

    This paper reports a computational study using computational fluid dynamics (CFD) in a mine ventilation system. Ambient air is injected to a rectangular mine drive through a circular duct. Moisture ev

    Jan 1, 2005

  • AUSIMM
    Power Supply for Remote Mining Developments

    By Bailey H. W

    Power supply for remote mining developments is compared with supply to the general public with the conclusion that the private power plant operator has many opportunities to minimise his costs whi

    Jan 1, 1973

  • AUSIMM
    Ramp-up and long-term performance of the Albion Process™ plant at GeoProMining Gold Armenia

    By D Walker, A Tsvetkov, P Voigt, O Kloiber-Deane

    The GPM Gold Operation has been employing an Albion Process™ plant at its Sotk (Zod) gold mine in Armenia since 2014. Long term data from the operation is now being published for the first time. The

    Aug 29, 2018

  • AUSIMM
    Porgera Flotation Circuit Upgrade and Expert System Installation

    By M Schaffer, T Kewe, N Moffatt

    Porgera mine is 95 per cent owned by Barrick Gold Corporation. It is located at an altitude of 2200–2700 m above sea level in the Enga province of Papua New Guinea and produces approximately 460 000 o

    Sep 1, 2014

  • AUSIMM
    Regulatory Perspective ù Development of Closure Plan With Adequate Financial Assurance for the Protection of Ground Water Quality at the Chino Copper Mine

    By K Myers

    Since the mid-1990s, the Chino Mine Facility (Chino) located near Silver City, New Mexico has been developing a closure plan with financial assurance to protect water quality, as required by State reg

    Jan 1, 2003

  • AUSIMM
    The Application of Refrigeration in Mechanised Mines

    Australia has a long history of underground mining. Even withadvances in open cut mining equipment, techniques andeconomics, many orebodies are still best mined by undergroundmeans. In addition, moder

    Jan 1, 2001

  • AUSIMM
    Fosterville Gold Mine Heated Leach Process

    By M Binks

    The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo

    Aug 8, 2011

  • AUSIMM
    Transcending the Mining Discipline Divide – Multidisciplinary, Interdisciplinary or Transdisciplinary?

    By J Coombes

    "In today’s challenging climate of reduced staffing, limited funding and uncertain markets, we are called on to operate more productively and ‘be more innovative’. As an industry, we are quick to iden

    Mar 8, 2016

  • AUSIMM
    Improvement strategies for accurate underground drilling and blasting effectiveness at the Barrick Kibali Gold Mine

    By F M. Senda

    This paper highlights strategies used at the Barrick operated Kibali Gold Mine (KGM) to improve the drilling accuracy and blasting effectiveness for longhole open stoping. The mine currently uses Solo

    Mar 29, 2023

  • AUSIMM
    Is a 2.5áper cent Success Rate Good Enough? Traditional Mine Development Methods have the Tail Wagging the Dog

    By J Jackson, D C. Curry, A C. Keith

    Australian Bureau of Statistics (ABS) data shows that since 2006 the balance of capital costs associated with mine development has become weighted greater than 75 per cent to enabling infrastructure a

    Sep 29, 2013

  • AUSIMM
    Predicting Iron Ore Fines Shipment Moisture

    By J E. Everett, D Linden, P Maney

    In response to the implementation of a new schedule for iron ore fines in the International Maritime OrganizationÆs (IMO) International Maritime Solid Bulk Cargoes (IMSBC) Code, improved measures for

    Aug 12, 2013

  • AUSIMM
    Understanding the State of Innovation in the Iron Ore Industry

    By D Andrew, G Stanway, P Mahoney, C Griebel

    The iron ore mining industry is currently going through an adjustment from high to more moderate growth as China’s economy transitions from capital-intensive investment to a more services-oriented eco

    Jul 13, 2015